| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | ₹5.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.4 L+₹3,432 (0.64%)Admitted-Finance | ₹5.4 L+₹3,432 (0.64%) | L2 | Admitted-Finance |
| 3 | L3₹5.4 L+₹7,490 (1.40%)Admitted-Finance | ₹5.4 L+₹7,490 (1.40%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHIV TRADERS L2 | RAHISH AND HARISH CONSTRUCTION AND INFRASTRUCTURES LLP L1 | HINDPATH CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | ||||||
| 1.10 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6 | One Cubic Metre | 7,920 ₹47,520 Lowest | 11,000 ₹66,000 | 11,700 ₹70,200 |
| 2.00Centering and shuttering including strutting, propping etc. and removal of form for : | ||||||
| 2.10 | Columns, Pillars, Piers, Abutments, Posts and Struts | 40 | One Square Metre | 450 ₹18,000 Lowest | 700 ₹28,000 | 530 ₹21,200 |
| 3.00Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | ||||||
| 3.10 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 750 | One Kilogram | 90 ₹67,500 Lowest | 90 ₹67,500 Lowest | 105 ₹78,750 |
| 4.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,600 | One Kilogram | 126 ₹2,01,600 Lowest | 130 ₹2,08,000 | 135 ₹2,16,000 |
| 5.006 mm cement plaster of mix : | ||||||
| 5.10 | 1:3 (1 cement: 3 fine sand) | 40 | One Square Metre | 450 ₹18,000 | 280 ₹11,200 Lowest | 300 ₹12,000 |
| 6.00Finishing walls with Acrylic Smooth exterior paint of required shade : | ||||||
Tender Value
₹5.6 L
EMD Value
₹11,300
Closing Date
5 Aug 2026, 6:00 pmClosed
Nodal Officer (Tender)
O/o Sr. Chief Engineer(Civil) BSNL MP Civil Zone Block-C, BDA Flats, First Floor, Vidya Nagar,Behind Petrol Pump Hoshangabad Road , Bhopal (M.P.)- 462026
Rate Contract for providing and fixing 9m/6m height Roof Top Pole set of 3 nos pole for 4 nos various site locations at OA Rajgarh OA Bhopal under BA Bhopal
2026_BSNL_285456_1
NIT NO. 19/EE(C) /BSNL-BPL/2026-27
Open Tender
Civil Works
Item Rate
90 days
Bhopal
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Accounts Officer Cash Oo GMTD BSNL Bhopal
₹11,300
19 Aug 2026
27 Jul 2026
7 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 1.1 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6 | One Cubic Metre | - | - |
| 2Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 2.1 | Columns, Pillars, Piers, Abutments, Posts and Struts | 40 | One Square Metre | - | - |
| 3Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | |||||
| 3.1 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 750 | One Kilogram | - | - |
| 4 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,600 | One Kilogram | - | - |
| 56 mm cement plaster of mix : | |||||
| 5.1 | 1:3 (1 cement: 3 fine sand) | 40 | One Square Metre | - | - |
| 6Finishing walls with Acrylic Smooth exterior paint of required shade : | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_333423.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .