Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC | L1 | Accepted-AOC L-1 | |
| 2 | L2₹22.0 L+₹4.5 L (25.4%)Rejected-Finance H NO 96 COURT ROAD OPP S D M RESIDENCE KASHIPUR DISTT U S NAGAR UTTARAKHAND | L2 | Rejected-Finance Highest Amount | |
| 3 | L3₹27.7 L+₹10.2 L (58.1%)Rejected-Finance CHURK SONEBHADRA U P | SONBHADRA | UTTAR PRADESH | 231206 | L3 | Rejected-Finance Highest Amount | |
| 4 | Not Admitted-Fee/PreQual/Technical NEWADA PATHARA PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | - | Not Admitted-Fee/PreQual/Technical Others-Year 2021-22 ( as of31-03-2022) balance sheet not Submited |
Tender Value
Refer Docs
EMD Value
₹68,000
Closing Date
31 Oct 2022, 10:00 amClosed
EE ICD
Office of The EE ICD Barhauli Sichai Coloney Robbertsganj
Repairing of spillway jump bucket dissipaters basin suit block of dam, construction and repairing of officers colony boundary wall, gate supply and fixing with painting and all painting work
2022_UPIDC_741944_2
Tender Notice No-02/EEICD/2022-23
Open Tender
Civil Works
Item Rate
90 days
Sonebhadra
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹68,000
4 Apr 2024
24 Oct 2022
31 Oct 2022
24 Oct 2022
31 Oct 2022
24 Oct 2022
Amount
E.W. excavation in foundation including cost of all material labour T&P etc.
Local Sand filling including cost of all material labour T&P
C.C. 1:3:6 in Floor & pillar of Building including cost of all material labour T&P etc.
P/L R.C.C. 1:1.5:3 with all lead & Lift including all cost of , materials, Labours, T&P & all Taxes.
Cutting bending binding and laying in position steel reinforcement including all cost.
B/W Masonary with 1:4 cement mortar of Ist class brick uniform size and shape including cost of all material labour T&P etc.
Cement Plaster in 1:4 including cost of all material labour T&P etc.
Mild steel or iron work in heavy sizes such as trusses, builtsuo gates, door frame, gate etc. wrought to required form, including drilling holes, rivetting or welding where necessary and also including supply of steel, bolt, nuts and wastage etc. and their fixing required for completion of the work.
Painting and Finishing with two coat of water proof cement paint of approved quality on previously old treated surface to give an even shade including for proper completion of work. .
Levelling dressing of premises including all arrangements
Constructing board including painting, writing, and all
Repairing Struff wall of Dam D/S in 150 M total length including all cost.
RR Stone masonary in 1:3 with cement and coarse sand including all cost of material labour etc.
CC 1:1.5:3 including all cost of material labourt&p and taxes etc.
Cement Pointing 1:2 including all cost of material labour ,T&P
M/S D.P SINGH CONTRACTOR KASHIPUR
Maa Mundheshwari Construction
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .