| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC CHATURBHUJ INFRASTRUCTRE INDIA PRIVATE LIMITED (BID ID -4756694) 1ST LOWEST L1 |
| 2 | L2₹1.9 Cr+₹3.8 L (2.05%)Rejected-Finance | ₹1.9 Cr+₹3.8 L (2.05%) | L2 | Rejected-Finance 2ND LOWEST L2 |
| 3 | L3₹1.9 Cr+₹4.4 L (2.36%)Rejected-Finance B 30 RDC RAJNAGAR GHAZIABAD U P | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹1.9 Cr+₹4.4 L (2.36%) | L3 | Rejected-Finance 3RD LOWEST BY L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
4 Dec 2024, 2:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF SUPERINTENDING ENGINEER IST CIRCLE MEERU
Providing C C Linning on Slopes end Bed of Right main Dy Between Km 3.540 To 5.188 For FY 2024-25
2024_UPIDC_977462_1
05/SE-I/2024-25
Open Tender
Civil Works
Item Rate
180 days
MEERUT
AS PER TENDER SPEICIFICATION
2 documents required · 2 mandatory
₹2,354
₹3.8 L
Yes
7 Jan 2025
28 Nov 2024
4 Dec 2024
28 Nov 2024
4 Dec 2024
28 Nov 2024
Amount
Earhwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete
Laying C.C. in (1:4:8) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete.
Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete.
Supplying & Laying ordinary sand including cost of all material, labour & T&P etc. required for proper complition.
Providing 12.5 MM thick cement plaster in 1:4 cement mortar with coarse sand including proper curing all material ,labour T&P etc. Complete in all respect
Supplying & Laying 200 Micron Thick LDPE Film i/c cost of all Labour , material ,T&P etc . Required for proper completion of work.
Providing , supplying, fixing & Removing of Centering & shutering work for C.C. Work i/c cost of all labour material , T&P etc complete of work
Laying 75 mm thick lining in M-15(1:2:4) including cost of all material labour & T&P etc.required for proper complition of work compaction by pavar
Supplying/Fixing 10 mm thick thermocol sheet in expention joints i/c cost of all Labour , material T&P etc. required for proper completion of work.
Supplying/Fixing 10mm wide expention joints with bituminious fillar after removel of thermocol sheet i/c cost of all Labour , material T&P etc.required for proper completion of work.
Earhwork in back filling including lead upto 1.00 km and lift upto 1.50m also i/c lavelling, ramming,dressing labour ,T&P etc.complete
R.G BUILDWELL ENGINEERS LTD. (BID ID -4761427)
R G Buildtech Engineers Limited (BID ID -4761596)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .