Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹5.1 L+₹253.86 (0.05%)Rejected-Finance | L2 | Rejected-Finance Not Lowest Bidder | |
| 3 | L3₹5.1 L+₹5,331.07 (1.05%)Rejected-Finance | L3 | Rejected-Finance Not Lowest Bidder | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical CHAPRA NADIA | CHAPRA | NADIA | WEST BENGAL | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.1 L
EMD Value
₹10,154
Closing Date
21 Aug 2026, 5:00 pmClosed
E.E
4,M.G.Road, How-1
Repairing and renovation of road by Cement Concrete work (M-20) to maintain pot-holes free road at Shanti Nagar, Natun Para, Kankra Para, Molla Para more, PuilyaSatsangha under ward no- 41,45 and 46 HMC
2026_MAD_1035823_6
WB-HMC/NIT/ED/07/EE-II/26-27
Open Tender
CIVIL WORKS
Percentage
30 days
ward no-41, 45, 46
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
₹10,154
Yes
8 Oct 2026
4 Aug 2026
24 Aug 2026
4 Aug 2026
21 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of and grade as per direction and satisfaction of Engineer-in-charge in cluding uprooting and removing plants and jungles when and where needed. (a) Depth upto 150 mm [PWD(Rds), P-237, It-3.16] | 394.91 | M2 | 14.4 | ₹5,686.7 |
| 2 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) [P.W.D(Bldg) w.e.f 01.11.17, P-2,It-4(A)] | 39.49 | % M3 | 711.81 | ₹28,109.38 |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand [P.W.D(Bldg) 3RD Corrigenda Addenda w.e.f 04.06.18, P-1,It-1] | 349.91 | M2 | 357 | ₹1,24,917.87 |
| 4 | Brickwork with 1st class bricks in cemenmt mortar (4:1) (i) In foundation and plinth [PWD(Bldg) 3RD Corrigenda Addenda w.e.f 04.06.18,P-1,It-7] | 4.26 | M3 | 5,560 | ₹23,685.6 |
| 5 | Hir and labour charges for shuttering with hard wood for precast R.C Slab curved or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc complate in all respect (Only the area in contact with concrete to be measured) [PWD(Bldg) w.e.f 01.11.17, P-43, It-38] | 2.4 | M2 | 94 | ₹225.6 |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (i) Tor steel/Mild Steel (a) SAIL/TATA/RINL Do" 9th Corrigenda & Addenda, P-1, It-40(a)(I)&(b) | 1 | MT | 60,433 | ₹60,372.57 |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety [PWD (Bldg) w.e.f 01.11.17, Analysed Rate] | 40.09 | M3 | 5,820.62 | ₹2,33,348.66 |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (A) With 1:4 cement mortar-15mmm thick (a) In Ground floor [P.W.D(Bldg) 3RD Corrigenda Addendaa w.e.f 04.06.18, P-50,it-2] | 28.38 | M2 | 160 | ₹4,540.8 |
| 9 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.[Ref : P.W.D.(Bldg) w.e.f 01.11.17, Page- 192, Item No. 15] | 28.38 | M2 | 34 | ₹964.92 |
| 10 | ADD 18% G.S.T | 1 | No. | 76,682.16 | ₹76,682.16 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 5.89 MB
BOQ_2544996.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .