Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance | ₹3.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.8 LRejected-Finance | ₹3.8 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | K.Sathish L2 | Porkodi Traders L1 |
|---|---|---|---|---|---|
| 1.00Providing For CC Pavement at Ganthi nagar H/O Lalapet Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 4.5 | Cum | 135 ₹608 | 118.7 ₹534 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 20.25 | Cum | 5,550 ₹1,12,388 | 4,972.91 ₹1,00,701 Lowest |
| 4.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 28.31 | Cum | 6,929.09 ₹1,96,163 | 6,236.18 ₹1,76,546 Lowest |
| 5.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete | 53.5 | Sqm | 185 ₹9,898 | 164.25 ₹8,787 Lowest |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. | 1 | GST Amount | 57,430.26 ₹57,430.26 | 51,582.24 ₹51,582.24 Lowest |
Tender Value
Refer Docs
EMD Value
₹3,840
Closing Date
10 Mar 2026, 3:00 pmClosed
Block Development Officer
Block Development Officer
Providing For CC Pavement at Ganthi nagar H/O Lalapet Panchayat
2026_RDTN_672104_1
A2/1774/2025
Open Tender
Civil Works
Item Rate
120 days
Block Development Office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,840
16 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
Providing For CC Pavement at Ganthi nagar H/O Lalapet Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_807745.xls
BOQ • 0.32 MB
Pricebid145.pdf
Tender Documents • 0.76 MB
TechinicalBid1478.pdf
Tender Documents • 0.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].