| 1 | L1₹36.4 LAccepted-AOC FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹40.1 L+₹2.7 L (7.36%)Rejected-AOC ROOM NO 997 GALI NO 3 PART NO 3 GANESH MURTHY NAGAR CUFFE PARADE COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L2 | Rejected-AOC Other than being lowest | |
| 3 | L3₹47.1 L+₹9.8 L (26.3%)Rejected-AOC | L3 | Rejected-AOC Other than being lowest | |
| 4 | L4₹49.9 L+₹12.6 L (33.6%)Rejected-AOC FLAT NO A 102 ASHOKVAN RAJSHIV CO OP HSG SOC SHIV VALLABH ROAD DAHISAR EAST MUMBAI 400 068 | MUMBAI SUBURBAN | MAHARASHTRA | 400068 | L4 | Rejected-AOC Other than being lowest | |
| 5 | L5₹50.7 L+₹13.4 L (36.0%)Rejected-AOC | L5 | Rejected-AOC Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
29 Jul 2022, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIR TO KITCHEN BATHROOMS TILING SUNKEN FLOORS TREATMENT CI PVC PIPES AND MISC BR REPAIRS AT NEW RS COLABA NAVY NAGAR UNDER GE NW NAVY NAGAR COLABA MUMBAI
2022_MES_532792_1
8286/CWE (NW) Mumbai/ E8
Open Tender
Civil Works
Item Rate
270 days
GE (NW) Navy Nagar
Class C
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
₹1.5 L
Yes
13 Sept 2022
22 Jun 2022
1 Aug 2022
22 Jun 2022
29 Jul 2022
15 Jul 2022
22 Jun 2022 - 13 Jul 2022
Amount
Demolition of lime concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour cement concrete 1:5:10 E2 type with with 40mm graded stone coarse aggregate in sunken floor complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Treatment of sunken floor slab comprises of the following specifications and all as specified (i) Material and labour for cleaning of the sunken /lowered portion of the RCC slab surface (including vertical total depth plus skirting height) of floors by wire brush, chiesel out any mortar sticking to the surface and brooming / washing completely. 40 mm avg thik pcc 1:2:4 type B-0 using 12.5 mm graded aggregate as in padding conc to achieve proper slope including 50 mm dia 350 mm long medium grade GI pipe spouts with wire guage on inside mouth to be fixed
(ii) Rendering of uneven surfaces with 6 mm thick CM 1:4 mixed with and incl integral WPC @3% of weight of cement consumed. fill it with water and check dampness and seepage. where dampness and seepage noticed nozzles shall be fixed and grouting carried out (iii) All junctions points of side walls where CI/GI pipes are passing through shall be sealed with epoxy putty (iv) After drying putty wash the slab and sides of sunken portion with water and make it clean and clear (v) Material and labour for applying two coat of polymer modified cementious water proofing coating as per manufactures instructions to bottom and vertical sides up to finished flooor level +100 mm height. The thickness of two layer shall be 1 mm. When the second layer is still sticky , coarse sand spry shall be carried out or vertical and bottom surface of the sunken portion all as specified and directed.
(vi) Plaster the bottom and sides up to bottom of the skirting with minimum 20 mm thk cm 1:4 mixed with and incl integral WPC 3 % of cement consumes as per manufacures specification including rounding of corners and junctions sloping towards spout Note:Test the water proofed area (ponding test) by filling water for atleast 72 hours and tested for leakage seepage and to the entire satisfaction of GE . Test shall be done in presence of reps of PMG and record for each sunken slab shall be maintained. the treatment shall be carried out by authorised applicators of chemicals.
(vii) All pipes laid in sunken portion shall be covered with 50 mm thk PCC 1:3:6 all around after painting with anticorrossive black japan paint (viii) Height up to and including 14th floor
Material and labour Dismantling floor, hearth, or wall tiling incl cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour non skid coloured ceramic tiles 300 x 300 x 6 to 7mm in floors set and jonted in neat cement slurry and pointed in white or colour cement to match the colour of tiles over and including 15mm thick cement mortar screed bed in CM 1:6 complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for glazed ceramic coloured tiles as in dado like WC, Bath, Kitchen etc of size 300 x 200 x 7mm thick set and jointed with neat cement slurry and pointed with white cement, including 10mm thick rendering in CM 1:4 as backing coat complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for glazed ceramic coloured tiles as in dado of size 300 x 450 x 7mm thick set and jointed with neat cement slurry and pointed with white cement, including 10mm thick rendering in CM 1:4 as backing coat complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour in repair CI Floor trap dia of outlet 75mm with CP grating including jointing to waste pipe fixed in cement concrete type B-1 (1:2:4) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair vitreous china squatting pan 'Orissa pattern' long pan of size 580x 440mm with integral foot rests white with 'P' or 'S' with cement joint,front or back inlet incl connection to trap and to flushing pipe,anti-syphonage pipe and making good the floor to match the existingcomplete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repairs for 10 ltrs capacity PVC Valveless, syphonic action type, flushing cistern, low level, white, with inlet, ball valve, float and handle including brackets flushing cistern and flushing pipe of suitable length, and PVC connection 450mm long complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repairs vitreous china wash down water closet semi pedastal pattern (Anglo-Indian type) white (excluding fixing bolts, flushing cistren and flush pipe) with 'P' or 'S' trap complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing Plastic water closet seat cover, closed pattern with flat bottom, and cover and mild steel chromium plated or aluminisied hinges devices complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair chromium plated telephonic health faucet shower with flexible tube of stainless steel, 1.5 Mtr long & hook, multi flow 15mm dia for iron pipe or for brass ferrule complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair vitreous china ware wash hand basin white, flat back, size 550 x 400 mm size (flat back or angle back type) including cutting for and pinning ends of brackets or erecting stand complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair 32 mm dia, waste fittings, brass chromium plated for glazed ware sinks, wash basins etc., with long screwed shanks and fly nuts, flange end bedded in red lead cement and other end fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair pillar tap 15 mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 32mm dia LDPE PVC waste pipe of pressure rating 6 kgf/cm2 fixed complete to for WHB includding socket & screw complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair PVC connection 15 mm size with PTMT nuts of length 450mm complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking up or down 15mm bore steel tubing and connections, including cleaning for refixing or removal to store complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supplying and laying of GI tubing dia 15mm medium grade fittings on walls / ceilings or Laying in floors complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Re-fixing old steel tubing and connection in new or old position (Wall, ceiling, floors etc) of 15mm bore complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking out of existing PVC cistern and refixing after tiling work with new flushing pipe of suitable length, and PVC connection of suitable length complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking out of existing WHB & pillar tap and refixing after tiling work with new bracket complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for applying one coat of distemper oil emulsion white or tinted on old decorated surfaces of wall including preparation of surface complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for complete removal of existing treatment, preparing old surfaces and apply one coat of alkali-resistant priming paint and two coats of distemper oil emulsion white or tinted over and incl 1mm thick wall care putty on walls complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for cleaning of wooden surface to retrived one coat of synthetic enamel paint, complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for cleaning of steel surface with wire brush/gunny bag to retrived one coat of synthetic enamel paint, complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing in repairs anodised aluminium sheeting of 22 gauge thick fixed as in crumple section complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Taking down CI soil/waste/vent/rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI soil/waste/vent pipe in any length with ears 100 mm bore (sand cast) in any length with cement joints fixed to walls with clamp complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI bends (any radius) for soil/waste pipes 100 mm bore diminishing pieces or tapers on walls complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI branch pieces single 'Y', 'T' (equal or unequal) ordinary or inverted (spigot or socket type) with parallel branches for 100mm bore pipe with ovel access door complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI soil/waste/vent pipe in any length with ears 75mm bore (sand cast) in any length with cement joints fixed to walls with clamp complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI bends (any radius) for soil/waste pipes 75mm bore diminishing pieces or tapers on walls complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI branch piececs single 'Y'.'T' (equal or unequal) ordinary or inverted (spigot or socked type) with parallel branches for 75mm bore pipe with ovel access door complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing 100mm Cast iron vent cowls with cement joints with pipe complete all as specified and directed by Engr-in-Charge. Note :- Work to be carried out up to 8th floor.
Taking down PVC rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing PVC (SWR) pipes 160mm bore single socketed in any length with rubber ring joints fixed to wall with clamps complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing PVC (SWR) bends (any radius) for rain water pipes 160 mm bore diminishing pieces or tapers on walls complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Brushing neat cement slurry with 3.0kg of cement per sq. metre complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including bedding layer of mortar 15mm thick in CM 1:6 for laying floor finishes complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm as in skirting etc set and jointed in neat cement slurry and pointed in white or coloured cement to match with colour of tiles over and incliding 10mm thick CM (1:4) as in backing coat complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Dismantling of stone slabs, bedded and pointed in any mortar of any description or thickness in floors, approns etc. including removal of debries out of defence land complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour machine cut cudappah stone 20-25 mm thick over base, laid and jonted with grey cement slurry mixed with pigment to match the shade of the stone including rubbing, polishing and necessary hole for gas pipe complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour machine cut granite (of any type) slab 18 to 20mm thick as in like kitchen plateform etc, bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of granite stone over 10 mm thick in CM 1:6 including grinding, polishing and making necessary hole for gas pipe complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Taking down chowkats with shutter (without taking off shutter from the frame) not exc 1.5 sqm each complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing factory made solid panel PVC door shutter 30 mm thick (style) consisting of frame made out of M.S. frame shall be covered with heat moulded plain colour PVC 'C' channel having a PVC sheet strip of 2mm width stuck inside with solvent cement for stiles and plain colour PVC sheets for top rail, lock rail & bottom rail on either side & as gap insert for top rail & bottom rail on either side & as gap insert for top rail & bottom rail; panelling of fplain colour PVC sheet to be fitted in the M.S. frame welded/sealed to the stiles. & rails with suitable PVC sheet beading, and joined together with sovent cement, suppling & fixing in the frame at site complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing solid PVC door frame of size 50mm x 47mm made out of 5mm plain colour PVC sheet reinforced with M.S. Square tube, suppling & fixing in opening complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 100 mm size stainless steel butt hinges medium weight (ISI Marked) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing extruded aluminium alloy handles 150mm size, fabricated type, anodised complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing Aluminium, anodised, barrel tower bolts 150mm size of extruded section and fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair for ISI marked 15mm bore stop valves /angle valve, fancy type, cast copper alloy, chromium plated screwed both ends for iron pipe or for unions and fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 40mm dia high density polyethylene pipes (HDPE) of pressure rating 6 kgf/sqcm of fixed to wall, floors for drain out the waste water from Kitchen Sink, WHB etc complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Removing demolished material exc 5 Km but n.exc 15 Km and depositing where directed by Engr-in-Charge. Note: Work shall be carried out upto G+14 storey building. Rate including scaffolding and safety net cloth at places.
satguruenterprises
Shetty Construction Co
BOB ENTERPRISES
SATYANARAYAN CONSTRUCTION
ASHOK CONSTRUCTION
SHREE JAGDISH FURNITURE CO.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .