Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance FLAT NO 3 3RD FLOOR EDEN MOORE 15 A 1 MANIK BANDYOPADHYAY SARANI MANIK BANDYOPADHYAY SARANI KOLKATA WEST BENGAL 700040 | KOLKATA | WEST BENGAL | 700040 | Admitted-Finance |
| 3 | Admitted-Finance 1 ITI BHAWAN OLD MADRAS ROAD DOORVANI NAGAR BENGALURU KARNATAKA 560016 | BENGALURU URBAN | KARNATAKA | 560016 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
16 Apr 2022, 5:30 pmClosed
General Manager(Engg.)
Bridge and Roof Co. (India) Ltd Kankaria Centre (4TH/5th Floor) 2/1 Russel Street Kolkata 700 071
SUPPLY, INSTALLATION, TESTING and COMMISSIONING OF 100 KWP SOLAR PLANT FOR MULTI UTILITY COMPLEX IN CONNECTION WITH THE CONSTRUCTION OF MULTI UTILITY COMPLEX and PG STUDENTS HOSTEL AT SVPPGIP, SISHU BHAWAN, CUTTACK IN THE STATE OF ODISHA.
2022_BandR_680559_1
BandR/HO/51155/TD/SOLAR PLANT/01
Open Tender
Miscellaneous Works
Works
90 days
SISHU BHAWAN
As Per Tender Document
21 documents required · 21 mandatory
₹1,180
Yes
Bridge and Roof Co.India Ltd
₹30,000
Yes
23 May 2022
25 Mar 2022
18 Apr 2022
25 Mar 2022
16 Apr 2022
25 Mar 2022
Amount
Supply, Installation, Testing and Commissioning ok 100 KWP Grid Tie Solar Plant at Sishu Bhawan
Supply,Installation,Testing,Commissioning of Solar Photovoltaic Panels Poly Crystalline 330WP (Each) (Make: WAREE/LUMINOUS) The PV modules used must qualify to the latest edition of IEC PV module qualification test or equivalent BIS standards Crystalline Silicon Solar Cell Modules IEC 61215/IS14286 .The rated output power of any supplied module shall have tolerance of +/- 3% with minimum Efficiency of the PV should be 16%.The peak-power point voltage and the peak-power point current of any supplied module and/or any module string (series connected modules) shall not vary by more than 2 (two) per cent from the respective arithmetic means for all modules and/or for all module strings, as the case may be.The module shall be provided with a junction box with either provision of external screw terminal connection or sealed type and with arrangement for provision of by-pass diode. The box shall have hinged, weather proof lid with captive screws and cable gland entry points or may be of sealed type and IP-65 rated.
Supply,Installation,Testing,Commissioning of Module Mounting Structure: Hot dip galvanized MS mounting structures may be used for mounting the modules/ panels/arrays. Each structure should have angle of inclination as per the site conditions to take maximum insolation.The mounting structure steel shall be as per latest IS 2062: 1992 and galvanization of the mounting structure shall be in compliance of latest IS 4Structural material shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, its fasteners, nuts and bolts.Thiknes of Galvanization shall be more than 80µ. Aluminium structures also can be used which can withstand the wind speed of respective wind zone. Necessary protection towards rusting need to be provided either by coating or anodization.The minimum clearance of the Bottom structure from FFL of the roof should be 300 mm [Design to be approved by Client before fabrication].].[Structural Steel : SAIL/TATA/JINDAL)
Supply,Installation,Testing,Commissioning of 1 Nos. PV Array Junction Box (AJB): a) The junction boxes are to be provided in the PV array for termination of connecting cables. The Boxes (JBs) shall be made of Powder Coated Aluminium /cast aluminium/M.S alloy with full dust, water & vermin proof arrangement. All wires/cables must be terminated through cable lugs. The JBs shall be such that input & output termination can be made through suitable cable glands.b) Each Junction Box shall have High quality Suitable capacity Metal Oxide Varistors (MOVs) / SPDs, suitable Reverse Blocking Diodes. The Junction Boxes shall have suitable arrangement monitoring and disconnection for each of the groups. Voltage: Max. 1000V DC [Make: Ensto/Equivalent,MC4-Connector: Elmex/Kripson/Equivalent].
Supply,Installation,Testing,Commissioning of ACDB : Designed for 100 kWp solar power plant with all protections as per MNRE guidelines. DC DPBs shall have sheet from enclosure of dust & vermin proof conform to IP 65 protection. The bus bars are made of copper of suitable size. Suitable capacity fuse & MCBs/MCCB shall be provided for controlling the DC power output to the PCU along with necessary surge arrestors . AC Distribution Panel Board (DPB) shall control the AC power from PCU/ inverter, and should have necessary surge arrestors. Interconnection from ACDB to mains at LT Bus bar while in grid tied mode.All switches and the circuit breakers, connectors should conform to IEC 60947, part I, II and III/ IS60947 part I, II and III. All the Panel’s shall be metal clad, totally enclosed, rigid, floor mounted, air - insulated, cubical type suitable for operation on three phase / single phase, 415 or 230 volts, 50 Hz.All indoor panels will have protection of IP54 or better. All outdoor panels will have protection of IP65 or better. . [Make MCCB: Havells/Abb/Legrand/Schneider/L&T, Junction Box: Ensto/Reputed Eqivalent]
Supply,Installation,Testing,Commissioning of Grid Connected Solar Inverter Rating: 100 KW, 3Ph Inverter, (Make: Schneider(APC)/ABB/Emersion/Luminous) . Control : Microprocessor /DSP Capacity of Each Inverter: 100 kW String Inverter .Nominal AC output voltage and frequency : 415V, 3 Phase, 50 Hz . Output frequency : 50 Hz . Max. DC input Power 110 kW. MPPT Voltage Range240 - 1000 VDC. No. of independent MPP inputs 9 Nos. Max. PV input current 26 A*9. Output Voltage Range - 230V - 480V AC. Grid Frequency Synchronization range : +/- 5 Hz. Ambient temperature considered : -20 degree C to 50 degree C. Humidity : 95 % Non-condensing. Protection of Enclosure :: IP-65(Minimum) for outdoor. Grid Frequency Tolerance range : +/- 5 Hz. Grid Voltage tolerance : 280 V to 480 V. No-load losses : Less than 1% of rated power. Inverter efficiency(minimum) : >93%. Inverter efficiency (minimum ) : > 90%. THD : < 3%. Efficiency Measurement IEC 61683/ Equivalent BIS Std.Environmental testing IEC 60068-2 (1,2,14,30) / Equivalent BIS Std.Interfacing with utility grid IEC 61727. Islanding Prevention Measurement IEC 62116. EMI/EMC : IEC 61000-6-3>16 Amps IEC 61000-6-4<16 Amps. Safety: IEC - 62109-1 (2010/4) C - 62109-2 (2011/6). All above IEC’s should be from NABL/ IEC Accredited Testing Laboratories or MNRE Approved Test Centers/ International laboratories.
Supply,Installation,Testing,Commissioning of System Earthings : Each array structure of the PV yard should be grounded/ earthed properly as per IS:3043-1987. The array field, PCU, ACDB and DCDB should also be earthed properly. Earth resistance shall not be more than 2 ohms. It shall be ensured that all the earthing points are bonded together to make them at the same potential. At least 3 nos ground pipe for system earthing with soil treatment & earth inspection pit and GI flat of suitable size & quantity should be considered [Make: OBO Beterman / Shakti/Equivalent Reputed,SPD : Citel/OBO/Reputed Equivalent.
Supply,Installation,Testing,Commissioning of Remote Monitoring System (GPRS Type): The RMS system is integrated or External unit. The following parameters are accessible via the operating interface display in real time separately for solar power plant: AC Voltage., AC Output current, Output Power, DC Input Voltage, DC Input Current, Power produce, Protective function limits (Viz-AC Over voltage, AC Under voltage, Over frequency, Under frequency ground fault. vi. The data shall be recorded in a common work sheet chronologically date wise. The data file shall be MS Excel compatible. The data shall be represented in both tabular and graphical form. viii. Simultaneous monitoring of DC and AC electrical voltage, current, power, energy and other data of the plant for correlation with solar and environment data shall be provided
Supply,Installation,Testing,Commissioning of import export type 3 phase Energy Meter, Make: L&T / Schneider /ABB/Siemens Secure & Commissioning of Net Metering
Supply,Installation,Testing,Commissioning of Lightning Arrester, Make: SPD : Citel/OBO/Reputed Equivalent.
"NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST."
ITI LIMITED
NIMBUS IRRIGATION PVT LTD
Vijayshree Steel Industries
sunstone solar solutions private limited
Solluz Energy Pvt. Ltd.
Switching AVO Electro Power Ltd.
Verde Solaire (P) Ltd
GOSOLAR POWER SYSTEMS
ADITI SOLAR PVT LTD
PIXON GREEN ENERGY PRIVATE LIMITED
Systemic Electric Pvt Ltd
J TRON ElLECTRONICS
SUNSHELL POWER
SUNSHIELD ENERGY
Kirti Solar Limited
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .