Tender Value
₹16.5 L
EMD Value
₹16,500
Closing Date
16 Aug 2022, 2:00 pmClosed
SE/GCC-I/CHENNAI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2022_EB_246288_1
OT-015/22-23 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Sriperumbudur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,500
Yes
20 Aug 2022
8 Aug 2022
17 Aug 2022
8 Aug 2022
16 Aug 2022
8 Aug 2022
Amount
Fabrication galvanising and supply of GI tower parts in accordance with boards design as per drawings furnished and as per IS:2062 Grade A and as detailed in this specification including cost of all materials, labour, leads, and lifts etc., complete as directed by the department engineer at site.
Supply of hot dipped GI bolts & nuts, including packing wahsers and electro galvanished spring washers as per relevent Istest IS including cost of all trasport charges leads and lifts etc., as per standard specification and as directed by the department engineer at site.
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. ST Fittings for Zebra.
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. SS Fittings for Zebra.
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. SB Vibration Damper for Zebra.
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Mid span joit for Zebra.
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Repair Sleeve for Zebra.
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Tension clamp for 7/3.66 mm Earth Wire
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Midspan compression joint for 7/3.66 mm Earth Wire
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Aluminium Earth Bond.
Labour charges for Clearing of Juliflora jungle including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
Levelling the site and removing scrub jungles and earth by engaging JCB including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Bailling out of water by pumpset including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Labour charges for assembling of template in correct position and aligenment for various equipment plinth and grouting the foundation bolts including cost of all materials transport, labour, lead, lift etc., complete as per standard specification and as directed by the dept. Engineer at site. (LS Tower)
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Providing shoring and shuttering with either country wood planks and scantlings or steel sheets and props for the excavation of pits for tower foundation wherever necessary as directed by the Board Engineer due to caving of sides on account of ground water seepage including cost of dewatering using with 5HP motor, transport T&Ps , fuel charges, labour lead lift, etc., complete as directed by the department engineer at site.
Supplyig and filling with M-Sand filling for foundation including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site.
Plain Cement Concrete 1:3:6 using 20 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site.
Providing and laying P:C:C 1:2:4 using 20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying P.C.C 1:2:4 using 20mm HBG stone with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Labour charges for back filling of pits with excavated earth other then sand in layers of 150mm thick, including charges for spreading watering, consolidation as per standard specification and as directed by the engineer at site including all labour, transport charges, lead and lift etc., complete.
Supplying and providing Pipe type earthing with 40 mm dia GI pipe (medium class) as per specification and as direct by the site engineer including cost of all meterials, cutting of earth wire to the required length and connecting to the tower leg and earth pipe with 2 Nos. bolts, nuts, with washers, drilling charges etc., complete as per specification and as directed by the department engineer at site.
Labour charge for transporting and erection of tower parts including sorting out of tower parts at stores and site, rectification in tower parts if any, cost of T&P, labour, transport from stores, lead, lift, etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for welding of bolts and nuts 1 cm each diagonally opposite each other after tightening and puching to avoid theft of tower parts with one coat of painting zinc coat in the welded portion including cost of welding rod, hire charge for generators, painting the bolts and nuts transporting labour, lead, lift etc complete as per instrution incharge of department engineer at site
Labour charges for Transporting and hoisting of 14 units tension insulators 120 KN with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. (Under LC Condition)
Labour charges for Transporting and hoisting of 13 units 90 KN suspension tension insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. (Under LC Condition)
Labour charges for transporting and paying out of 3 Nos. of Zebra conductor with fittings including sorting out of conductor, providing trussels of 30.0m intervals for paying out of conductors, according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete.
Labour charges for rough sagging, tensioning & Clipping of 3 Nos. Zebra Conductor with fittings including sorting out of conductor according to drum schedule and loading and unloading at site providing trussels cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. For single span
labour charges for paying out and stringing of 1 no. GI 7/3.55 mm SWG steel earth wire with fittings cost of T&P lead and lift, etc., complete as directed by the department engineer at site.
Labour charges for rough sagging, tensioning of 1 No. GI earth wire and tensioning, with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Under LC condition
Providing temporary stay during rough sagging and tensioning including necessary excavation burying anchor structures fixing stay wire refilling and removal of stays after tensioning with cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site.
Arranging and attending shutdowns work on HT / LT, EHT lines, dismandling and restringing of HT / LT / EHT lines after completion of line stringing work including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site (one set means all the conductor and earth wire in the corresponding one no HT / LT / EHT line)
Labour charges for painting tower legs using best qulity anticorroessive black paint two coats 1 m above coping including cost of all materials, labour, transport, lead, lift etc., complete as directed by the department engineer at site.
Labour charges for fixing, painting Number board 200 mm X 200 mm with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for fixing, painting Danger Board 100 mm x 500 mm with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Fabrication supply, fixing and painting phase plate (Set of three) 20 mm dia with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for fixing, painting Name board 1500 mm x 600 mm (Circuit Name) with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Plastering with CM 1:3 including cost of all materials, labour, curing, lead, lift etc., complete. as directed by the department at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .