| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC Winner in the transparent lottery system for award of contract. |
| 2 | L1₹4.8 LRejected-Finance | ₹4.8 L | L1 | Rejected-Finance Not won in the transparent lottery system |
| 3 | L1₹4.8 LRejected-Finance | ₹4.8 L | L1 | Rejected-Finance Not won in the transparent lottery system |
| 4 | L1₹4.8 LRejected-Finance | ₹4.8 L | L1 | Rejected-Finance Not won in the transparent lottery system |
| 5 | L1₹4.8 LRejected-Finance ODISHA OD | ₹4.8 L | L1 | Rejected-Finance Not won in the transparent lottery system |
Tender Value
Refer Docs
EMD Value
₹4,800
Closing Date
3 Jun 2026, 5:00 pmClosed
S.E, Angul Irr. Divn. Angul
O.O the S.E, Angul Irr. Divn. Angul, At/P.O- Hakimpada, Dist-Angul
Improvement to Right Main Canal from RD 4675m to 4700m of Sapua Badjore Irrigation Project Working RD from 4675m to 4703m
2026_CEBBS_129635_7
SE-AID-3/2026-27
Open Tender
Civil Works - Canal
60 days
Angul
3 documents required · 3 mandatory
₹2,000
₹4,800
Yes
9 Jul 2026
25 May 2026
4 Jun 2026
25 May 2026
3 Jun 2026
25 May 2026
25 May 2026 - 30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kinds of soil including dressing & levelling the foundation bed including shoring, shuttering & dewatering if required and laying the excavated earth in layers not exceeding 0.30m depth in the specified filling sections, rough dressing and breaking clods to maximum 5 cm to 7 cm and disposing the excess earth away from worksite including cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per drawing, specification and direction of the Engineer-in-charge. | 90.99 | One Cum | 282.9 | ₹25,741.07 |
| - | Filling foundation and plinth with clean coarse sand, well watered and rammed including cost, conveyance, royalty, taxes of all materials, hire and running charges of machineries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 16.68 | One Cum | 1,120.1 | ₹18,683.27 |
| 3 | Providing and laying CC of M-15 grade using 20 mm down graded size hard granite crusher broken chips of approved quality, colour and texture free from weathered & skinned and sharp sand of approved quality from approved quarry, mixing, hoisting, lowering and laying in position, compacting and curing for specified days including cost, conveyance, royalty, taxes of all materials, hire and running charges of machineries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 66 | One Cum | 5,880.2 | ₹3,88,093.2 |
| 4 | Rigid smooth centering & shuttering for plain C.C / R.C.C. works in walls including false works and dismantling the same after specified days of casting including cost, conveyance, taxes of all materials, cost of all labour, T&P with all cost of incidental charges, and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 162.64 | One Sqm | 251.1 | ₹40,838.9 |
| 5 | Providing weep holes in Brick masonry /Plain / Reinforced concrete abutment, wing wall / return wall using 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce at regular interval including cost, conveyance, taxes of all materials and cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 9 | One RM | 111.5 | ₹1,003.5 |
| 6 | Filling foundation and plinth with excavated materials laying in layers not exceeding 0.30M in depth including well watered and rammed including cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 33.52 | One Cum | 157.2 | ₹5,269.34 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_592261.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.62 MB
7BidDocument.pdf
Tender Documents • 4.21 MB
BOQ_592261.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid