Loading…
Loading…
Tender Value
Refer Docs
Closing Date
2 Jul 2026, 4:00 pm6d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer
O/o E. E., D. W. and S. Mech. Div. Dumka
Renovation of Govindpur, Madhupur rural water supply scheme under D. W. and S. Mechanical division Dumka
2026_DWSD_115473_1
E-quotation No. 03 2026-27
Open Tender
Machineries/ Mechanical Engg Items
Dumka
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
25 Jun 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
2 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Intake well p/plant at Patro River | ||||||
| 1.01 | Supplying, Installation, testing and commissioning of water lubricated single or multistage, Radial/Mixed flow Vertical turbine pump(make-Kirloskar /Jyoti/WPIL / WILO Mather & platt) having discharge of 37.88 m³/hr against a total head of 32 meters consisting of pump bowl assemblies with dynamically balanced bronze impeller , stainless steel pump shaft , S.S. line shaft 1.5 mtr length each , 30 feet MS fabricated flanged type column assembly , strainer, non- reverse rachet coupling and discharge head etc. coupled with suitable Vertical hollow shaft -IE3 energy efficient SPDP Squirrel cage induction motor (Kirloskar/ Jyoti/ CGL make) confirming to IS 12615:2011 with latest amendments having 10% more BHP than that of Pump operating on 3-PH, 50Hz, 415 ± 10%, 1450-1500 rpm with required size of ISI marked heavy duty CIDF sluice valve & CIDF NR valve , Pressure gauge, MS clamp including cost of construction of new foundation with suitable size of nut ,bolts and packings and doing fabrication work for connecting the exiting common header delivery line etc. all complete or as per site requirement or direction of E/I. | - | Set | - | - | itemH1Code1 |
| 1.02 | Cost towards supplying, Installation, testing & commissioning of free standing type floor mounted cubical LT motor control panel fabricated with MS sheet of suitable gauge and size duly painted with two coats of red oxide primer comprising of 100 Amp, 440V copper bus bar arrangement 4 pole consisting of following accessories:
(i) 100 Amp MCCB – 1 No. (Incoming feeder)
(ii) 63 Amp MCCB – 02Nos (outgoing feeder).
(iii) 63 Amp MCCB – 01No. (As spare)
(iv) 32 Amp MCB -1 No. for lighting load and other utility load.
(v) Fully Automatic Star Delta (FASD) Starter (L&K/Havell’s/Siemen’s/Schneider/BCH make) suitable for Above pump set or more etc.- 2 Nos.
(vi) 3-phase Digital display Voltmeter & Amp Meter -2 Sets, Phase indicating light R-Y-B -3 Nos.
(vii) Copper Bus Bar- 04 Pole 200 Amp, 415V Copper strip bus bar enclosed in MS sheet along with overload relay, Motor protection device (MPD), Proper power & control wiring inside by suitable size of copper conductor and wires etc. all complete set including transportation and fitting & mounting charges at P/Plant. | - | set | - | - | - |
| 1.03 | Cost towards supply & laying 16mm² X 3 core PVC insulated & PVC Sheathed copper conductor from panel board to stabilizer and form stabilizer to motor for both p/set making proper connection with suitable size copper lugs and testing on load as per direction of E/I. | - | Mtrs | - | - | - |
| 1.04 | Cost towards painting of steel window (4’ X 3’)- 03 Nos. and repairing & painting of shutter door (10’ X 7’)- 1 No., i.e. making surface rough steel sheet (both side) of widow and door, applying one coat iron primer and two coat of enamel paints all complete. | - | Job | - | - | - |
| 1.05 | Painting of pump house with windows, door of inside and outside of pump house etc. | - | Job | - | - | - |
| 1.06 | Light wiring inside and outside of pump house with LED street light-02 Nos. (40 Watt), LED tube set- 2 Nos. (20 Watt). | - | Job | - | - | - |
| 1.07 | Cost towards supplying, Installation and commissioning of 30 KVA Servo controlled (Air/Oil cooled) automatic voltage stabilizer suitable for output voltage of 415 volt ± 1% 3 phase 50 Hz with copper wound transformer as mentioned below. The stabilizer shall function satisfactorily even if incoming supply is unbalanced between phases within range of 10%. The stabilizer should be constructed in cubical box, with bidirectional wheels for easy handling necessary monitors and user’s controls on front panel such as indication alarm, voltmeter and selector switch for measuring input and output voltage auto manual selector switch. Raise low push buttons etc. Suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. All three phases shall be independently monitored and corrected. Following protections and indication shall be incorporated.
Over Voltage/Under Voltage
Single Phasing
Cut off contactor with electronic output sensing unit
Suitable change over switch and Earthing
30KVA Air/Oil cooled Servo controlled automatic voltage stabilizer (Output 415 unit ±1%) Input 280 to 450 Volt. | - | No. | - | - | - |
| 1.08 | Cost towards breaking old PCC foundation and making new PCC foundation suitable for supplied VT pump set at Intake well. | - | Job | - | - | - |
| 2WTP at Govindpur | ||||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
BOQ_156166.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid