Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹59.6 LAccepted-AOC HANSI HISAR HARYANA | HANSI | HISAR | HARYANA | 1 | Accepted-AOC ok | |
| 2 | 2₹69.7 L+₹10.1 L (16.9%)Rejected-Finance NEAR GOVT GIRLS SCHOOL VILLAGE DINOD TEHSIL AND DISTRICT BHIWANI 127111 | BHIWANI | BHIWANI | HARYANA | 127111 | 2 | Rejected-Finance OK |
Tender Value
₹52.3 L
EMD Value
₹1.0 L
Closing Date
29 Apr 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Sampla W/S Division, Rohtak
Repair/remodeling of water course of outlet RD 20200-R of Jhajjar Sub Branch (excluding charges)
2022_HRY_217985_9
3449-74/12-A
Open Tender
Civil Works
Item-rate/Agreement basic
180 days
Rohtak
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹1.0 L
Yes
6 Oct 2023
22 Apr 2022
29 Apr 2022
22 Apr 2022
29 Apr 2022
22 Apr 2022
120 days
Amount
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar (HSR Item No. 5.7.4)
Dressing bed and preparation of sub grade for lining by mechanical/ mannual means (HSR Item No. 14.1)
Laying of polythene 100 micron in bed (As per CADA) (N.S.I)
Laying 7.62 C.M thick brick masonry in C.M 1:5 in bed (HSR Item No. 15.6.4)
Laying 22.86 CM thick brick masonry in C.M 1:5 for sides Nakkas, Culvert and Hodies (HSR Item No. 15.6.4)
Laying fillet gola & cement plaster in CM 1:4, 10 mm thick on nakka and culvert (HSR Item No. 11.5.3)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1 :4: 8 ( 1 Cement : 4 coarse sand (zone-Ill) : 8 graded stone aggregate 40 mm nominal size) (HSR Item No. 6.1.6)
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m in all kind of soil as directed by Engineer-in-charge .(HSR Item No. 4.12.1)
Extra for brick work in arches including cost of shuttering upto 1.5 mtr. Span
Brick Masonry Work in Cement Mortar 1 :4 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications MORT&H clause 1300 Cement Mortar1 :4 (1 cement :4 sand) (HSR Item No. 15.6.3)
Supply of polythene 100 micron (N.S.Item)
Supply of R.C.C Lid Size 30" dia (N.S.Item)
Supply of R.C.C Pannels (N.S.Item) size 36"x36"
Fixing of R.C.C Pannels and lids (N.S.Item)
Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in renches, plinth, sides of foundation etc. complete. (HSR Item No. 4.33)
Credit of brick bats
AVTAR SINGH CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .