| Sl No | Description | Qty | Unit | HAKIM MOMIN L2 | SATELLITE CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Details | |||||
| 2.00 | (i) L031- REO Road Dangatuk More To Dangatuk Pahar Setting out pillars providing and fixing of Benchpillars@ four nos. Per kmas per drawing given. ( size 1.00 x 0.345 x 0.345) | 1.9 | cum | 4,043.99 ₹7,683.58 Lowest | 4,043.99 ₹7,683.58 Lowest |
| 3.00 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification . | 1.14 | cum | 57,699.09 ₹65,776.96 Lowest | 57,699.09 ₹65,776.96 Lowest |
| 4.00 | Dismantling of Cement Concrete Pavements as per Technical Specification clause 202. by mechanical means usingpneumatic tools breaking of pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000m, stacking serviceable and unserviceable materials separately. | 195 | cum | 1,043.23 ₹2,03,429.85 Lowest | 1,043.23 ₹2,03,429.85 Lowest |
| 5.00 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 1,425 | cum | 19.1 ₹27,217.5 Lowest | 19.1 ₹27,217.5 Lowest |
| 6.00 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 3,087.5 | cum | 143.67 ₹4,43,581.13 Lowest | 143.67 ₹4,43,581.13 Lowest |
| 7.00 | Construction of embankment with material obtained from Road way cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5 | 2,161.25 | cum | 43.32 ₹93,625.35 Lowest | 43.32 ₹93,625.35 Lowest |
| 8.00 | Construction of Embankment with Material Obtained from Borrow Pits With approved material obtained from borrow pits with a lift up to 1.5m, transporting to site , spreding, grading to required slope and compacted to meet requirement of table 300.1 and 300.2 as per technical specification clause with a Free lead | 754.37 | cum | 97.11 ₹73,256.87 Lowest | 97.11 ₹73,256.87 Lowest |
| 9.00 | Construction of Embankment with Material Obtained from Borrow Pit With approved material obtained from borrow pits with a lift up to 1.5m, transporting to site , spreding, grading to required slope and compacted to meet requirement of table 300.1 and 300.2 as per technical specification clause with a lead upto 250m. | 251.46 | cum | 143.06 ₹35,973.87 Lowest | 143.06 ₹35,973.87 Lowest |
| 10.00 | Construction of Subgrade Construction of subgrade and earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification 301.4.1 Free Lead | 3,258 | cum | 98.43 ₹3,20,684.94 Lowest | 98.43 ₹3,20,684.94 Lowest |
Tender Value
₹10.5 Cr
EMD Value
₹22 L
Closing Date
10 Jun 2026, 5:00 pmClosed
ENGINEER IN CHIEF
3rd Floor, FFP Building, Dhurwa, Ranchi, JHarkhand 834002
Construction and Maintenance of Roads and LSBs
2026_CEJHR_147673_23
NIT-09_PMJANMAN-ROAD
Open Tender
Civil - Roads and Bridges
Item Rate
455 days
SAHIBGANJ
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
₹22 L
24 Aug 2026
19 May 2026
10 Jun 2026
19 May 2026
10 Jun 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Details | - | - | - | - |
| 2 | (i) L031- REO Road Dangatuk More To Dangatuk Pahar Setting out pillars providing and fixing of Benchpillars@ four nos. Per kmas per drawing given. ( size 1.00 x 0.345 x 0.345) | - | cum | 4,043.99 | - |
| 3 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification . | 1 | cum | 57,699.09 | ₹57,641.39 |
| 4 | Dismantling of Cement Concrete Pavements as per Technical Specification clause 202. by mechanical means usingpneumatic tools breaking of pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000m, stacking serviceable and unserviceable materials separately. | - | cum | 1,043.23 | - |
| 5 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | - | cum | 19.1 | - |
| 6 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | - | cum | 143.67 | - |
| 7 | Construction of embankment with material obtained from Road way cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5 | - | cum | 43.32 | - |
| 8 | Construction of Embankment with Material Obtained from Borrow Pits With approved material obtained from borrow pits with a lift up to 1.5m, transporting to site , spreding, grading to required slope and compacted to meet requirement of table 300.1 and 300.2 as per technical specification clause with a Free lead | - | cum | 97.11 | - |
| 9 | Construction of Embankment with Material Obtained from Borrow Pit With approved material obtained from borrow pits with a lift up to 1.5m, transporting to site , spreding, grading to required slope and compacted to meet requirement of table 300.1 and 300.2 as per technical specification clause with a lead upto 250m. | - | cum | 143.06 | - |
| 10 | Construction of Subgrade Construction of subgrade and earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification 301.4.1 Free Lead | - | cum | 98.43 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.10 MB
JH-19-PMJANMAN-II-SBJ-06-2025-26.pdf
Tender Documents • 12.70 MB
BOQ_230492.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].