Loading…
Loading…
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
7 Jul 2026, 4:00 pm4d left
Executive Engineer RnB Division
SUMBAL SONAWARI
Construction of Chawki Rearing Centre (CRC) Mulberry Farm Sonmertang
2026_PWDJK_313670_1
NIT NO 21 OF 2026-27 SUMBAL DIVISION
Open Tender
Civil Works
60 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Executive Engineer RnB Division
₹40,000
25 Jun 2026
25 Jun 2026
8 Jul 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation over areas (Exceeding 30cm in depth 1.5m in width) including disposal of excavated earth to be leveled and neatly dressed up to a lead of 50m in all kinds of soil Including dewatering complete job. | 62.54 | Cum | 256.85 | ₹16,063.4 |
| 2 | Providing and laying of soling stone size over on level (hand packed) watering ramming complete under raft and flooring.. | 22.34 | Cum | 1,000 | ₹22,340 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level. M-7.5 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate) 40mm nominal size crushed in foundation and under flooring. | 7.54 | Cum | 5,202.9 | ₹39,229.87 |
| 4 | Providing and laying in position specified grade of Reinforced cement concrete M20 (1 : 1.5 : 3) excluding the cost of centering, shuttering, finishing and reinforcement.All works upto plinth level including carriage complete. | 10.84 | Cum | 7,788.4 | ₹84,426.26 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – all works upto plinth level: M-15 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size crushed ) | 27.82 | Cum | 6,591.25 | ₹1,83,368.58 |
| 6 | Providing and laying in position specified grade of Reinforced cement concrete M20 (1:1.5:3) excluding the cost of centering, shuttering, finishing and reinforcement.All works above plinth including carriage complete. | 11.83 | Cum | 9,821.85 | ₹1,16,192.49 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work (Kitply shuttering) for:-Foundation ,footings,bases of columns | 123.34 | Sqm | 286.35 | ₹35,318.41 |
| 8 | suspended floors, beams,lintels | 56.9 | Sqm | 718.2 | ₹40,865.58 |
| 9 | edges of slab | 35.59 | RM | 262.2 | ₹9,331.7 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 15.02 | Sqm | 577.55 | ₹8,674.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_1015365.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid