| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-Finance | L1 | Accepted-Finance LOWEST RATE | |
| 2 | L2₹17.1 L+₹1,542.39 (0.09%)Rejected-Finance | L2 | Rejected-Finance HIGHER RATE | |
| 3 | L3₹17.1 L+₹2,399.27 (0.14%)Rejected-Finance | L3 | Rejected-Finance HIGHER RATE |
Tender Value
₹17.1 L
EMD Value
₹34,300
Closing Date
19 Sept 2026, 1:00 pmClosed
BDO JANSATH MUZAFFARNAGAR
JANSATH MUZAFFARNAGAR
GRAM GARHI JANSATH ME JANSATH KHALWADA MARG PER KALI SADAK SE PRACHIN SHIV MANDIR KI AUR CC SADAK NIRMAN KARYA
2026_RDUP_1183749_1
1155/VIDHYANK NIDHI/2026-27
Open Tender
Civil Works
Percentage
90 days
BDO OFFICE JANSATH MUZAFFARNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
BDO JANSATH MUZAFFARNAGAR
₹34,300
26 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 51.2 | cum | 183 | ₹9,369.6 |
| 2 | Providing concrete 1:3:6 for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 25.6 | cum | 6,037 | ₹1,54,547.2 |
| 3 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 | 58.88 | cum | 5,936 | ₹3,49,511.68 |
| 4 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | 224 | sqm | 183 | ₹40,992 |
| 5 | Providing concrete for plain/reinforced concrete M-20 1;2;4 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 3.68 | cum | 6,389 | ₹23,511.52 |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 79.2 | cum | 2,201 | ₹1,74,319.2 |
| 7 | Laying of C.C. Road in 1:1.5:3 ratio of 43 grade cement, c/s & coarse aggregate not exceeding 25mm and including cost of 125 micron thick polythene film. As SI-New item 9(1) | 144 | cum | 7,292 | ₹10,50,048 |
| 8 | S/F sign board i/c all comp. at site. | 1 | Job | 1,662 | ₹1,662 |
| 9 | Deduction 5% as per letter no. 273 dated 03.03.2025 | 1 | Job | 90,198.06 | ₹90,198.06 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.92 MB
BOQ_2226457.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .