| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹2.2 L+₹1,534.73 (0.70%)Accepted-Finance | L2 | Accepted-Finance BOQ Rate accepted | |
| 3 | L3₹2.2 L+₹2,788.80 (1.27%)Accepted-Finance | L3 | Accepted-Finance BOQ Rate accepted |
Tender Value
₹2.2 L
EMD Value
₹2,300
Closing Date
11 Jun 2020, 2:00 pmClosed
SE Civil TTPS
Office of the SE Civil TTPS Tuticorin 628 004
Repair and maintenance works to the Cooling Water pump House 1 by strengthening the A, B and C pump supporting beams, columns and pedestals of Unit 3.
2020_EB_165491_1
SE C TTPS 94 2020 2021
Open Tender
Civil Works
Works
30 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,300
15 Jun 2020
29 May 2020
12 Jun 2020
29 May 2020
11 Jun 2020
29 May 2020
Amount
Dismantling the spalled / distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete.
Providing patch up works using RCC 1:1.5:3 using OP/PP cement for 75mm thick with 6 to 10mm machine crushed HBG metal with Nitobond AR mixed in cement mortar at 250ml/50 kg bag of cement including cost of all materials, labours, lead, lift, curing, etc. complete.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift, tools etc., complete.
Painting one coat of Nitozinc primer (or) equivalent mixed with hardner in the ratio 3:1 after thorough cleaning the rust in the steel plate including cost of all materials, lead, lift, etc., complete.
Providing shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete.
Providing RCC 1:1.5:3 using OP/PP with 12 to 20mm machine crushed HBG metal with Nitobond AR mixed in cement mortar at 100ml/bag of cement and quick setting compound of conplast 300RSP MID PC 0.25kg / Bag rate including cost of all materials, labours, lead, lift, curing, etc. complete.
Chipping and cleaning the existing damaged plastered surface from walls rate including cost of all labour, lead, lift etc., complete.
Plastering with C.M.1:5, 12 mm thick, including cost of all materials, labours, lead, lift, tools etc., complete.
Providing one coat of white wash with white cement to the newly plastered area including cost of all materials, labour, lead, lift etc., complete.
Siva Co
NSR AND COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .