Tender Value
Refer Docs
EMD Value
₹7,420
Closing Date
4 Dec 2025, 11:00 amClosed
Executive Engineer
Regal Lane Lal Chowk Srinagar
Construction of storm water drain near H/o Pervaiz Ahmad Bhat and Reyaz Ahmad Bhat at Alamdar Colony Lane F.
2025_HAUDD_296746_1
e_NIT_NO_48_CDC_of_2025_26
Open Tender
Civil Works
Percentage
10 days
Alamdar Colony Lane F Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
Ex. Engineer City Drainage Civil Division SMC Sgr.
₹7,420
Yes
4 Dec 2025
29 Nov 2025
4 Dec 2025
29 Nov 2025
4 Dec 2025
29 Nov 2025
Dismantling and Sacrifying of road surface including stacking of serviceable material within 50Mtr led WBM .
Earth work in excavation by manual means trenches for foundations drains, pipes and cables (not exceeding 1.5m.in width) and for shafts, wells cesspits and the like not exceeding 10 Sqm on plan, including dressing of side and ramming of bottoms lift upto 1.5 m including getting out excavated earth and disposal of surplus excavated earth by directed All kinds of Soil
Earth work in excavation by mechanical means trenches for foundations drains, pipes and cables (not exceeding 1.5m.in width) and for shafts, wells cesspits and the like not exceeding 10 Sqm on plan, including dressing of side and ramming of bottoms lift upto 1.5 m including getting out excavated earth and disposal of surplus excavated earth by directed All kinds of Soil
Providing and laying of stone soling in trenches for drain including manholes.
Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:4:8 (1cement:4coarse sand: 8graded stone aggregate 40mm nominal size) Crushed
Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:3:6 (1cement: 3coarse sand: 6graded stone aggregate 40mm nominal size) Crushed
Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:1.5:3 (1cement: 1.5coarse sand:3graded stone aggregate 40mm nominal size) Crushed
Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate 20mm nominal size) Crushed
Reinforcement for R.C.C. work including straightening cutting bending ,placing in position and binding all complete -
Centring & shuttering including strutting propping etc. & removal of form work for:- a)-vertical wall
Suspended floor
Edges of slab
Providing and laying of pipes 300 mm dia including jointing by gas kit, complete job.
Filling of available excavated earth ( excluding rock) in trenches, plinth , sides of foundation etc. layers not exceeding 20cm in depth , consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5 m
Carriage of materials by mechanical transport including loading, unloading & stacking from approved source to site of work:- 40mm N.S Stone soling Agg.
20mm N.S. stone agg.
Sand from Ganderbal avg. lead of 24 Kms.
Pipe 12 Km
Disposal of surplus earth
GSB filling
fixing and carriage of manhole covers.
Supply of manhole covers to be supplied by the department. 05 No.x@3300= 16500.00
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_961620.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .