| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹7.4 L (6.48%)Rejected-AOC 17E COLLECTOR OFFICE ROAD VENKATHESAPURAM SUNDAR NAGAR EXTENSION NEAR DIC PERAMBALUR 621 212 | PERAMBALUR | TAMIL NADU | 621212 | ₹1.2 Cr+₹7.4 L (6.48%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.1 Cr
EMD Value
₹1.2 L
Closing Date
24 Aug 2023, 3:00 pmClosed
Project Director
DRDA Perambalur
Strengthening and 5 years Maintenance of the Road from Siruvachur Sathanur road to Kurumbapalayam Road KM 0/0-2/990 under MGSMT 25 percent 2022-2023 and 2023-2024 in Alathur Block of Perambalur District Package No.TN11-17
2023_RDTN_357369_1
DIPR/4358/Tender/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA Perambalur
As per Tender Document
3 documents required · 3 mandatory
₹0
₹1.2 L
DRDA Perambalur
25 Sept 2023
10 Aug 2023
24 Aug 2023
10 Aug 2023
24 Aug 2023
17 Aug 2023
17 Aug 2023
Amount
Clearing the Grubbing Road Land Clearing and grubbng road land including uprooting wild vegetation,grass,bushes,shrubs,saplings and trees of girth upto 300mm,removal of stumps of such trees cut earlier and disposal of unserviceable materials and staching of serviceable material KM 0/000 - 2/990
Scarifying/Picking Existing Bituminous/Metalled Surface to a Depth of 5 cm to 10 cm Scarifying/Picking the existing bituminous/Metalled surface to a depth of 5cm to 10cm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 KM 0/000 - 2/990
Excavation in soil Using Hydraulic Excavator and Tippers with disposal upto 1000m Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross- sections, and transporting to the em KM 0/000 - 1/000
Filling Using Carted Earth Construction of subgrade and earthen shoulers with approved material obtained from borrow pits with lifts and leads, transporting to site,spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as KM 0/000- 1/000.
Shoulder Filling Using Gravel Collection and supply of Gravel from approved quarry an average lead 1km mixed with existing earth including cost and conveyance of all materials to site and labour charges etc., the Standard specification.KM 0/000- 1/000.
WET MIX MACADAM Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including pemixing the material with water at OMC in machainical mix plant carriage of mixed material by tipper to site layi8ng in uniform layers 250. KM 0/000- 1/000.
Providing and laying PRIME COAT using slow setting emulsion bitumen Grade I at the rate of 7kg/10sqm over the WMM surface preparatory to another bituminous construction over it.KM 0/000- 1/000.
Providing and laying TACK COAT over WMM surface (treated with primer) using 2.5kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc.,KM 0/000 - 1/000
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/000 - 1/000
Provision for Name Board Cum Citizen Board
Providing and fixing of cautionary, mandatory and informatory sign board Providing and fixing of Retro Reflectorised Cautionary, Manatory Signs with Definition Plate made out of hig intensity Grade Prismatic sheeting conforming to IRC-67:2010 & ASTM D 4956-09, Type IV Specificationand fixed over 1.5mm thick Aluminium sheet Provision for 60cm Equilateral triangle Sign Board
Provision for 60cm Equilateral Mandatory Sign Board
Chevron signs 90cm
Reflector
Road Marking with Hot Applied thermoplastic compound with reflectorising Glass beeds on bituminous surface providing and laying of hot applied thermoplastic compound 2.5mm thick including reflecctorising Glass beeds at 250gms per sqm area ,thickness of 2.50mm is exclusive of surface applied glass beeds as per IRC 35 . The finished surface to level uniform and free from streeks and holes extra complete as per MORTH specification no 803.KM 0/000 - 2/990
Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (ii) Ordinary Kilometer Stone (Precast)
200m stone (precast)
Guard Stone (Precast)
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
TCB CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .