| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.8 LAccepted-AOC | 1 | Accepted-AOC Accepted | |
| 2 | 2₹14.0 L+₹21,001 (1.52%)Rejected-Finance | 2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | ARUL LAKSHMI CONSTRUCTION L1 | V & V CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 34 | Cum | 220 ₹7,480 Lowest | 220 ₹7,480 Lowest |
| 2.00 | Supplying and filling in foundation and basement with filling M-sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. DATA | 8 | Cum | 1,889 ₹15,112 Lowest | 1,889 ₹15,112 Lowest |
| 3.00 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 25 | Cum | 270 ₹6,750 Lowest | 270 ₹6,750 Lowest |
| 4.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 8 | Cum | 5,700 ₹45,600 Lowest | 5,700 ₹45,600 Lowest |
| 5.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | |||||
| 5.01 | For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc. | 36 | Sqm | 488 ₹17,568 Lowest | 488 ₹17,568 Lowest |
| 5.02 | For rectangular or square RCC columns, etc. | 51 | Sqm | 1,300 ₹66,300 Lowest | 1,300 ₹66,300 Lowest |
| 5.03 | For plane surfaces such as sunshades, top and bottom slab of RCC boxing, etc. | 93 | Sqm | 1,085 ₹1,00,905 Lowest | 1,085 ₹1,00,905 Lowest |
| 6.00M-20 CONCRETE - Providing and laying in position, standarised design mix M-20 Grade using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350Kg/m3 and maximum water cement ratio of 0.55, including admixture(plasticiser/super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.70 cu.m.)940.50Kg of 20mm machine crushed stone jelly and with about (2.80 cu.m.)462.00Kg of 10-12mm machine crushed jelly and with about (4.25 cu.m.)701.25Kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor/roof slabs wherever neccessary without clambing extra, etc. complete complying with standard specification and as directed by the departmental officers. the coarse and fine aggregates to be used should comply with the requierments of IS 383-2016. (No separate payment will be made by the department for the exces usage of materials as per design mix.) (SI No 81) | |||||
| 6.01 | Foundation | 5 | Cum | 8,390 ₹41,950 Lowest | 8,390 ₹41,950 Lowest |
Tender Value
₹16.5 L
EMD Value
₹16,500
Closing Date
8 Oct 2025, 3:00 pmClosed
The Commissioner
Tharamangalam Municipality,Tharamangalam
Construction of Anganwadi Centre at Kilakupavadi, Ward No.20 in Tharamangalam Municipality.
2025_MAWS_607965_1
9732/2024/SS2
Open Tender
Civil Works
Works
Tharamangalam Municipality
Construction of Anganwadi Centre at Kilakupavadi, Ward No.20 in Tharamangalam Municipality.
3 documents required · 3 mandatory
₹0
₹16,500
Yes
Tharamangalam Municipality
23 Oct 2025
23 Sept 2025
8 Oct 2025
23 Sept 2025
8 Oct 2025
23 Sept 2025
30 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .