| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.8 LAccepted-AOC FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹72.2 L+₹17.6 L (32.3%)Rejected-Finance NOT AVAILABLE | L2 | Rejected-Finance Being other than lowest | |
| 3 | L3₹88.4 L+₹33.9 L (62.2%)Rejected-Finance 1 2 GR FLOOR VITHALKUNJ NO 3 V P ROAD ANDHERI WEST MUMBAI 400 058 | MUMBAI SUBURBAN | MAHARASHTRA | 400058 | L3 | Rejected-Finance Being other than lowest |
Tender Value
₹1.2 Cr
EMD Value
₹1.9 L
Closing Date
14 Jul 2020, 6:00 pmClosed
CWE NW Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIRS TO DAMAGED CHAJJAS WINDOWS AT RS COLABA AND REPAIRS TO SUNKUN TREATMENT KITCHEN BATHROOM FLOORING TILING PLUMBING SANITARY FITTINGS DOOR AND WINDOWS CI PVC PIPES AND CONNECTED ITEMS AT OLD AND NEW RS COLABA AT AGE BR II NW NAVY NAGAR UNDER
2020_MES_351009_1
8101/CWE(NW)/MUMBAI
Open Tender
Civil Works
Item Rate
270 days
GE NW Navy nagar
Class B and above and category a i
8 documents required · 8 mandatory
₹1,000
Yes
GE NW NAVY NAGAR
₹1.9 L
Yes
2 Nov 2020
9 Jun 2020
16 Jul 2020
9 Jun 2020
14 Jul 2020
30 Jun 2020
9 Jun 2020 - 29 Jun 2020
Amount
Demolition of RCC chajjas/drops/fins thickness exc 10 cm but not exc 15 cm, (width of chhajjas varrying from 45cm to 75cm) cutting straight, mechanically/ by means of RCC cutter machine, trimming the chajjas projections upto 15 cm from external surface of walls including errection of double steel scaffolding, covering with green cloth and all the safety measures/precautions complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Chipping ,removing carefully old broken concrete work by low impact hammer ,breaker without damaging the structure & cleaning and disposal of debris out side the premises complete all as specified and directed . Hard concrete should not be removed by force. Note: Work shall be carried out upto G+14 storey bldg. Rate incl scaffolding & Safety Net Cloth at places.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for applying the rust remover alkaline in natrue having specific gravity of 1.1 kg/ltr to the existing/additional rebars including wire brushing manually or by mechanical tools, after cleaning the disturbed surface etc. complete by draining water. Rust remover shall be procured from one of manufacturer given below complete all as specified and directed . (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite) Note :- Measurement on the basis of area of concrete exposed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for applying two coats of anti-rust protective coating in the form of Acrylic Polymer with a minimum solid content to 40% solids mixed with cement in 1:1.5 proportion (1 part polymer and 1.5 parts cement) on rebars after cleaning of rust scales as per manufacturer's instruction. Anti-rust protective shall be procured from one of manufacturer given below complete all as specified and directed . (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite) Note :- Measurement on the basis of area of concrete exposed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M & L for TMT bars 10mm dia. and over, Cut to length, bent to shape required including cranking, spirally and binding with MS wire (annealed) not less than 0.9mm dia.by placing in position new reinforcement bars including tack welding to existing reinforcement bars complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Providing bonding coat of SBR polymer over the exposed steel/welded mesh/concrete in ratio 1:1 to 1:1.5 of polymer and cement complete as directed by the consultant. SBR polymer to be procured from one of the manufacturer's given below complete all as specified and directed . (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite)
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for repairing the damaged concrete portion by SBR Polymer with a minimum solid content to 40% cement mortar in proportion 1:5:15 i.e. (1 part SBR polymer : 5 parts OPC cement and and 15 parts of graded quartz aggregate (sand) upto 25mm thickness as directed by the manufacturer's instruction including necessary curing complete all as specified and directed. SBR polymer shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite).
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for casting and repairing of excessively damaged members with micro concrete at all levels with all leads and lift as directed including mixing, laying, levelling, finishing including curing complete. Grade of Micro-concrete to be M-40 at 28 days and same shall be procured from one of manufacturer given below complete all as specified and directed. (Make : Fosroc/Sika/BASF/ Krisha conchem/Dr Fixit Pidilite).
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for providing form work of single lenght to pour the conctete/micro-concrete using waterproofing film coated ply wood complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M & L for providing and fixing of factory made fibre glass reinforced plastic (FRP) “Chajjas” – 4mm thick of “fibreways” brand in required colour, size and design made by Resin Transfer Moulding (RTM) machine technology available with laminated single piece, having smooth gradual slope curvature for easy drainage of water and duly reinforced by 02 Nos vertically and 01 No horizontally 50x 2mm thick MS flat with 12mm in built hole for gouting on the existing wall along with the 50mm flanges duly inserted and sealed in the wall complete in one single piece casted monolithically including all necessary fittings. Moulded with unsaturated polyester resign as per IS 6746 duly reinforced with fibre glass chopped strand matt (CSM) as per IS 11551. Available with protective gel coat U/V coating on top for complete resistance from the extreme of temperature, weather and sunlight complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Taking down cement plaster of any description in any position including racking out joints making key scrubbing down with water complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for 20 mm thick plastering in two coats 15 mm thick backing coat in CM 1:6 and 5 mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement all as specified including scaffolding, Safety net complete all as specified and directed. (Note :- WPC shall be measured and paid separately)
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L plastering in CM (1:3), 10 mm thick finished even and smooth for ceiling complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Supply only integral water proofing compound of approved make as per ISI complete all as specified and directed .
M&L for Rendering 15mm thick in cement mortar 1:6 on other than of concrete surface complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for preparing newly plastered or unplastered surfaces and applying sagol finish and two coats of oil emulsion distemper on wall over a coat of alkali resistant primer all over the surface on new plasterd surfaces of wall complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M & L for preparing newly plastered or unplastered surfaces and applying two coats of acrylic based exterior grade (100% Acrylic) over a coat of primer & bio wash on walls incl necessary scaffolding complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L preparation of old decorated surfaces of wall including washing and applying two coat of Acrylic emulsion paint exterior grade (100% Acrylic) over one coat of primer incl necessary scaffolding, Safety net complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for Complete removal of existing treatment, Preparing surfaces, plastered or unplastered old surfaces priming plastered and other surfaces with alkali-resistant priming paint and applying 1.5 mm thick white cement putty all over the surface two coats of distemper oil emulsion, white or tinted on walls complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for applying one coat of synthetic enamel paint including preparation of old wooden surfaces over 10cm width/girth complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L preparation of old painted surfaces over 10cm width or girth and applying one coat of synthetic enamel paint on steel surfaces complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Taking down chowkats with shutter (without taking shutter from the frame) not exc 1.5 sqm each complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F for machine cut kota stone slab single piece length as in jambs/cills of windows 18-20mm thick laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and mirror polishing (Note : kota stone single pice of Cill will be fixed in two steps) complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for Screed bed or bedding layer of mortar 20 mm thick in CM 1:4 for laying floor finishes complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Rounding to edges of stone slabs one edge,such as in steps, windows frame, cooking plateform,and other similar situations complete all as specified and directed .
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F powder coated aluminium frame/track or shutters for windows, ventilators etc. with one or more rebates including joining cleat for fixing etc.fixed or sliding type/louvered window or ventilator without sash bar, aluminium including necessary joining cleats, glazing clips, rubber packing, anodised alumnium snap beading, screwscomplete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L aluminium anodised grill with suitable aluminium anodised frame section manufactured by M/S Deco grill pattern DG-104 (10mm dia and aparture 75mm) complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Taking down shutters of any description n exc 1 sqm each.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F Second class hard wood factory made glazed and skeleton shutters 30-35 mm thick, open rebatede and prepared to receive glass, gauze etc (without sash bars), edge of framing plain chamfered of rounded, fitted with cut and mitred beads for securing glass etc. size of members of shutters shall be as specified in SSR Part I, section 8.20 (a).
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F 75 mm size stainless steel butt hinges (ISI Marked) complete all as specified and directed .
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F extruded aluminium alloy handles 125 mm size, fabricated type, anodised complete all as specified and directed .
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F Aluminium, anodised, barrel tower bolts 125 mm size of extruded section and fixed complete all as specified and directed .
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F in repairs 125mm aluminium anodised plate type II gate and shutter, hooks and eyes complete all as specified and directed .
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F 3mm thick plain sheet glass ordinary quality and glazing with aluminium and neoprene beads in square not exc 0.5 sqm in each pane complete all as specified and directed .
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F in repairs Aluminium wire cloth, 0.45mm nominal dia of wire and average width of aperture 1.40mm, cut to required size and fixed to doors,windows shutter, with wooden beading (any size) with aluminium wire staples and removing old beading complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for two coat synthetic enamel paint over a coat red pink primer on new wooden surface of any description over 10 cm width or girth not otherwise described including prepratio of surface complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Dismantling of stone slabs, bedded and pointed in any mortar of any description or thickness in floors, approns etc. including removal of debries out of defence land complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L granite (of any type) slab 18 to 20mmthick machine cut,bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of granite stone including grinding and polishing complete for kitchen plateform over 20mm thick screed bed or beddingin cement mortar 1:4 complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L machine cut Kota stone ( greenish colour, mirror polished) slab flooring 20 to 25 mm thick over cement screed bed laid and jointed with grey cement slurry mixed with pigment to match the shade of slab incl rubbing and mirror polishing, over & incl 20mm thick screed bed in CM 1:6 complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L Dismantling floor, hearth, or wall tiling incl cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L non-skid coloured Ceramic tiles 7 to 8mm thick (square/rectangular) area of each tile exceeding 0.11sqm but not excceding 0.18 sqm, in floors etc, set and jointed in epoxy mortar and pointed in white of coloured cement to match including 20 mm thick screed bed in CM 1:6 complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for rendering 12mm thick in cement mortar 1:4 on backing coat of wall tiles etc complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M & L Coloured glazed ceramic tiles 300 x 200 x 7mm on vertical surfaces set & jointed in neat cement slurry and pointed in white cement mixed with pigment complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L anodised aluminium sheeting 22 gauge thick fixed in repairs as in crumple section complete all as specified and directed .
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Hacking out broken glass panes of any description from wooden frames fixed with beads not exceeding 0.5 sqm each panes complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F sheet glass 3mm thick ordinary quality fixed with wooden beads in Sqm n. exc 0.50 Sqm in each panes complete all as specified and directed .
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Demolition of cement concrete (unrinforced) of any description and in any position not otherwise specifically provided for including chaina mozaic, WC complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Treatment of sunken floor slab compraises of the following specifications complete all as specified and directed:- (i) M&L for cleaning the sunken/lowered portion of RCC slab surface (including vertical total depth plus skirting height) of floors by wire brush, chisel out any mortar sticking to the surface and brooming completely. 4omm thick avg PCC 1:2:4 type B-0 using 12.5mm graded aggregate mixed with integral water proofing compound @ 3% by wt of cement consumed.as in padding conc to achieve proper slope including cutting holes in bricks or RCC wall for spout (Cost cutting holes and pipes shall be measured and paid separately) (ii) Rendering of uneven surfaces with 6mm thick CM 1:4 mixed with integral water proofing compound @ 3% by wt of cement consumed. Fill it with water and check dampness and seepage. Where dampness/seepage is noticed, nozzles shall be fixed and grouting carried out.( WPC shall be measured & paid separately) (iii) All junctions points of side wall where CI/GI pipes are passing through shall be sealed with epoxy puty. (iv) After drying putty, wash the slab and sides of sunken portion with water and make it clear and clean. (v) M&L for applying two coats of polymer modified cementious water proof coating as per manufacturs instruction to bottom and vertical sides up to finished floor level+100mm height. The thickness of two layer shall be 1mm. When the second layer is still sticky, coarse sand spray shall be carried for the vertical and bottom surface of the sunken portion all as specified and directed.(This item shall be peasured and paid separately) (vi) Plaster the bottom and sides up to bottom of the skirting with minimum 20mm thick CM 1:4 mixed with integral water proofing compound 3% by wt of cement consumed as per manufacturer's specification including rounding of corners and junctions sloping towards spout.( WPC shall be measured & paid separately) Note :- Test the water proofed area (ponding test) by filling water for at least 72 hours and tested for leakage seepage and to the entire satisfaction of GE. Test shall be done in presence of reps of PMG and record for each sunken slab shall be maintained. The treatment shall be carried out by authorised applicators of chemicals. Cost of testing is inclued in the rates quoted above. (vii) All pipes laid in sunken portion shall be covered with 50mm thick PCC 1:3:6 all round after painting with anticorrosive paint (Black Japan shall be paid separetely).
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Cutting holes in bricks or RCC walls exce half brick built in cement mortar including making goor after inserting and setting spouts complete all as specified and direced .
GI pipe 50mm dia medium grade laid on sunken floor complete all as specified and direced .
M&L for applying two coats of polymer modified cementious water proof coating as per manufacturs instruction to bottom and vertical sides up to finished floor level+100mm height. The thickness of two layer shall be 1mm. When the second layer is still sticky, coarse sand spray shall be carried for the vertical and bottom surface of the sunken portion complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
All pipes laid in sunken portion shall be covered with 50mm thick PCC 1:3:6 all round after painting with anticorrosive paint (Black Japan) shall be paid separately complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for filling with PCC 1:5:10 type E2 (1 Cement : 5 coarse sand : 10 graded aggregate 40 mm nominal size) complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Dismantling floor, hearth, or wall tiling incl cement mortar4 bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L non-skid coloured Ceramic tiles 300x300x6 to 7mm thick (square/rectangular) area of each tile exceeding 0.06sqm but not excceding 0.11 sqm, in floors etc, set and jointed in epoxy mortar and pointed in white of coloured cement to match including 20 mm thick screed bed in CM 1:6 complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for rendering 10mm thick in cement mortar 1:4 on backing coat of wall tiles etc complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L coloured glazed ceramic tiles 300x200x7mm on verticalsurfaces set & jointed in neat cement slurry and pointed in white cement mixed with pigment including Rendering 10mm thick in CM 1:4 backing coat to tiles complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Taking up or down GI tubing and connections 15 mm bore including cleaning for refixing or removal to store complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Refixing old GI tubing and connection15 mm bore in new or old position in ( Walls, ceiling, floors etc) with old accesories complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F GI Tubing 15 mm bore medium grade with all fitting and fixed comlete to wall and ceiling or laid in floors complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F Bib tap 15mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F Stop valves 15mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F swivel shower of PTMT any colour for fixing with 15mm pipe (Min weight 40 gms) complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F in repairs for vitreous china squatting pan Orissa pattern of size 580 x 440 mm white with back inlet and integral footrest and anti syphonnage pipe including 'P' or 'S' trap and provn of lime concrete supplied and fixed in repairs complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F in repairs vitreous china, semi-pedestal pattern ( Anglo- Indian type), white (excluding fixing bolts flushing cistern and including flush pipe) including plastic water closet seat, white, closed pattern with flat bottom and cover and mild steel chromium plated or aluminised hinging device complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F in repair Vitreous China Ware Wash hand basin white, flat back, size 550 x 400 mm size (flat back or angle back type) including cutting for and pinning ends of brackets or erecting stand complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F in repair 32mm dia waste coupling of PTMT (half or full threaded) minimum weight 32mm- 45gns complete all as specified and directed. (Make:- Blue star/Nirali)
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F pillar tap 15mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F PVC connection 15mm size with PTMT nuts of length 450mm complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F 32mm dia High density polyethylene (LDPE) pipes of pressure 6 kgf/sq.cm for WHB in repairs includding socket & screw complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F in repair PVC valveless, syphonic action type, flushing cristern, 10 ltr capacity low level, white, with inlet, ball valve, float and handle including brackets complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F Flush pipe of polyethylene of low or high density for low level cistern complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for CI Nahani trap dia of outlet 75mm fixed in repairs including jointing to waste pipe in runlead fixed in cement concrete type B 1 (1:2:4) complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for CI floor trap dia of outlet 100mm fixed in repairs including jointing to waste pipe in runlead fixed in cement concrete type B 1 (1:2:4) complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F PTMT grating doom over Nahani trap and floor trap of 100mm Dia (Minimum weight 25 gms) complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S&F Unplasticised PVC pipes of pressure rating 6 kgf/Sq.cm of 50 mm bore fixed complete to walls, ceiling or in floors including bend and sockets etc; any type of pipe complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Taking down cement plaster of any discription including racking out joints hacking for key scrubbing down with water in patches n.exc. 4 Sqm each complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for rendering 15mm thick in CM 1:6 on other than fair faces of bricks work or concrete finished even and smooth without using extra cement complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for 05 mm thickplastering in CM 1:3 on concrete surface on ceiling finished even and smooth complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for 20 mm thick plastering in two coats 15 mm thick backing coat in CM 1:6 and 5 mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement all as specified including scaffolding, Safety net complete all as specified and directed. (Note :- WPC shall be measured and paid separately)
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for preparation of newly plastered surfaces of walls and applying three coats of white wash complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
All as per item 81 above but on ceiling.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M & L for Preparing surfaces plastered new wall surfaces and applying two coats of distemper oil emulsion white or tinted over a coat of priming paint over one coat of white putty complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for Preparation of old painted surfaces of wood or wood based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint,complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for Preparation of old painted surfaces of steel or steel based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint over a coat of antirush paint/red oxide primer complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Taking down CI soil/waste/vent/rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F CI soil/waste/vent pipe in any length with ears 100mm bore (sand cast) in any length with cement joints fixed to walls complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F CI soil/waste/vent pipe in any length with ears 75mm bore (sand cast) in any length with cement joints fixed to walls complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F CI bends (any radius) for soil/waste pipes 100mm bore diminishing pieces or tapers on walls complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F CI bends (any radius) for soil/waste pipes 75mm bore diminishing pieces or tapers on walls complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F CI branch piececs single (equal or unequal) ordinary or inverted (spigot or socked type) with parallel branches for 100mm bore pipe complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F CI branch piececs single (equal or unequal) ordinary or inverted (spigot or socked type) with parallel branches for 75mm bore pipe complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Taking down PVC rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F PVC (SWR) pipes 150mm bore single socketed in any length with rubber ring joints fixed to walls complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F PVC (SWR) bends 150mm bore any radius complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for taking out/removing vegitation growth or shrubs and injecting chemical GLYPHOSPHATE 41% SL 20 ML or till refusal by making cut/injection in the stem of plants 30 mm c/c and spraying with solution (25 ml GLYPHOSPHATE 41% diluted with one lit of water) and removing the plants/vegitation growth completely dead, including necessary scaffolding, julas etc complete as per manufacturer of chemical Biostadtlndia Ltd or equivelent approved by GE.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L for Siliconate Injection Grout for rising dampness .inserting the nozzles for the rising dampness. The spacing of holes will 2 No’s holes in every 1 Sqm, Using 12 mm to 15 mm diameter drill bit, drill holes at an inclination of 45o the extent of ½ to ¾ the wall thickness and injecting in the lowest possible point almost touching the defective damp proofing course (Slab in case of floors in RCC apartments).Depending upon the severity of dampness and the materials used in the wall & in its construction, a hand pump sufficient to create pressure of approx... 2 kg/cm2 must inject chemical through pressure grouting machine. Inject the diluted liquid (1:4) by pumping till the point of return of liquid is felt. Allowing it to remain for sometime before moving to the next nozzle. Observing the area for 24 hrs. Followed by Removal of the extended / protruding nozzles and seal the holes with suitable compound. The treated areas should be washed thoroughly. Followed by providing of protective plastic cloth with plastering finish complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L anodised aluminium sheeting 22 gauge thick fixed in repairs as in crumple section complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Cleaning & drying surface of floor /dado of bathroom, WC & kitchen etc by mechanical means i.e. blower complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Opening joints of floor tiles, junction of floor & dado tiles, 300mm height from bottom layer of dado tiles with electrical grinder, electrical blower etc complete in WC, bathroom & kitchen complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M & L for inserting chemical mixture of Polymer 960: GP Resin: Super seal M-104, Aquapox in appropriate ratio of 1:1:1:1 by weight in paste form through these opened joints of floor tiles and dado upto 300mm high from floor in bathroom and kitchen including NT complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
All as per item No 101 above but in WC.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Taking down chowkats or frames not exc 1.5 sqm each with shutters (without taking off shutters from the frames) complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F powder coated anodised aluminium frame/track or shutters for windows, ventilators etc. with one or more rebates including joining cleat for fixing etc.fixed or sliding type/louvered window or ventilator without sash bar, aluminium including necessary joining cleats, glazing clips, rubber packing, anodised alumnium snap beading, screws complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
M&L aluminium anodised grill with suitable aluminium anodised frame section manufactured by M/S Deco grill pattern DG-102 (7.5mm dia and aparture 75mm) complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F Figured glass 4 mm thick, plain glass and glazing with oil putty/fixed in beadings in squares n exc 0.5 sq. m in each pane complete all as specified and directed.
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F factory made solid panel PVC door shutter 30 mm thick (style) consisting of frame made out of M.S. frame shall be covered with heat moulded plain colour PVC 'C' channel having a PVC sheet strip of 2omm width stuck inside with solvent cement for stiles and plain colour PVC sheets for top rail, lock rail & bottom rail on either side & as gap insert for top rail & bottom rail on either side & as gap insert for top rail & bottom rail; panelling of fplain colour PVC sheet to be fitted in the M.S. frame welded/sealed to the stiles. & rails with suitable PVC sheet beading, and joined together with sovent cement, suppling & fixing in the frame at site complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
S & F solid PVC door frame of size 50mm x 47mm made out of 5mm plain colour PVC sheet reinforced with M.S. Square tube, suppling & fixing in opening complete all as specified and directed
(a) Height upto and including 4th floor.
(b) 5th floor to upto and including 8th floor.
(c) 9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Removing demolished material exceeding 5KM, but not exceeding 15KM outside MD land complete all as specified and directed (i) In case of similar items with different quoted rate are observed, the lowest quoted rate amongst all shall be considered and amount will be accordingly amended. The tenderer shall be note the above requirement & shall have no claim on this account (ii) The work is to be carried out at any heigh and rate quoted shall be deemed to be included necessary scaffolding and safety measures in repairs and in patches as per latest labour laws.
SHREE JAGDISH FURNITURE CO.
Darpan Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .