| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC 184 NEAR GOODWAY TAILORS PRITHVIPURA RASAL ROAD BRIDGE JODHPUR RAJASTHAN 342006 | JODHPUR | RAJASTHAN | 342006 | ₹2.3 Cr | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹2.3 Cr+₹2.2 L (0.97%)Rejected-Finance UNIT 4A 4TH FLOOR MAYUR GARDEN OPP OF RAJIV BHAWAN ABC BUS STOP BHANGAGARH G S ROAD GUWAHATI KAMRUP M 781005 | KAMRUP METRO | ASSAM | 781005 | ₹2.3 Cr+₹2.2 L (0.97%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.5 Cr+₹22.8 L (10.1%)Rejected-Finance | ₹2.5 Cr+₹22.8 L (10.1%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹4.3 L
Closing Date
14 Jul 2022, 12:00 pmClosed
CGM PPD
O/o the MD, AEGCL, Guwahati
Turnkey Construction of 132kV N.F. Railway Traction Bay at 132kV Khaloigaon GSS, AEGCL including Supply of Bay Equipment and line bay materials and associated works etc
2022_AEGCL_26062_1
AEGCL BEBEJIA BAY
Open Tender
Electrical Works
Turn-key
210 days
Khaloigaon
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
₹4.3 L
7 Sept 2022
22 Jun 2022
15 Jul 2022
23 Jun 2022
14 Jul 2022
23 Jun 2022
Amount
Circuit Breakers with mounting structures and terminal connectors etc.as applicable as per specification
132 kV Gang operated outdoor SF6 Breakers
SIEMENS made Control & Relay Panel with Automation (Simplex Type) complete with BCU, ethernet switch and all accessories as required for SAS integration.
For 132 kV Feeder Capable of integration into Existing SAS at Khaloigaon GSS
Current Transformers (1-phase) with terminal connectors etc. as per specification
132 kV, 400-200/1-1-1 Line CT
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV horizontal centre break isolator With Single Earth Switch (3-phase)
132 kV horizontal centre break isolator Without Earth Switch (3-Phase)
132 kV horizontal centre break isolator Without Earth Switch (3-Phase) (Tandem Type)
Lightning Arrester with terminal connectors etc. as per specification
132 kV Lightning Arrester
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
132 kV CVT with terminal connectors etc as per specfication.
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Isolator Without Earth Switch TANDEM Type
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Supply and Design of Bay Steel Structures except equipment mounting structures
Column
Column Type 'C1A' ( 2 Nos.) [ 2317.41 Kg/ per Column ]
Column Type 'C2' ( 5 Nos.) [ 1913.04 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos.) [ 751.77 Kg/ per Beam ]
Supply of Power Cables
Supply of Control Cables
Supply of ACSR Panther Conductor
Disc Insulator Strings complete with all hardware fittings, clamps etc.
10 Disc Tension Insulator String
9 Disc Suspension Insulator String
Supply of Earthing System Materials
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
Supply of Bay Marshalling Kiosk along with mounting structure
Clamps and Connectors
Breaker Clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
CT Clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV LA and sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV CVT and sutiable for ACSR Panther Conductor
T clamp suitable for twin ACSR Panther conductor alongwith all hardware fittingsfor
PG clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Isolator pad Clamp for ACSR panther conductor alongwith all hardware fittingsfor
Post Insulator clamp for ACSR panther conductor alongwith all hardware fittingsfor
T clamp twin Panther to Single Panther Conductor alongwith all hardware fittings
suspension clamp for ACSR panther conductor alongwith all hardware fittingsfor
Supply of ABT meter as per specification
Mandatory Spares
For 132 kV SF6 Circuit Breakers
Interrupter
Tripping Coil
Closing Coil
SF6 gas filled cylinder-12kg
For Control & Relay panels
Over current relay
Earth fault relay
Distance protection Relay
Master Trip Relay
132kV Lightning Arrester
132kV , 400-200/1-1-1 Line CT
132kV, isolator moving and fixed contact
Terminal connectors for 132kV CT
Terminal connectors for 132kV isolator
Fire Fighting equipments
25 Kg Capacity FE DCP type, trolley mounted
FE CO2 6.5 kg capacity, wall mounted
Fire Buckets (12 Nos. with stand in one set)
Supply of 110 Volt Battery Bank, charger, DCDB & 415 V ACDB
Supply of 110 Volt VRLA Battery bank with battery stand and all other fittings and accessories as per specification
Supply of 110 Volt Battery charger with all fittings and accessories as per specification
Supply of 110 Volt DC DB
Supply of 415 Volt ACDB
Description of Work / Item(s)
Amount
Circuit Breakers with mounting structures and terminal connectors etc.as applicable as per specification
132 kV Gang operated outdoor SF6 Breakers
SIEMENS made Control & Relay Panel with Automation (Simplex Type) complete with BCU, ethernet switch and all accessories as required for SAS integration.
For 132 kV Feeder Capable of integration into Existing SAS at Khaloigaon GSS
Current Transformers (1-phase) with terminal connectors etc. as per specification
132 kV, 400-200/1-1-1 Line CT
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV horizontal centre break isolator With Single Earth Switch (3-phase)
132 kV horizontal centre break isolator Without Earth Switch (3-Phase)
132 kV horizontal centre break isolator Without Earth Switch (3-Phase) (Tandem Type)
Lightning Arrester with terminal connectors etc. as per specification
132 kV Lightning Arrester
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
132 kV CVT with terminal connectors etc as per specfication.
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Isolator Without Earth Switch TANDEM Type
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Supply and Design of Bay Steel Structures except equipment mounting structures
Column
Column Type 'C1A' ( 2 Nos.) [ 2317.41 Kg/ per Column ]
Column Type 'C2' ( 5 Nos.) [ 1913.04 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos.) [ 751.77 Kg/ per Beam ]
Supply of Power Cables
Supply of Control Cables
Supply of ACSR Panther Conductor
Disc Insulator Strings complete with all hardware fittings, clamps etc.
10 Disc Tension Insulator String
9 Disc Suspension Insulator String
Supply of Earthing System Materials
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
Supply of Bay Marshalling Kiosk along with mounting structure
Clamps and Connectors
Breaker Clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
CT Clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV LA and sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV CVT and sutiable for ACSR Panther Conductor
T clamp suitable for twin ACSR Panther conductor alongwith all hardware fittings
PG clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Isolator pad Clamp for ACSR panther conductor alongwith all hardware fittings
Post Insulator clamp for ACSR panther conductor alongwith all hardware fittings
T clamp twin Panther to Single Panther Conductor alongwith all hardware fittings
suspension clamp for ACSR panther conductor alongwith all hardware fittings
Supply of ABT meter as per specification
Mandatory Spares
For 132 kV SF6 Circuit Breakers
Interrupter
Tripping Coil
Closing Coil
SF6 gas filled cylinder-12kg
For Control & Relay panels
Over current relay
Earth fault relay
Distance protection Relay
Master Trip Relay
132kV Lightning Arrester
132kV , 400-200/1-1-1 Line CT
132kV, isolator moving and fixed contact
Terminal connectors for 132kV CT
Terminal connectors for 132kV isolator
Fire Fighting equipments
25 Kg Capacity FE DCP type, trolley mounted
FE CO2 6.5 kg capacity, wall mounted
Fire Buckets (12 Nos. with stand in one set)
Supply of 110 Volt Battery Bank, charger, DCDB & 415 V ACDB
Supply of 110 Volt VRLA Battery bank with battery stand and all other fittings and accessories as per specification
Supply of 110 Volt Battery charger with all fittings and accessories as per specification
Supply of 110 Volt DC DB
Supply of 415 Volt ACDB
Description of Work / Item(s)
Amount
Erection, testing & commissioning of Circuit Breakers including laying & terminating of LT power and control cables as required
132 kV Gang operated SF6 Breakers
Erection, testing & commissioning of Control & Relay Panels including laying & terminating of LT power and control cables as required
For 132 kV Feeder compatible with existing SAS (SIEMENS) at Khaloigaon GSS
Erection, testing & commissioning of Current transformers including laying & terminating of control cables as required
132 kV, 400-200/1-1-1 Line CT
Erection, testing & commissioning of Isolators including laying & terminating of LT power and control cables as required
132 kV With Single Earth Switch
132 kV Without Earth Switch
132 kV Without Earth Switch Tandem Type
Erection, testing & commissioning of Lightning Arrester including including laying & terminating of control cables as required
132 kV Lightning Arrester
Erection, testing & commissioning of Post Insulator including including laying & terminating of control cables as required
132 kV Post Insulator
Erection, testing & commissioning of CVT including including laying & terminating of control cables as required
132kV CVT
Erection of Mounting structures for different terminal equipments as required for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Isolator Without Earth Switch Tandem Type
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Erection of Switchyard Lattice Steel Columns
Column Type 'C1A' ( 2 Nos.) [ 2317.41 Kg/ per Column ]
Column Type 'C2' ( 5 Nos.) [ 1913.04 Kg/ per Column ]
Erection of Switchyard Lattice Steel Beams
Beam Type 'B1' ( 2 Nos) [ 751.77 Kg/ per Beam ]
Integration of Control Relay Panel into the existing Substation Automation System (SAS) of SIEMENS made at Khaloigaon GSS.
Hoisting of Insulator strings, Stringing of Conductors, GI shield wire etc including supply of disc insulator strings, clamps, GI stranded shield wire, connectors etc. As required for whole scope of works
Installation of earthing system with GI flats, electrodes etc. For present scope of area
Construction of Cable Trenches including supply of all materials and labour as per specification and drawing
C Type Trench
Illumination
Design and installation of outdoor illumination system for the 132kV bay area (consisting of minimum 6 Nos. of LED lamps with fittings etc.) as per specification including supply of all materials.
Erection of Bay Marshalling Kiosk as per drawings and specifications including construction of foundation inclusive of supply of all foundation Materials and Labour as directed.
Erection, testing and Commissssioning of ABT Meter as per specification
Dismantling of existing structures including Foundation
Erection, testing & commissioning of 110 Volt DCDB & 415 V ACDB
Erection, testing & commissioning of 110 Volt DC charger
Erection, testing & commissioning of 110 Volt DC battery bank
Erection, testing & commissioning of 110 Volt DCDB
Erection, testing & commissioning of 415 V ACDB
Switchyard PCC & gravelling
Plain cement concrete works of (1:3:6) by volumn with coarse ( 62.20 x 29.800 = 148.285 cum Deduction = 8.022 cum = 140.263 cum )
Micro levelling including & filling of depressions upto 100mm (62.2 x 29.80)
Gravelling (100mm) over the PCC surface (20mm broken stone) ( 1.00 x 1853.560 x 0.100 = 185.356 cum )
Earth filling of the existing drain in layers not more than 150 mm thick including necessary carriage, watering, ramming etc complete as directed and specified including payment of land compensation, forest royalty, taxes etc that maybe neccessary
Providing fitting fixing 4no. of C.I Grating, (a) 110mm dia in each PCC Panel of size (4x4)
Pipes, Bends, Junction, Tees etc. Price 6kg/sq.cm (1m length) and 110mm dia (413 x 0.300)
Construction of trapezoidal Surface Drain of length 82.63 m
Earthwork in excavation for foundation trenches of walls, retaining walls, footings of columns etc including refilling the qty. as necessary…...in ordinary soil (82.63 x 1.2 x 0.7)
Plain cement concrete works of (1:3:6) by volumn with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc as directed and specified including dewatering if necessary, and curing complete & levelling the base (shuttering where necessary shall be measured and paid separately) (a) In prop 1cement 3 seperate coarse aggregate by volumn. (82.63 x 1.2 x0.09)
Cement concrete (1:3:6) in the middle portion.
112 mm thick brickwork in mortar (1:4)
35mm thick cement plaster in the inner trapezoidal surface area of the drain (1 x 82.62 x 1.7)
35mm thick cement plaster used for coping the drain surface (2 x 82.63 x 0.3)
Description of Work / Item(s)
Amount
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Circuit Breaker (1 Set)
Excavation (16.21 Cum per breaker)
Filling (10.73 Cum per breaker)
Brick Soiling (8 Sq.m per breaker)
Formwork (15.36 Sq.m per breaker)
PCC (0.46 Cum per breaker)
RCC (4.22 Cum per breaker)
Reinforcement (209.75 Kg per breaker)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Current Transformer ( 3 Nos.)
Excavation (4.29 Cum per CT)
Filling (3.48 Cum per CT)
Brick Soiling (1.82 Sq.m per CT)
Formwork (6.56 Sq.m per CT)
PCC (0.10 Cum per CT)
RCC (0.52 Cum per CT)
Reinforcement (86.18 Kg per CT)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV CVT (3 Nos.)
Excavation (4.29 Cum per CVT)
Filling (3.48 Cum per CVT)
Brick Soiling (1.82 Sq.m per CVT)
Formwork (6.56 Sq.m per CVT)
PCC (0.10 Cum per CVT)
RCC (0.52 Cum per CVT)
Reinforcement (86.18 Kg per CVT)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Isolators With/ Without Earth Switch/Tandem ( 3 Sets)
Excavation (25.13 Cum per Isolator)
Filling (20.40 Cum per Isolator)
Brick Soiling (11.81 Sq.m per Isolator)
Formwork (16.11 Sq.m per Isolator)
PCC (0.72 Cum per Isolator)
RCC (2.83 Cum per Isolator)
Reinforcement (246.07 Kg per Isolator)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Lightning Arresters( 3 Nos)
Excavation (3.52 Cum per LA)
Filling (2.75 Cum per LA)
Brick Soiling (1.56 Sq.m per LA)
Formwork (3.88 Sq.m per LA)
PCC (0.08 Cum per LA)
RCC (0.54 Cum per LA)
Reinforcement (46.65 Kg per LA)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Post Insulator ( 8 Nos)
Excavation (3.52 Cum per PI)
Filling (2.75 Cum per PI)
Brick Soiling (1.56 Sq.m per PI)
Formwork (3.88 Sq.m per PI)
PCC (0.08 Cum per PI)
RCC (0.54 Cum per PI)
Reinforcement (46.65 Kg per PI)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for Lattice Steel Column ( for 132kV Gantry Columns Type (C2), 4 Nos.)
Excavation (110.55 Cum per Column)
Filling (97.229 Cum per Column)
Formwork (23.96 Sq.m per Column)
PCC ( 1.79Cum per Column)
RCC (8.59.Cum per Column)
Reinforcement (855.89 Kg per Column)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for Lattice Steel Column ( for 132kV lightning posts 2 Nos. & supporting Column Type (C2), 1 No.)
Excavation (110.55 Cum per Column)
Filling (97.229 Cum per Column)
Formwork (23.96 Sq.m per Column)
PCC ( 1.79Cum per Column)
RCC (8.59.Cum per Column)
Reinforcement (855.89 Kg per Column)
HI-TECH CORPORATION
D KUMAR AND COMPANY
HI-TECH CORPORATION
D KUMAR AND COMPANY
D KUMAR AND COMPANY
Mega Electricals
HI-TECH CORPORATION
Mega Electricals
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .