| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.9 LAdmitted-Finance | ₹34.9 L | L1 | Admitted-Finance |
| 2 | L2₹34.9 L+₹431 (0.01%)Admitted-Finance H NO 3927 SHAH COLONY SECTOR 8 NEAR NHPC COLONY SAILI ROAD TEHSIL DISTT PATHANKOT 145001 | PATHANKOT | PATHANKOT | PUNJAB | 145001 | ₹34.9 L+₹431 (0.01%) | L2 | Admitted-Finance |
| 3 | L3₹36.6 L+₹1.7 L (4.90%)Admitted-Finance OLD SABZI MANDI PATHANKOT M S NORTHERN INDIA CONSTRUCTION CO DHANGU ROAD VILLAGE TOWN PATHANKOT CITY PATHANKOT PATHANKOT PUNJAB 145001 INDIA | PATHANKOT | PUNJAB | 145001 | ₹36.6 L+₹1.7 L (4.90%) | L3 | Admitted-Finance |
| 4 | L4₹39.1 L+₹4.2 L (12.2%)Admitted-Finance | ₹39.1 L+₹4.2 L (12.2%) | L4 | Admitted-Finance |
| 5 | L5₹39.7 L+₹4.8 L (13.8%)Admitted-Finance H NO 07 SHIVAJI NAGAR PATHANKOT 145001 | PATHANKOT | PATHANKOT | PUNJAB | 145001 | ₹39.7 L+₹4.8 L (13.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KULBHUSHAN AGGARWAL L6 | satpal and brothers L7 | M/S SHAKTI ELECTRIC WORKS L5 | M/S PANKAJ SONI L1 | dinesh enterprises L8 | M/S PRADEEP KUMAR L2 | M/s Northern India Construction co L3 | M/s. Aggarwal Engineers L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1,5 mtrs in depth for laying of cables including getting out in hard and dense of soil complete all as specified and directed. | 990 | Cum | 85 ₹84,150 | 90 ₹89,100 | 90 ₹89,100 | 69 ₹68,310 | 80 ₹79,200 | 60 ₹59,400 Lowest | 85 ₹84,150 | 90 ₹89,100 |
| 2.00 | All as per item No - 01 here in before but exc 1.5 mtr in depth and n. exc 3.0 mtr in depth complete all as specified and directed by Engr- in- Charge. | 1.3 | Cum | 500 ₹650 | 200 ₹260 | 180 ₹234 | 150 ₹195 | 100 ₹130 Lowest | 200 ₹260 | 130 ₹169 | 120 ₹156 |
| 3.00 | Removing excavated material to a distance not exceeding 50 meters and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed by Engineer-in-Charge. | 451.3 | Cum | 30 ₹13,539 | 20 ₹9,026 | 23 ₹10,379.9 | 10 ₹4,513 | 5 ₹2,256.5 Lowest | 20 ₹9,026 | 15 ₹6,769.5 | 40 ₹18,052 |
| 4.00 | Returning, filling in, including spreading ,leveling, watering and well ramming in layers not exc 25 cm each all as required complete all as specified and directed by Engineer-in-Charge. | 540 | Cum | 30 ₹16,200 | 20 ₹10,800 | 23 ₹12,420 | 10 ₹5,400 | 5 ₹2,700 Lowest | 20 ₹10,800 | 15 ₹8,100 | 40 ₹21,600 |
| 5.00 | M & L for good quality dry sand cushioning to under ground electric cable on layer of 8 cm thick before laying the cable and second layer of 15 cm thick after laying the cable all as specified and directed.
Note: Punned thickness of sand shall be measured. | 330 | Cum | 300 ₹99,000 | 350 ₹1,15,500 | 380 ₹1,25,400 | 350 ₹1,15,500 | 300 ₹99,000 | 400 ₹1,32,000 | 300 ₹99,000 | 200 ₹66,000 Lowest |
| 6.00 | Supply and laying sub class 'B' bricks of (230x115x75 mm) or of size locally available , laid along alignment of cable as protection to cable in trenches complete all as specified and directed by Engineer-in-Charge | 33,500 | Each | 5.75 ₹1,92,625 | 5 ₹1,67,500 | 6 ₹2,01,000 | 5 ₹1,67,500 | 5 ₹1,67,500 | 3 ₹1,00,500 Lowest | 5 ₹1,67,500 | 5 ₹1,67,500 |
| 7.00 | Supply and lay cable XLPE insulated armoured heavy duty electric cable with aluminum conductor, 1100 volts grade of cross sectional area 16 Sq mm 04 core complete all as specified and directed.
Note: Earth work ( Excavation, Returning & refilling and removal), sand cushioning , cable protection cover, GI protection pipe shall be measured and paid for separately under respective item of Schedule. | 450 | RM | 170 ₹76,500 | 170 ₹76,500 | 160 ₹72,000 | 156 ₹70,200 | 185 ₹83,250 | 140 ₹63,000 Lowest | 150 ₹67,500 | 170 ₹76,500 |
| 8.00 | All as per item No. 7 here-in-before but of size 25 Sqmm 4 core | 1,750 | RM | 235 ₹4,11,250 | 280 ₹4,90,000 | 236 ₹4,13,000 | 223 ₹3,90,250 | 255 ₹4,46,250 | 190 ₹3,32,500 Lowest | 230 ₹4,02,500 | 280 ₹4,90,000 |
| 9.00 | All as per item No. 7 here-in-before but of size 35 Sqmm 3.5 core | 1,190 | RM | 265 ₹3,15,350 | 299 ₹3,55,810 | 280 ₹3,33,200 | 249 ₹2,96,310 Lowest | 291 ₹3,46,290 | 250 ₹2,97,500 | 260 ₹3,09,400 | 295 ₹3,51,050 |
| 10.00 | All as per item No. 7 here-in-before but of size 50 Sqmm 3.5 core | 970 | RM | 320 ₹3,10,400 | 360 ₹3,49,200 | 360 ₹3,49,200 | 333 ₹3,23,010 | 390 ₹3,78,300 | 280 ₹2,71,600 Lowest | 345 ₹3,34,650 | 350 ₹3,39,500 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
29 Jul 2026, 6:00 pmClosed
GE SOUTH PATHANKOT
GE SOUTH PATHANKOT
GES/PKT/04/2026-27 SPL REPAIR TO REPLACEMENT OF LT CABLES, JUNCTION BOXES, LT STREET LIGHT POLES, LED SECURITY LIGHTS, LT PANELS AND BUS BAR OF PERIMETER SECURITY LIGHT OF DHANGU MIL COMPLEX UNDER GE SOUTH PATHANKOT
2026_MES_762558_2
GES/PKT/04/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
PATHANKOT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE SOUTH PATHANKOT
₹98,000
Yes
9 Sept 2026
9 Jul 2026
31 Jul 2026
9 Jul 2026
29 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1,5 mtrs in depth for laying of cables including getting out in hard and dense of soil complete all as specified and directed. | 990 | Cum | 105 | ₹1,03,950 |
| 2 | All as per item No - 01 here in before but exc 1.5 mtr in depth and n. exc 3.0 mtr in depth complete all as specified and directed by Engr- in- Charge. | 1.3 | Cum | 105 | ₹136.5 |
| 3 | Removing excavated material to a distance not exceeding 50 meters and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed by Engineer-in-Charge. | 451.3 | Cum | 106 | ₹47,837.8 |
| 4 | Returning, filling in, including spreading ,leveling, watering and well ramming in layers not exc 25 cm each all as required complete all as specified and directed by Engineer-in-Charge. | 540 | Cum | 107 | ₹57,780 |
| 5 | M & L for good quality dry sand cushioning to under ground electric cable on layer of 8 cm thick before laying the cable and second layer of 15 cm thick after laying the cable all as specified and directed.
Note: Punned thickness of sand shall be measured. | 330 | Cum | 108 | ₹35,640 |
| 6 | Supply and laying sub class 'B' bricks of (230x115x75 mm) or of size locally available , laid along alignment of cable as protection to cable in trenches complete all as specified and directed by Engineer-in-Charge | 33,500 | Each | 109 | ₹36,51,500 |
| 7 | Supply and lay cable XLPE insulated armoured heavy duty electric cable with aluminum conductor, 1100 volts grade of cross sectional area 16 Sq mm 04 core complete all as specified and directed.
Note: Earth work ( Excavation, Returning & refilling and removal), sand cushioning , cable protection cover, GI protection pipe shall be measured and paid for separately under respective item of Schedule. | 450 | RM | 111 | ₹49,950 |
| 8 | All as per item No. 7 here-in-before but of size 25 Sqmm 4 core | 1,750 | RM | 119 | ₹2,08,250 |
| 9 | All as per item No. 7 here-in-before but of size 35 Sqmm 3.5 core | 1,190 | RM | 120 | ₹1,42,800 |
| 10 | All as per item No. 7 here-in-before but of size 50 Sqmm 3.5 core | 970 | RM | 121 | ₹1,17,370 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Rtender04.pdf
Tender Documents • 1.41 MB
BOQ_870592.xls
BOQ • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .