Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 Cr+₹4.8 L (4.75%)Rejected-Finance | ₹1.0 Cr+₹4.8 L (4.75%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹1.4 Cr+₹38.0 L (37.9%)Rejected-Finance | ₹1.4 Cr+₹38.0 L (37.9%) | L3 | Rejected-Finance Not L1 |
Tender Value
Refer Docs
EMD Value
₹3.8 L
Closing Date
29 Nov 2021, 12:00 pmClosed
CGM D UAR
Bijulee Bhawan, Paltan Bazar, Ghy 1
Capacity enhancement of Mornoi 33/11kV S/S and upgradation of power transformer from 1x5 MVA to 1x5 MVA plus 1x10 MVA with a new 9 unit control panel including Civil Works under Bongaigaon Electrical Circle under the Safety Scheme of APDCL
2021_APDCL_23433_1
CGM_D/APDCL/LAR/33/11 KV Mornoi Sub Station/202
Open Tender
Electrical Works
Turn-key
180 days
Bongaigaon
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,700
₹3.8 L
Bijulee Bhawan, Paltan Bazar, Ghy 1
1 Mar 2022
17 Nov 2021
30 Nov 2021
17 Nov 2021
29 Nov 2021
22 Nov 2021
18 Nov 2021
Capacity Enhancement of 33/11kV Mornoi Sub-Station from 1x5 MVA to 1x5 +1x10 MVA under Goalpara Electrical Sub-Division of APDCL, LAR, Goalpara. (refer Annexure-1) Itemwise price should be filled in strictly as per the detailed Bill of Quantities at respective referred Annexur.
M/S U.K. ENTERPRISE
POWER NETWORK ENGINEERS PRIVATE LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
PDF • 1.19 MB
tech_eval.pdf
PDF • 1.07 MB
fin_bid_open.pdf
PDF • 1.11 MB
boq_comp_chart.xlsx
xlsx • 0.01 MB
fin_eval.pdf
PDF • 1.11 MB
aoc.pdf
PDF • 6.25 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .