Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹7.7 L+₹3,350 (0.44%)Rejected-Finance 34 1 12 2F SAINIK VIHAR DEORI ROAD AGRA UP 282007 | AGRA | UTTAR PRADESH | 282007 | L2 | Rejected-Finance BEING OTHER THAN L1 | |
| 3 | L3₹8.0 L+₹33,500 (4.39%)Rejected-Finance | L3 | Rejected-Finance BEING OTHER THAN L1 | |
| 4 | L4₹8.9 L+₹1.3 L (17.1%)Rejected-Finance | L4 | Rejected-Finance BEING OTHER THAN L1 | |
| 5 | L5₹9.9 L+₹2.3 L (30.3%)Rejected-Finance | L5 | Rejected-Finance BEING OTHER THAN L1 |
Tender Value
₹13.9 L
EMD Value
₹27,840
Closing Date
12 Jul 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE EAST AGRA
GE East Agra, Military Engineer Services, Gwalior House, 62 Taj Road Agra Cantt 282001
OUTSOURCING OF M O OF AATS COMPLEX NEAR KHERIA AND CONNECTED SERVICES UNDER GE E AGRA
2021_MES_436352_2
9348/E8
Open Tender
Civil Works
Item Rate
335 days
AGRA
AS PER TENDER DOCUMENTS
9 documents required · 9 mandatory
₹500
GE EAST AGRA
₹27,840
Yes
24 Jul 2021
29 Jun 2021
16 Jul 2021
29 Jun 2021
12 Jul 2021
29 Jun 2021
60 days
Amount
Note: Please refer schedule 'A' notes given on serial page No. 13 to 15 before quoting the tender.
M & L for providing staff for operation of 11 KV take over points including periodical and routine maint and attending day to day complaint/ breakdown complaints pertaining to HT/LT OH and street light UG feeder feeding power supply to various pockets of AATS and para holding under GE (E) Agra as received in complaint cell at AATS complaint cell inclusive of provn of protective/safety devices, maintaining the complaint record of complaint slip and register for all working days including sunday and holiday for two shift of 08 hrs (from 0800 hrs to 1600 hrs and 1600 hrs to 2400 hrs) per day all as specified and directed by the Engr-in-chage. The staff details for each shift of 8 hours are as under:- (a) Electrician -- 01 Nos in each shift
M & L for providing staff for operation of pump houses at AATS and para holding comprising of all equipment/plant installed at pump houset, maint of pumping lines pertaining to water supply raising mains/distribution lines and operation of valves in pit chambers in various pockets of AATS including sunday and holiday for one shift of 08 hrs per day all as specified and directed by the Engr-in-chage. The staff details for one shift of 8 hours are as under:-
Trades Man -01 No in each shift
Notes for item No 2.00 to 4.00:- (i) Carefully monitoring of 11 KV take over point of TOP , all the GODOs in the 11 KVA yard. (ii) To switch On/OFF the security lights at MRS complex as per time Schedule fixed by Engineer-in-Charge. (iii) In case of any major fault in the equipments which is beyond the control of the operator, he will immediately intimate the same to the Engineer-in-Charge/JE. (vi) The operator shall monitor and Maintain records of load/power factor complaint etc in detail and submit complete details to Engineer-in-Charge/JEs for resolution, urgent complaints if any will immediately be intimated to Engineer-in-Charge/JEs (v) The contractor shall arrage 3 mobile set with CUG facility for intercommunication with all above 3 teams, bill of these mobile shall be bear by contractor. (vi) The department can deploy above staff to other location, with department DEL under GE (E) Agra as per site requirement but number of staff shall not be less than specified in Item No 1, 2 above. (vii) Electrcian should have minimum 3 year experience in handling of HT/LT electrical switch gear. (viii) All sraff deployed by contractor shall wear half reflective jacket having self glow strip and marking as directed by Engineer in Charge/GE. (ix) Necessary T&P required for day to day requirements of electrician/ helper like plier,screw driver,test lamp, tong tester, plumber tool kit, magger, ladder, hand gloves etc shall be arrange by the Contractor and list of T&P submit to Engineer-in-Charge becore commencement of the work. (x) Cleaning of MRS and surrounding area including vegetation, grass with help of shawls, grass cutter etc. Necessary T&P, safety equipment such as discharge rod,ladder, hand gloves etc shall be provided by the Contractor before deployment of staff.. (xi) DHPP (N) will be issued under Sch 'B' free for filling (Record of consumption will be contrctor responsbility) (xii) Requisite store for day to day complaints shall be collected from User and old material retrived shall be deposted to user. The cost of collection of new store and depositing old material deemed to include in above rate. ( xii ) Recovery from contractor:-a. Recovery Rs 500.00 per day for non production of adequate tools/safety equipement. B. Recovery Rs 1600/- per shift against absentee of /electrician/operators.
M/S OM Enterprises
M/s Yash Trading Company
M/s P.N.C. Engineers
Sanjay Associates
SHOURYA ENGINEERING ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .