Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹4.3 L+₹15,892.06 (3.82%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MRS.AYYAMMAL, CONTRACTOR L1 | MR.SUBBURAYALU, CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF CREMATION SHED AT BURIAL GROUND IN PILLAIYARNATHAM VILLAGE AND PANCHAYAT KURUVIKULAM PANCHAYAT UNION | |||||
| 2.00 | Earthwork excavation in all classes of Soils and Sub soils except hard rock 1 requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 17.55 | Cum | 263 ₹4,615.65 Lowest | 300 ₹5,265 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost 2 and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete Base Concrete | 9.49 | Cum | 5,497 ₹52,166.53 Lowest | 5,500 ₹52,195 |
| 4.00 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost 3 and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 5.02 | Sqm | 6,794 ₹34,105.88 Lowest | 6,800 ₹34,136 |
| 5.00 | Filling Basement inner with Excavated earth other than sand including 4 labour charges for filling, levelling, compacting, ramming, complying the standard specifications etc., complete | 10.48 | Cum | 45 ₹471.6 Lowest | 50 ₹524 |
| 6.00 | Supplying and filling with filling sand in layers not more than 15 cm thick 5 including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete For Flooring Filling material | 6.7 | Cum | 1,845 ₹12,361.5 Lowest | 1,900 ₹12,730 |
| 7.00 | Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc, complete. | 8.81 | Cum | 6,162 ₹54,287.22 Lowest | 6,200 ₹54,622 |
| 8.00 | Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete., | 55.97 | Sqm | 1,095 ₹61,287.15 Lowest | 1,200 ₹67,164 |
| 9.00 | Reinforced Cement Concrete 1:1.5:3 using 20mm ISS HBG metall including cost and conveyance of all maerials to site and all labour charges for mixing concrete, placing, ramming, vibrating with mechanical vibrator, consolidation and Curing etc., complete as directed by departmental officers. | 6.42 | Cum | 9,119 ₹58,543.98 Lowest | 9,200 ₹59,064 |
| 10.00 | Supplying and fabrication of Steel Fe 415/500 grade required for all RCC item of works involved including fabrication and labour charges for 9 Cutting, bending, tying, placing in position, includes overlaping length wherever required etc., complete | 720 | KG | 91.5 ₹65,880 Lowest | 95 ₹68,400 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
24 Sept 2026, 3:00 pmClosed
Block development office,BP, Kuruvikulam
Block development officer,BP, Kuruvikulam
BDOKRM/99/2026-A2 /PUGF26-27 /CONSTRUCTION OF CREMATION SHED AT BURIAL GROUND IN PILLAIYARNATHAM VILLAGE AND PANCHAYAT KURUVIKULAM PANCHAYAT UNION
2026_RDTN_703704_7
BDOKRM/99/2026-A2
Open Tender
Civil Works
Works
Kuruvikulam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,000
26 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF CREMATION SHED AT BURIAL GROUND IN PILLAIYARNATHAM VILLAGE AND PANCHAYAT KURUVIKULAM PANCHAYAT UNION | - | - | - | - |
| 2 | Earthwork excavation in all classes of Soils and Sub soils except hard rock 1 requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 17.55 | Cum | 263.78 | ₹4,629.34 |
| 3 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost 2 and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete Base Concrete | 9.49 | Cum | 5,498.56 | ₹52,181.33 |
| 4 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost 3 and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 5.02 | Sqm | 6,795.58 | ₹34,113.81 |
| 5 | Filling Basement inner with Excavated earth other than sand including 4 labour charges for filling, levelling, compacting, ramming, complying the standard specifications etc., complete | 10.48 | Cum | 45.85 | ₹480.51 |
| 6 | Supplying and filling with filling sand in layers not more than 15 cm thick 5 including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete For Flooring Filling material | 6.7 | Cum | 1,846.42 | ₹12,371.01 |
| 7 | Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc, complete. | 8.81 | Cum | 6,162.39 | ₹54,290.66 |
| 8 | Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete., | 55.97 | Sqm | 1,095 | ₹61,287.15 |
| 9 | Reinforced Cement Concrete 1:1.5:3 using 20mm ISS HBG metall including cost and conveyance of all maerials to site and all labour charges for mixing concrete, placing, ramming, vibrating with mechanical vibrator, consolidation and Curing etc., complete as directed by departmental officers. | 6.42 | Cum | 9,119.28 | ₹58,545.78 |
| 10 | Supplying and fabrication of Steel Fe 415/500 grade required for all RCC item of works involved including fabrication and labour charges for 9 Cutting, bending, tying, placing in position, includes overlaping length wherever required etc., complete | 720 | KG | 91.9 | ₹66,168 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.96 MB
BOQ_845974.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .