Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 10 15 5A BIJAYGARH KOLKATA 700092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 119 RABINDRA PALLY KOLKATA 700084 | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 1ST AVENUE PO PANSHTLA 700112 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700112 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical WEST BENGAL WB | HOWRAH | WEST BENGAL | 711101 | Admitted-Fee/PreQual/Technical |
Tender Value
₹3.3 L
EMD Value
₹6,700
Closing Date
25 Aug 2026, 5:00 pmClosed
KMC/EE/WS/BR-XI/JU
Baghajatin Market Complex Unit-III,Baghajatin Station Road, Kolkata-700086
DEVELOPMENT OF W/S NETWORKS BY LAYING OF 150MM DIA. D.I PIPE AT PEYARA BAGAN NEAR H/O-KALIKA BASTALAYA TO PEYARA BAGAN CLUB IN WD NO-114, BR-XI.
2026_KMC_1037099_1
EE(WS)/BR-XI/NIeT/49/2026-27
Open Tender
CIVIL WORKS
Percentage
28 days
BAGHAJATIN
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,700
29 Aug 2026
8 Aug 2026
29 Aug 2026
11 Aug 2026
25 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.11 Hire and labour charges for coloured and twisted cloth rope fencing as per design approved by Engineer-in-charge one line with 100 mm dia Eucalyptus or bamboo posts 0.60 m above G.L and 300 mm below G.L 1.50 m apart fitted and fixed complete including painting with white zinc painting (2 coat) complete.Payment of painting to be made seperately. | 304 | METER | 20 | ₹6,080 |
| 2 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.14 Signalling arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | 15 | Daily | 202 | ₹3,030 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.12 Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made separately. (i) 600 mm. x 450 mm. size of board. | 1 | EACH | 427 | ₹427 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 35.9 | CUBIC METER | 636 | ₹22,834.94 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 129.12 | CUBIC METER PERCENT | 119.27 | ₹15,400.14 |
| 6 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 125 carriage....carriage....diameter in mm 150 upto 5km | 240 | METER% | 4.35 | ₹1,044 |
| 7 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 125 carriage....carriage....diameter in mm 150 per km beyond 5km to 10km | 1,200 | METER% | 0.32 | ₹384 |
| 8 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 125 carriage....carriage....diameter in mm 150 per km beyond 10km to 20km | 2,400 | METER% | 0.26 | ₹624 |
| 9 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.2 Lowering any type of Ductile Iron (DI) pipes & specials and laying along trench at any depth as per speclfication and direction of the Engineer-incharge, ( laying over ground. the rates shall be, reduced by 10% and the rates so reduced shall be inclusive of cost of all sorts of holding arrangements]Diameter in mm 150mm dia. | 2.4 | METER% | 1,878 | ₹4,507.2 |
| 10 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.3 All types of Ductile Iron (D.I) Specials (viz. Bend. Tee. Taper. Tail piece etc), size conforming to I.S. Specification No. 9523/2000 with cement mortar lining (inside) and bituminous coating (outside). (25% of payment will be held up till successful hydraulic testing) b) Doubled Socketed Bend 100 mm to 300mm dia | 136 | KILOGRAM | 125 | ₹17,000 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
TBID.pdf
Tender Documents • 1.44 MB
BOQ_2547443.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .