Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.1 LAdmitted-Finance | ₹22.1 L | L1 | Admitted-Finance |
| 2 | L2₹22.2 LAdmitted-Finance | ₹22.2 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ab builders L1 | mitesh construction L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Footings - First Depth Upto 2.00M | 41 | M3 | 259 ₹10,619 | 260 ₹10,660 |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Plinth Beam | 11 | M3 | 110 ₹1,210 | 115 ₹1,265 |
| 3.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 12 | M3 | 2,428 ₹29,136 | 2,430 ₹29,160 |
| 4.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 12 | M3 | 6,285 ₹75,420 | 6,286 ₹75,432 |
| 5.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Plinth Beam | 40.21 | M2 | 685 ₹27,543.85 | 690 ₹27,744.90 |
| 6.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc. | |||||
| 6.01 | Square Column | 86 | M2 | 623 ₹53,578 | 625 ₹53,750 |
| 7.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at not more than 75cm centre to centre etc. complete complying with the standard specificaiton. - For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc. | 165 | M2 | 937 ₹1.5 L | 938 ₹1.5 L |
| 8.00Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requirements of IS standards. | |||||
| 8.01 | Upto Basement | 11 | M3 | 9,088 ₹99,968 | 9,090 ₹99,990 |
Tender Value
₹27 L
EMD Value
₹27,000
Closing Date
14 Nov 2025, 3:00 pmClosed
COMMISSIONER KUMBAKONAM CITY MUNICIPAL CORPORATION
COMMISSIONER KUMBAKONAM CITY MUNICIPAL CORPORATION
Construction Of 3 Nos Shops and Ward Office at First Floor At Ward No44 Arasalaru Vazhinadapu Anumar Kulam Road In Kumbakonam City Municipal Corporation.
2025_MAWS_620398_1
9649/2025/E2
Open Tender
Civil Works
90 days
kumbakonam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹27,000
4 Mar 2026
6 Nov 2025
14 Nov 2025
6 Nov 2025
14 Nov 2025
6 Nov 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 1.36 MB
BOQ_741879.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid