Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC CHECHI TOWER BHADDI ROAD BALACHAUR | ₹1.2 Cr | L1 | Accepted-AOC ok |
| 2 | L2₹1.2 Cr+₹2.8 L (2.44%)Rejected-Finance VILLIGE KORTERPUR DHANNI TEH BALACHAUR DISTT SBS NAGAR | ₹1.2 Cr+₹2.8 L (2.44%) | L2 | Rejected-Finance ok |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
1 Oct 2021, 5:00 pmClosed
EE CONST DIVN PWD ROPAR
EE CONST DIVN PWD ROPAR
Speical Repair of Link Roads 2021-22 Phase-IV falling under Construction Sub-Divison, Sri Anandpur Sahib, MC Sri Anandpur Sahib (Group-II)
2021_CEPW_70903_1
32 dated 23.08.2021
Open Tender
Civil Works - Roads
Percentage
180 days
ROPAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
₹2.4 L
26 Oct 2021
28 Aug 2021
4 Oct 2021
28 Aug 2021
1 Oct 2021
28 Aug 2021
eProcurement System Government of Punjab Created By: Vishal Gupta Created Date/Time: 14-Oct-2021 11:01 AM Tender Title: Speical Repair of Link Roads 2021-22 Phase-IV falling under Construction Sub-Divison, Sri Anandpur Sahib, MC Sri Anandpur Sahib (Group-II) Tender ID: 2021_CEPW_70903_1
Tender Inviting Authority: EXECUTIVE ENGINEER CONSTRUCTION DIVISION PWD B AND R RUPNAGAR
Name of Work: Speical Repair of Link Roads 2021-22 Phase-IV falling under Construction Sub-Divison, Sri Anandpur Sahib, MC Sri Anandpur Sahib (1) Khera Kalmot School and shamshanghat Length 1.45 Kms (2) Khanpur Khuhi Bhangal to Spalwan Length 0.54 Kms, (3) Main road to Spalwan Shamshanghat length 0.30 Kms (4) Dhyapur Shamshanghat Length 0.60 Kms (5) Bhanupli to Lower Daroli length length 0.60 Kms (6) Jandla Harijan Basti to Padian di basti Jandla length 0.73 Kms (7) Upper Daroli Bass Bhagtan length 0.66 Kms (8) RGN road to Lower patti length 0.21 Kms (9) Jandla to Padian di Basti length 0.81 Kms, (10) Mehandpur Harijan Basti length 0.47 kms (11) Mandir Shidh Chanan village Rampur Kalan length 0.40 Kms (12) Daulan Basti Plassi length 1.40 Kms (13) Bhanam Shamshanghat length 1.10 Kms (14) Harijan Basti Bhallan length 0.70 Kms (Group-II)
Contract No: Civil Works
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Chechi Construction Co.(GSTN-03AIKPC8432G2ZJ) 11981036.53 -3.36 11578473.70 One Crore Fifteen Lakh Seventy Eight Thousand Four Hundred and Seventy Three
2.00 M/S Sareen and Co.(GSTN-NA) 11981036.53 -1.00 11861226.16 One Crore Eighteen Lakh Sixty One Thousand Two Hundred and Twenty Six
Lowest Amount Quoted BY: Chechi Construction Co.(11578473.70)
BOQ Summary Details Tender Title: Speical Repair of Link Roads 2021-22 Phase-IV falling under Construction Sub-Divison, Sri Anandpur Sahib, MC Sri Anandpur Sahib (Group-II) Tender ID: 2021_CEPW_70903_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Chechi Construction Co. 11578473.70 L1
2 M/S Sareen and Co. 11861226.16 L2
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .