Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 LAccepted-AOC | ₹21.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.0 L+₹1,050.20 (0.05%)Rejected-Finance NEW COLONY BILPUR FATEHGANJ EAST BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | ₹21.0 L+₹1,050.20 (0.05%) | L2 | Rejected-Finance L2 |
Tender Value
₹21 L
EMD Value
₹42,000
Closing Date
12 Jun 2026, 12:00 pmClosed
EE
VIKAS BHAWAN VARANASI
Rajghat ward stith sewai mandi naya mahadev bhaisasur kshetra ke antargat samast galiyo ka nirman karya
2026_REDUP_1147360_9
53 DATE 04-04-2026
Open Tender
Civil Works
Percentage
90 days
EE RED VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹42,000
Yes
12 Aug 2026
12 May 2026
12 Jun 2026
12 May 2026
12 Jun 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismaintling of exist stone chouka Including all complete. | 0.4 | cum | - | - |
| 2 | Disposal of old chouka | 0.4 | cum | - | - |
| 3 | Earthwork in cutting and cartage up to 8 km with all complite (Rate teander) | 0.4 | cum | - | - |
| 4 | Dispoasl of unsevecable material | 0.4 | cum | - | - |
| 5 | cement Conctrete with 2cm gauge approved stone ballast approved coarse sand and cement in the proportion of 4:2:1 including supply of all material and tool and plant etc required for proper completion for the work (pwd sor 2020 279b) | 0.4 | Sqm | - | - |
| 6 | providing and laying 65 mm thick rubbed stone over 20mm (avrage) thick base of cement mortar 1:5 (1 cement: 5coarse sand) with joints 3mm thick side buttered with cement mortar 1:2 (1 cement : Stone dust) admixed with pigment to match the shade of stone and pointing with same mortar. Over Base concrete 1:2:4 (Exucluding cost of base conctrete). As per SI no. NS | 0.2 | Sqm | - | - |
| 7M-150 brick work in 1:4 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No-305 | |||||
| 8 | 12 mm thick cement plasterin 1:4 cement morter I/C all material labour T&P proper complition to the work . S.I. No-586 | 1 | Sqm | - | - |
| 9 | S/P of precosted C.C. block K.C. drain of app. Design and mix over 3" thick 1:6:12 base concrte with B/B,F /Sand & cement and E/W etc. All Complete . | - | Rm | 1 | - |
| 10Finising of wall with two coat plastic Emulsion paint of frist quality approved brand and manufacture on undecorated wall surface to give and even shade including throughly brushing the surface free frome morter dropping and other forgen matter and sand prepered smooth . I/C supply of all material labour T&P etc. required for proper complition to the work . S.I. No-N.B.O.18.57 ch.15 | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_2146501.xls
BOQ • 0.28 MB
sbd.pdf
Tender Documents • 1.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .