| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹71.4 LAdmitted-Finance | -11.20% | ₹71.4 L | L1 | Admitted-Finance |
| 2 | L2₹77.8 L+₹6.4 L (9.01%)Admitted-Finance | -3.20% | ₹77.8 L+₹6.4 L (9.01%) | L2 | Admitted-Finance |
| 3 | L3₹78.8 L+₹7.4 L (10.4%)Admitted-Finance | -2.00% | ₹78.8 L+₹7.4 L (10.4%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical not qualified |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical not qualified |
Tender Value
₹80.4 L
EMD Value
₹1.6 L
Closing Date
8 Jul 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
C/I JAL SHAKTI DIV UDHAMPUR
Permanent restoration of damaged infrastructure of WSS Dehari WSS Old Pinger WSS Jandrari WSS Incha Ladan WSS Sunetar WSS Blandh WSS Dheeran WSS Thaley and WSS Kaghote under SASCI 2026
2026_PHE_313749_1
e-NIT No. 18 of 2026-27
Open Tender
Civil Works - Others
Percentage
60 days
udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EXECUTIVE ENGINEER
₹1.6 L
21 Jul 2026
26 Jun 2026
9 Jul 2026
27 Jun 2026
8 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 52.8 | Cum | 479.3 | ₹25,307.04 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil : | 104.68 | Cum | 592.9 | ₹62,064.77 |
| 3 | Dismantling G.I. pipes (external work) including excavation and refilling
trenches after taking out the pipes, manually/by mechanical means
including stacking of pipes within 50 meters lead as per direction of
Engineer-in-charge :
15 mm to 40 mm nominal bore. | 2,602 | Mtr | 109.65 | ₹2,85,309.3 |
| 4 | Dismantling G.I. pipes (external work) including excavation and refilling
trenches after taking out the pipes, manually/by mechanical means
including stacking of pipes within 50 meters lead as per direction of
Engineer-in-charge :
Above 40 mm nominal bore. | 1,954 | Mtr | 121.65 | ₹2,37,704.1 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 43.34 | Cum | 7,571.55 | ₹3,28,150.98 |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 43.34 | Cum | 1,455.65 | ₹63,087.87 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 15.38 | Cum | 9,821.85 | ₹1,51,060.05 |
| 8 | Supply of stones | 42.3 | Cum | 700 | ₹29,610 |
| 9 | Dumping of stones in horizontol on level | 42.3 | Cum | 237.9 | ₹10,063.17 |
| 10 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 8.23 | Sqm | 416.5 | ₹3,427.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1015555.xls
BOQ • 0.46 MB
experience.pdf
PDF • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .