Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 249 SHALIMAR SHAMLI | SHAMLI | SHAMLI | UTTAR PRADESH | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 100 FOOTA ROAD FCI COLONY BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
9 Oct 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING EINGINEER
S.E., EUDC-II, SECTOR-18, NOIDA
System Augmentation/Strengthening works in Different District
2023_PVVNL_839851_1
E-Tender No. 58/2023-24, EUDC-II, Noida
Open Tender
Electrical Works
Item Rate
90 days
S.E., EUDC-II, SECTOR-18, NOIDA
ATTACHED IN DOC
2 documents required · 2 mandatory
₹3,540
S.E., EUDC-II, NOIDA
₹22,000
16 Oct 2023
18 Sept 2023
9 Oct 2023
18 Sept 2023
9 Oct 2023
18 Sept 2023
Amount
Installation of New Distribution Transformer against overloaded transformers in Inreasing Capacity head under EDD-Gr. Noida (DETAIL OF WORK MENTIONED IN TENDER FORM)
Safe carriage of following stock material, from any of the Store Center of PVVNL to work site including Loading from Store and safe unloading at site for Item No. 3 to 10
NEW 11/0.4 KV 63 KVA T/F
NEW 11/0.4 KV 100 KVA T/F
P.C.C. Pole 8.5 mtr. long
11 KV Pin Insulator with pin
ACSR Weasel
Cable 1 X35 mm XLPE Insulated
ABC Cable 3X95 sq mm
Disc Insulator with fitting
SUPPLY OF FOLLOWING MATERIAL BY THE CONTRACTOR FROM THE PVVNL APPROVED VENDORS AS PER GTP APPROVED.
G.I.Top Channel 125x65x6mm, 3200 mm long (13.10kg/mt) with G.I. clamp of 75x10mm size, bolts, nuts and washers for 11KV line double pole/ Four Pole
Holding Clamps
G.I.Channel 100x50x6x2240mm (9.56kg/mt) with 2 Nos. G.I.Clamp of 65x8mm for Dropper for fuse set & double pole for 11KV line
MS Angle 100x50x6x2028mm (9.56kg/mt) with 2 Nos. G.I.Clamp of 65x8mm for T/F Base Angle
MS Nut Bolt off size and Washers
LT Clamps for Cable
Dead End Clamps
Suspension Clamps
3 Phase Distribution Box (PVVNL GTP Approved)
11KV DO Fuse Set (3 Phase)
Supply and Errection of the Following material for completing the work as per RESPO.
Installation and Commissioning of 11/0.4 KV, 63 KVA T/F on Plinth/Double Pole/as per site requirement and providing & fixing of Lugs & copper L-piece (04 No.) of size 400x50x6mm and making of L.T.Connections with complete work in all respects.
Installation and Commissioning of 11/0.4 KV, 100 KVA T/F on Plinth/Double Pole/as per site requirement and providing & fixing of Lugs & copper L-piece (04 No.) of size 400x50x6mm and making of L.T.Connections with complete work in all respects.
The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 65x8mm, G.I.Nut bolt & washer, P.G.Clamp, Stone Pad, Al. Binding wire, 'E' bracket 75x10mm, and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as any fabrication work if required & fixing of cross bracing sets 4.3mtr long, from G.I.Angle 65x65x6mm. The work includes cutting holes and providing G.I.Bolt of 16x40mm size, in the middle of the cross bracing with 01No. spring washer of proper size as per drawing/ as per schedule. Double Pole Structures (a) PCC Pole - 8.5mtr Long
The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 'F' bracket 75x10mm, G.I.Nut bolt & washer, Stone Pad Al. Binding wire and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as an fabrication work if required. Single Pole (a) 8.5MTR Long PCC POLE
Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per RESPO. Work includes back filling and proper ramming. Single Pole and Double Pole (a) 8.5MTR. PCC POLE
Installation and Fixing of 11 KV Fuse Set: Assembling and installation of fuse set on the fuse set structure of the T/F. The work includes fabrication for proper fixing, if required. Complete work in all respect.
FIXING OF PIN INSULATOR WITH PIN, COMPLETE WORK IN ALL RESPECT.
fixing and Laying of 1x35sqmm XLPE Cable at different locations of T/F as per site requirement.
Laying, Sagging and Re-Sagging of AB Cable 3x95sqmm at different locations of T/F as per site requirement. as per site requirement.
Laying, spreading, lifting and final sagging of 3 phases ACSR Rabbit conductor in accordance with Line chart includidng binding and fixing of all accessories in 03Nos. Conductor in parallel as per site requirement.
FIXING OF DISC INSULATOR WITH FITTING, COMPLETE WORK IN ALL RESPECT.
Fixing of 11 KV Dropper Channel as per site requirement.
Providing and Driving of MS earth rod of size 20x2500 mm in earth and jointing through G.I. wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts for pole earthing. Supply Erection, fixing, grouting of stay rod in cement, sand and brick ballast in ration 1:4:8 in Block 600*600*300 mm with binding & nuzzling including providing & fixing of stay insulator complete in all respect with grouting. (All Work and Material in the scope of Contractor)
FIXING OF 11KV T-CHANNEL AS PER SITE REQUIREMENT.
FIXING OF MS Angle (T/F Base Angle) AS PER SITE REQUIREMENT.
Fixing of Holding Clamps as per site requirement.
Fixing of Nut & Bolt and Washers as per site requirement.
Fixing of LT Clamps as per site requirement.
Fixing of Dead End Clamps as per site requirement.
Fixing of Suspension Clamps as per site requirement.
Installation of 3 Phase Distribution Box at Poles including connected the Connections HT/LT with complete work in all respect.
Kunal Electricals
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .