Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 LAccepted-AOC AT REBATIGUDA PO THERUBALI DIST RAYAGADA PIN 765018 | RAYAGADA | ODISHA | 765018 | ₹17.9 L | L1 | Accepted-AOC Lottery Winner |
| 2 | L1₹17.9 LRejected-Finance AT PO PADMAPUR DIST RAYAGADA | PADMAPUR | RAYAGADA | ODISHA | ₹17.9 L | L1 | Rejected-Finance Unsuccessful Lottery |
| 3 | L1₹17.9 LRejected-Finance BEHERA | NA | NA | 121004 | ₹17.9 L | L1 | Rejected-Finance Unsuccessful Lottery |
| 4 | L1₹17.9 LRejected-Finance AT GOPAL NAGAR MARATHIGUDA PO GUNUPUR DIST RAYAGADA | GUNUPUR | RAYAGADA | ODISHA | ₹17.9 L | L1 | Rejected-Finance Unsuccessful Lottery |
| 5 | L1₹17.9 LRejected-Finance | ₹17.9 L | L1 | Rejected-Finance Unsuccessful Lottery |
Tender Value
₹17.9 L
EMD Value
₹17,943
Closing Date
16 Mar 2026, 5:00 pmClosed
Executive Engineer
RURAL WORKS DIVISION, GUNUPUR
Construction of Conference Hall for Video Conference System at Ramnaguda Tahasil office of Rayagada District for the year 2025-26.
2026_CERWI_127149_1
EERWGNP Online 15 2025 26
Open Tender
Civil Works - Buildings
120 days
Gunupur
2 documents required · 2 mandatory
₹6,000
₹17,943
Yes
1 Jul 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
11 Mar 2026 - 15 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in foundation hard soil including moorum, stoney earth mixed with boulders with all leads and lifts including dressing and levelling the bed and depositing the excavated earth away from the work site with all leads and lifts including cost of all labour and T&P and cess required for the work and etc. complete in all respect and as per the direction by the Engineer-in-Charge. | 78.87 | cum | 276.89 | ₹21,838.31 |
| 2 | Supplying, filling in foundation and plinth with sand in layers well watered and rammed including cost, conveyance, royalty of all the materials required for the work labour with T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-Charge. | 7.86 | cum | 637.73 | ₹5,012.56 |
| 3 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. | 52.58 | cum | 153.83 | ₹8,088.38 |
| 4 | Providing cement concrete (1:3:6) in foundation and plinth using 4cm size clean hard black granite metal of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15cm thick to the required level, ramming watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-Charge | 15.88 | cum | 5,778.45 | ₹91,761.79 |
| 5 | Cement concrete of proportion (1:2:4) using 12mm size hard granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete and compacting in layers not exceeding 15cm thick with proper packing and ramming each layer of concrete by means of vibrator including watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-Charge. (Ground Floor) | 1.37 | cum | 7,429.47 | ₹10,178.37 |
| 6 | Reinforced cement concrete of M20 grade concrete with clean hard crusher broken granite chips of 20mm downgraded size of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing for four weeks, centring, shuttering and finishing the exposed surface and ceiling smooth to receive white washing or painting providing grooves or beads and fan hooks as per requirement in ceiling where necessary, cost of water, including cost, conveyance, royalty taxes of all the materials and labour, T&P and cess etc. complete in all respect but excluding cost of M.S rods or Tor steel and binding wire 18 to 20 gauge and labour charges for straightening, cutting, bending and binding and tying the grills and placing in proper position as per specification and direction of the Engineer-in-charge. Column Base & Footing | 12.47 | cum | 6,295.53 | ₹78,505.26 |
| 7 | Plinth beams | 2.77 | cum | 7,165.9 | ₹19,849.54 |
| 8 | Column / Wall Beam (Super Strucure) | 11.5 | cum | 15,558.42 | ₹1,78,921.83 |
| 9 | Lintels | 1.53 | cum | 13,958.9 | ₹21,357.12 |
| 10 | Chajja | 8.4 | sqm | 1,223.27 | ₹10,275.47 |
stage.html
html • 0.10 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_584747.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_584747.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid