Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.1 LAdmitted-Fee/PreQual/Technical/Finance | -21.92% | ₹19.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹23.2 L+₹4.0 L (21.0%)Admitted-Fee/PreQual/Technical/Finance | -5.50% | ₹23.2 L+₹4.0 L (21.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹24.8 L+₹5.7 L (29.6%)Admitted-Fee/PreQual/Technical/Finance | +1.21% | ₹24.8 L+₹5.7 L (29.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹25.7 L+₹6.6 L (34.4%)Admitted-Fee/PreQual/Technical/Finance | +4.92% | ₹25.7 L+₹6.6 L (34.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹27.0 L+₹7.9 L (41.2%)Admitted-Fee/PreQual/Technical/Finance | +10.21% | ₹27.0 L+₹7.9 L (41.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.5 L
EMD Value
₹49,040
Closing Date
2 Jun 2026, 10:00 amClosed
Executive officer
municipal board kapasan
Construction work of Road Divider Railling from SH-09 To Towards Ambedkar Bhawan Main Road in Kapasan.
2026_DLB_561081_5
E-NIT 01/2026-27
Open Tender
Civil Works
Percentage
150 days
KAPASAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive officer
₹49,040
Yes
8 Jul 2026
22 May 2026
2 Jun 2026
22 May 2026
2 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: | 400 | P.Kg | 114.5 | ₹45,800 |
| 2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 780 | P.Sqm | 117.5 | ₹91,650 |
| 3 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing and staircase railing including applying a priming coat of approved steel primer. | 15,750 | P.Kg | 133.5 | ₹21,02,625 |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks | 15 | P.cum | 678 | ₹10,170 |
| 5 | Providing and laying marking of center line and stop line etc with hot thermoplastic compound 2.5 mm thick on road/ plain surface, including reflectorising glass beads @ 250 gms per sqm area with special applicator machine, as per IRC:35 including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control involved. The finished surface to be level, uniform and free from streaks and holes as per clause 803 of MoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 200 | P.Sqm | 444 | ₹88,800 |
| 6 | Supplying and fixing glow studs of size 100 X 20 mm made of heavy duty body shall be moulded ASA (Acrylic styrene Acrylortrite) of ABS having electronically welded micro prismatic lens with abrasion resistant coating as approved by Engineer- in-charge. The glow stud shall support a load of 13635 kg. tested in accordance with ASTM D4280. The slope of retro-reflective surface shall be 35+/ -5 degree to base. The panels on both sides with at least 12 cm of reflective areas up each side. The luminance intensity should be as per the specification and shall be tested as described in ASTM 1: 809 as recommended in BS : 873 part 4 : 1973 as per approved sample & manufactures by the Engineer-in-charge. | 200 | P.Each | 266.5 | ₹53,300 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 10 | P.cum | 5,910 | ₹59,100 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
NT0.pdf
Tender Documents • 1.32 MB
BOQ_998638.xls
BOQ • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .