Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.8 L+₹10,294.13 (3.76%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-WRONG TR |
Tender Value
₹2.9 L
EMD Value
₹8,824
Closing Date
21 Sept 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
FINDC2627111309-(CO LANE AT DIFFERENT SPOTS MIRPORA) 7
2026_RDPR_324526_16
e- NIT No. 78 OF REWK/RETD/PRI/2026-27 Dated 14-09-2026
Open Tender
Civil Works
Percentage
45 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EX ENGINEER REW KULGAM
₹8,824
29 Sept 2026
14 Sept 2026
23 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of Labours for Site Clearance etc. | 5 | No | 553 | ₹2,765 |
| 2 | Providing and laying in position stone soling using Nallah stone including all leads, lifts and carriages complete job | 15.97 | cum | 1,229.35 | ₹19,632.72 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) including all leads, lifts and carriages complete job. | 18.79 | cum | 5,849.3 | ₹1,09,908.35 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including all leads, lifts and carriages complete job | 23.91 | cum | 6,404.84 | ₹1,53,139.72 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 26.15 | sqm | 286.35 | ₹7,488.05 |
| 6 | Provision for sign board and photographs, ETC | 1 | No | 1,184 | ₹1,184 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_1094739.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .