| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance B 2 6 RAJ BHAWAN VIDYASAGAR PALLY DURGAPUR BARDHAMAN WEST BENGAL 713213 | PASCHIM BARDHAMAN | WEST BENGAL | 713213 | -8.99% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹18.0 L (12.1%)Admitted-Finance VILL RAMBAGH P O BHAGWANGOLA P S BHAGWANGOLA DIST MURSHIDABAD | BHAGWANGOLA | MURSHIDABAD | WEST BENGAL | +2.00% | ₹1.7 Cr+₹18.0 L (12.1%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Shortfall not complied |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
20 Jul 2026, 6:00 pmClosed
SE/SOUTH CIRCLE/SD SECTOR
SE/SOUTH CIRCLE/SD SECTOR
Construction of Drain from 16 anaya graveyard to Pardankuni Khal via Vivek Engineering and Casting Ltd at Ward No. 01 under Dankuni Municipality under State Fund. (2nd call)
2026_KMDA_1029741_1
04/SE (South)/SD/KMDA of 2026-2027 Dated 18/06/2026 (2nd call)
Open Tender
CIVIL WORKS
Percentage
180 days
Dankuni
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3.3 L
12 Aug 2026
25 Jun 2026
22 Jul 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. In ground floor including roof.
a)Upto 150mm. thick. | 6.75 | Cum | 939 | ₹6,338.25 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 2,115.75 | %Cum | 11,927 | ₹2,52,34,550.25 |
| 3 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).
(a) Depth upto 1.5 m. | 224 | Sqm | 386 | ₹86,464 |
| 4 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 1,528.2 | Cum | 166 | ₹2,53,681.2 |
| 5 | Supply of silver Sand and Stacked at site. | 11.93 | Cum | 571 | ₹6,809.89 |
| 6 | Supplying empty Cement bags in good condition. | 545 | Each | 3.3 | ₹1,798.5 |
| 7 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. | 545 | Each | 3.5 | ₹1,907.5 |
| 8 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site. | 545 | Each | 6 | ₹3,270 |
| 9 | Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge. | 2,700 | HP-Hr | 23 | ₹62,100 |
| 10 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 224.18 | % Cum | 71,181 | ₹1,59,57,356.58 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
Tendernotice_2.pdf
PDF • 1.19 MB
Tendernotice_3.pdf
PDF • 1.40 MB
BOQ_2528837.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .