Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 CrAccepted-AOC D 154 D 154 GROUND FLOOR INDUSTRIAL ESTATE PHASE VII MOHALL | ₹1.4 Cr | L-1 | Accepted-AOC Awarded |
| 2 | L-2₹1.6 Cr+₹15.4 L (11.0%)Rejected-AOC | ₹1.6 Cr+₹15.4 L (11.0%) | L-2 | Rejected-AOC Evaluate |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
27 Dec 2021, 5:00 pmClosed
Executive Engineer
Water Supply and Sanitation Division No 3 SAS Nagar
Supply Installation Commissioning O and M of IOT Enabled Automation System 17 Nos 16 Nos Tubewells 1 No Pumping Station for 11 WS Schemes in Section No. 592 Sub Divisional office 9 Under the Jurisdiction of EE Divisional Office No.3 DWSS SAS Nagar
2021_WSS_78416_1
8963-64 dt 03.12.2021
Open Tender
Construction Works
Item Rate
90 days
SAS Nagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹3.2 L
Yes
SAS Nagar
6 May 2022
6 Dec 2021
28 Dec 2021
6 Dec 2021
27 Dec 2021
6 Dec 2021
9 Dec 2021
Amount
PART - A Survey, Design, Supply, Installation, Testing & Commissioning of Soft starter based starter panel with GSM/GPRS based PLC / RTU System Enclosure-1.6 mm CRCA sheet, wall mounted, single door, bottom front side cable entry point, Siemens grey 7035 color Soft Starter- Thyrister based, 415 V, 3phase, Acceleration-deceleration soft control, Inbuilt bypass contactor MCCB-Suitable rating MCCB, 36 KA, thermal magnetic based GSM/GPRS Module (RTU/PLC)-Web connected GSM/GPRS module, 5-30 V DC Input, Inbuilt DI-10 Nos., DO-6 Nos., AI-8 Nos., Pulse-1 No., Comm.- Modbus/Eth.
Meter-Multifunction energy meter with Modbus comm. able to monitor electrical parameters (Voltage, Current, Frequency, Power factor, KWH)
MODEL - SSG2UPM32 (15 Kw / 20 Hp)
Supply, Installation, Testing & Commissioning of Electromagnetic Flow Meter
Range – 80 to 700 mm Line Size
Power Supply – 80 to 300 V AC/DC
Output – 4-20 mA
Communication Interface – RS 485 (Modbus RTU)
Data Logger – Optional
Pressure rating – 16 Kg/Cm2
Design of measuring sensor – Flange DIN PN 16
Flange materials – Carbon Steel
Sensor Lining – Hard Rubber
Electrode Materials – SS 316 L
Protection Class – IP 68
Cable Length – 10 Meter
Measuring Tube – SS 304
Accessories – Flanges, Tail Piece, DI Joints, Expander, Reducer, Rubber sheets, Nut-bolts, etc. complete in all respect.
MODEL - MAGFLOW (75 MM)
MODEL - MAGFLOW (100 MM)
MODEL - MAGFLOW (150 MM)
Supply, Installation, Testing & Commissioning of Radar / Ultrasonic type Level transmitter Ingress Protection – IP 66, Measuring range – Up to 20 M, Process temp.- -40 to 60 deg. C, Full PVDF Body – For a long sensor lifetime
Supply, Installation, Testing & Commissioning of Residual Chlorine Analyzer Measuring principle – Free Chlorine for Drinking water Measurement range – 0 to 5 mg/l HOCL
Supply, Installation, Testing & Commissioning of Wafer type Butterfly Valve with Electrical actuator Body Material - CI/DI Pressure Rating – PN16 Feedback - 100% Open & 100% close
Supply, Installation, Testing & Commissioning of Wafer type Butterfly Valve with Electrical actuator Body Material - CI/DI For Distribution line of Overhead Tanks Pressure Rating – PN16 Feedback - 100% Open & 100% close
Supply, Installation, Testing & Commissioning of Pressure Transmitter Measuring range – 10 kg/cm2 Output – 4 to 20 mA Aux Supply – 24 V DC
Supply, Installation, testing & Commissioning of Hydrostatic Depth Sensor Measuring range – 50 Meter Output – 4 to 20 mA Aux. supply – 24 V DC
PART - B Supply, Installation, Development, Testing & Commissioning of Web-based SCADA System Required tags SCADA Software (Compatible for 55 nos. of tube wells) USB License Key Web enable – Unlimited Users Mobile Application API (Application Programming Interface) Software Report generation software 22" Computer Server with keyboard mouse A4 size laser printer 12 Months SIM Card charges for data transmission
PART-C
Operation and maintenance for each scheme per annum including all taxes and labour cess charges .Complete Job
For 1st Year after completion of 3 months DLP
For 2nd Year after completion of 1st year O&M
For 3rd Year after completion of 2nd year O&M
For 4th Year after completion of 3rd year O&M
For 5th Year after completion of 4th year O&M
Unique Power And Automation Pvt. Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .