Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC BHIMWANI LOHARA RD HARYANA | ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.5 Cr+₹13.1 L (5.52%)Rejected-AOC H NO 12 N EXTENSION NEW PALAM VIHAR GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹2.5 Cr+₹13.1 L (5.52%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.6 Cr+₹18.4 L (7.77%)Rejected-AOC KADARPUR ROAD KADARPUR ROAD NEAR PARJAPATI DHARAMSHALA BADSHAPUR GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | ₹2.6 Cr+₹18.4 L (7.77%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Rambir Singh contractor L1 | Parveen kumar Contractor L3 | M/S DDR Buildtech L2 |
|---|---|---|---|---|---|---|
| 1.00 | -Making sewer connection of new sewer line in the existing manholes | 1 | NO. | 7,000 ₹7,000 | 8,000 ₹8,000 | 6,000 ₹6,000 Lowest |
| 2.00 | Analysis of rate for making house hold connection of water supply damaged during excavation | 250 | Each | 500 ₹1,25,000 Lowest | 900 ₹2,25,000 | 800 ₹2,00,000 |
| 3.00 | Analysis of rate for making house hold connection of sewer line damaged | 250 | Each | 600 ₹1,50,000 Lowest | 900 ₹2,25,000 | 900 ₹2,25,000 |
| 4.00 | Repair of damaged household Sewer connection existing line (Including GST) | 240 | Each | 400 ₹96,000 Lowest | 1,000 ₹2,40,000 | 900 ₹2,16,000 |
| 5.00 | Repair of damaged household Water Supply connection existing line (Including GST) | 240 | Each | 400 ₹96,000 Lowest | 1,000 ₹2,40,000 | 800 ₹1,92,000 |
| 6.00 | Making sewer connection from proposed 300,400,500mm to 600mm existing sewer line complete in all respect including material, T and P , Plugging and Diversion of sewerline and labour | 1 | Each | 10,000 ₹10,000 Lowest | 58,120 ₹58,120 | 56,300 ₹56,300 |
| 7.00 | Analysis of Rate for making connection of the new Sewer line 350mm i/d in the existing line of Sewerline complete in all respect. | 2 | Nos. | 5,000 ₹10,000 Lowest | 8,612 ₹17,224 | 8,000 ₹16,000 |
| 8.00 | Hiring of 20 HP high capacity sewerage submersible pump set with DG set 62 KVA including making connection with motors and panel commissioning with hydra complete in all respect (1 motor for 1 month hiring) | 4 | Per Month | 90,000 ₹3,60,000 | 75,134 ₹3,00,536 | 70,000 ₹2,80,000 Lowest |
| 9.00 | Analysis of Rate for making connection of the new Sewer line 450 mm i/d in the existing line of sewerline | 1 | Per Connection | 10,000 ₹10,000 Lowest | 11,900 ₹11,900 | 12,000 ₹12,000 |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
25 May 2026, 12:00 pmClosed
Sandeep Kumar
Municipal Corporation Gurugram
Estimate for laying of new sewerage line in Bhimgarh kheri from railway station to parkashpuri chowk, internal sewerline near Durga sweets and Ashoka appartment in Ward 35 under MCG. Re-call
2026_HRY_521463_1
202623A02CC2 D280 46D2 8B57 AE3105300BDE285ULB
Open Tender
Civil Works
Works
365 days
Gurugram
2 documents required · 2 mandatory
₹15,000
₹4.6 L
Yes
5 Aug 2026
14 May 2026
25 May 2026
14 May 2026
25 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | -Making sewer connection of new sewer line in the existing manholes | 1 | NO. | - | - |
| 2 | Analysis of rate for making house hold connection of water supply damaged during excavation | 250 | Each | - | - |
| 3 | Analysis of rate for making house hold connection of sewer line damaged | 250 | Each | - | - |
| 4 | Repair of damaged household Sewer connection existing line (Including GST) | 240 | Each | - | - |
| 5 | Repair of damaged household Water Supply connection existing line (Including GST) | 240 | Each | - | - |
| 6 | Making sewer connection from proposed 300,400,500mm to 600mm existing sewer line complete in all respect including material, T and P , Plugging and Diversion of sewerline and labour | 1 | Each | - | - |
| 7 | Analysis of Rate for making connection of the new Sewer line 350mm i/d in the existing line of Sewerline complete in all respect. | 2 | Nos. | - | - |
| 8 | Hiring of 20 HP high capacity sewerage submersible pump set with DG set 62 KVA including making connection with motors and panel commissioning with hydra complete in all respect (1 motor for 1 month hiring) | 4 | Per Month | - | - |
| 9 | Analysis of Rate for making connection of the new Sewer line 450 mm i/d in the existing line of sewerline | 1 | Per Connection | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_600371.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .