| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC 4 13A PERIYAR NAGAR THANGAMAPURIPATTANAM METTUR DAM 636 402 SALEM DT TAMIL NADU | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹5.0 L Quoted ₹4.2 L | 1 | Accepted-AOC L1 |
Tender Value
Refer Docs
EMD Value
₹4,100
Closing Date
11 Jan 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I MP AC Plant Dismantling Air Handling Unit Model 5 Air handling units in ESP I II and III each 2 Nos and CHP MCC 1 2Nos removing existing cooling coil replacing New Cooling coil base plate and canvass cloth etc
2023_EB_404094_1
CE / MTPS-I / SE/ M-I /MP/OT.350/2023-24
Open Tender
Power/Energy Projects/Products
Works
60 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹4,100
Yes
14 Feb 2025
28 Dec 2023
12 Jan 2024
28 Dec 2023
11 Jan 2024
28 Dec 2023
Amount
Charges for dismantling air handling unit like covers, shaft, vanes, pulleys, fins coil and filters.
Charges for scratching and cleaning, then painting of epoxy zinc chromate premier one coat and epoxy smoke grey painting two coat for AHU. { Paint under contractor scope }. {The above work is inline with cleaning, then painting of epoxy zinc chromate premier one coat and epoxy smoke grey painting two coat for structures spray room tank pipes, eliminator frame, water strainer structure, AWS blower}
Charges for loading and Unloading of new cooling coils from central stores to respective Air Handling Unit's room and devolution of the worn out cooling coils as scraps to store. {The above work is inline with loading and Unloading of new cooling coils from central stores to Air Handling Unit's of Unit IV & V AC Plant room and devolution of the worn
Charges for changing the canvas cloth { 1No out let damper in a AHU } (including cost of materials)
Charges for dismantling, fabrication and reassembling of AHU’s Bottom fabricated base plate (16 SWG GI Sheet) with support fixing cooling coil tubes top and side covers then fixing the fan shaft and bearing etc as per the dimension in the drawing with appropriate manner
Charges for cutting and removing the existing damaged cooling coil from the respective air handling units, fixing the new cooling coil with Aluminum fins by positioning properly with chill water suction and discharge pipe lines in both sides, assembling with new bolt & nuts, conducting leak test, commissioning as per the direction of Engineer in charge
Cost of Zinc Phosphate Epoxy primer
Cost of Epoxy paint smoke grey
Cost of Epoxy Thinner
Cutting gas
40NB Gate valve
25NB Gate valve
25NB Nipple
40NB GI Pipe
25NB GI Pipe
16 SWG(1.6 mm ) GI Sheet
“ Y” Strainer 40 NB flange end with Gauge well
Charges for consumables and T & Ps for Sl.No.1 to 6.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .