Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | ₹5.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.6 L+₹1,820 (0.32%)Rejected-Finance | ₹5.6 L+₹1,820 (0.32%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | C REVATHI L1 | R V CONSTRUCTIONS AND INFRA DEVELOPERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with an initial of 10m and initial lift of 2m including bailing out water with kifts indicated below including guarding and lighting in trenches for laying of pipes in hard stiff clay stiff black cotton, hard red earth shales, muram gravel, stony earth, and earth mixed with small boulders and hard gravel soil(ordinary soil) etc., SS-20B all complete as per standard specification and as directed by the Department Officers.(sor p.no.296) | 610 | Rm | 193 ₹1,17,730 Lowest | 195 ₹1,18,950 |
| 2.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.HDPE Pipe 90mm | 150 | Rm | 336 ₹50,400 Lowest | 340 ₹51,000 |
| 2.01 | HDPE Pipe 110mm | 460 | Rm | 570 ₹2,62,200 Lowest | 570 ₹2,62,200 Lowest |
| 3.00 | Supply and Delivery of HDPE and PVC specials of conforming to IS Specification at site of work including all taxes loading transportation unloading insurance etc.., Complete and as directed by department officers 90 mm Sluice valve | 1 | Nos | 5,000 ₹5,000 Lowest | 5,000 ₹5,000 Lowest |
| 3.01 | 90 mm HDPE Bend | 4 | Nos | 243 ₹972 Lowest | 243 ₹972 Lowest |
| 3.02 | 90 mm Stupbend | 2 | Nos | 1,200 ₹2,400 Lowest | 1,200 ₹2,400 Lowest |
| 3.03 | 90 mm Flange set | 2 | Nos | 1,100 ₹2,200 Lowest | 1,100 ₹2,200 Lowest |
| 3.04 | 90 mm HDPE Equal Tee | 4 | Nos | 335 ₹1,340 Lowest | 335 ₹1,340 Lowest |
| 3.05 | 110 mm Sluice valve | 2 | Nos | 6,900 ₹13,800 Lowest | 6,900 ₹13,800 Lowest |
| 3.06 | 110 mm HDPE Bend | 8 | Nos | 445 ₹3,560 Lowest | 445 ₹3,560 Lowest |
Tender Value
₹6.8 L
EMD Value
₹6,750
Closing Date
22 Apr 2025, 3:00 pmClosed
Commissioner
The Commissioner, Hosur City Municipal Corporation
Providing 110mm , 90mm HDPE pipe line works at Ward No. 34, Thally Road OHT to Thally Hudco Cross Streets in Hosur City Municipal Corporation
2025_MAWS_542498_8
000026/2025/E2/HOSUR CITY MUNICIPAL CORPORATION
Open Tender
Civil Works - Water Works
Works
60 days
Hosur City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,750
29 Apr 2026
9 Apr 2025
22 Apr 2025
9 Apr 2025
22 Apr 2025
9 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_646582.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.24 MB
Tendernotice_2.pdf
PDF • 0.97 MB
BOQ_646582.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .