Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.3 LAccepted-Finance 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L1 | Accepted-Finance L1 | |
| 2 | L2₹87.1 L+₹3.8 L (4.59%)Accepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | L2 | Accepted-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹73,200
Closing Date
28 Jun 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/MTPS-II
o/o CE/MTPS-II
Overhauling of Air pre heater B and replacement of Hot and Cold end worn-out eroded sector plate assembly during the AOH 2024 25
2024_EB_456298_1
OT 82 Overhauling of APH B
Open Tender
Maintenance Works
Works
40 days
SE/M-I/MTPS-II
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹73,200
Yes
22 Jul 2024
21 Jun 2024
29 Jun 2024
21 Jun 2024
28 Jun 2024
21 Jun 2024
Amount
Marking and gas cutting of Air Pre Heater Flue gas/PA/SA shell body mother plate with chain block support at insulation removed location for required size to facilitate to dismantling and removing of existing worn-out hot end sector plate and erection of a new hot end sector plate through this APH Flue gas/PA/SA shell body mother plate and re-erection of the mother plate after renewal of new sector plate.
Dismantling of APH T-bars at hot end side located at out board of sector plate, by removing of fasteners using special tools and gas cutting of jammed fasteners and re-assembling of T-bars after the erection of a new hot end sector plate.
Dismantling of hot end rotor post seal by gas cutting from guide bearing spool piece at in board without damaging the guide bearing spool piece by providing proper supports at inside of the APH on flue gas side, primary air side and secondary air side and re-erection of hot end rotor post seal in position by welding with guide bearing spool piece at in board after the erection of a new hot end sector plate.
Dismantling of hot end static seals provide at a hot end secor plate by arresting the static seal plates using chain blocks, gas cutting and goughing of static seals without damaging the sector plate and center section plate at inside the APH and re-erection of a new hot end static seals of sector plate in position by welding with center section plate and a new sector plate erected with proper clearance between guiding surfaces.
Dismantling of a hot end sector plate guide pins located at in board and out board of APH by gas cutting and removing from the top of centre section plate at the top of Air Pre Heater and mechanical cleaning of pins and re-erection of dismantled sector plate guide pins in position by welding with center section plate after the erection of a new hot end sector plate.
Removing of inboard adjuster screw and out board adjust screw of a hot end sector plate one by one after arresting and supporting the sector plate. Mechanical claning of all adjuster screw and threaded holes in center section plate and re-assembling the adjuster screw with center section plate and sector plate after positioing of a new hot end setor plate in exact location.
Cutting and removing of bracing support pipes at APH flue gas hot end side to facilitate to mobile the lowered the sector plate by rotating the APH rotor and re-erection of removed bracing pipes by welding in position after the erection of new hot end sector plate.
Arresting of existing wornout sector plate by chain block and hydraulic jack after removing of adjuster screws and guide pins, lowering of sector plate gradually and placing it on APH rotor by providing proper packing and releasing of chain block supports, lifting of a sector plate at in-board mounted on self aligning roller by means of jack and keep it without touching the guide bearing spool and static part of APH, cutting of roller brackets, releasing of lowered sector plate by mobilizing on flue gas side, lifting and drawing outside of Air Pre Heater through the opening made in Air Pre Heater flue gas side shell body mother plate, leading and lowering of removed worn-out hot end sector plate from 19.15mtr Air Pre Heater floor level to '0' mtr boiler floor by means of motor operated winch, transporting and devoluting to store.
Erection of a new hot end sector plate, this work includes transporting of sector plate from store to site, leading and lifting of a new hot end sector plate from '0'mtr boiler floor to 17mtr Air Pre Heater floor level by means of motor operated winch and inserting the new sector plate through the flue gas shell body mother plate opening by means of chain blocks support, placing the sector plate on rotor out board by packing with hydraulic jacks in proper orientation on the APH rotor, lifting of a sector plate at in-board by means of jack without touching the static part of APH and sector plate in board mounting roller, releasing of chain block supports from static body of APH, mobilizing the new sector plate to the existing wornout sector plate removed location by means of rotating the APH rotor and re-assembling the new hot end sector plate in position asper standard procedure and aligning of setor plate as per the standard alignment protocol.
Commissioning after the completing of new hot end & cold sector plate erection works and providing field support for monitoring the performance till the unit attain maximum generation.
Cutting and removing of rigid stoppers checking and correction of rotor leveling, checking and correction of critical distance between guide bearing housing and housing sleeve and fixing, welding the rigid stoppers and provide shim packing in between guide bearing housing and permanent stoppers
Fixing up straight edge after finding the low point of sector plate adjusting the radial seals to correct clearance, clamping the seals in both hot end and cold end of APH.
Removal of worn - out radial seal in both cold end and hot end and re fixing with new HT bolts & nuts and positioning (including transporting of new materials from stores to site and scraps from site to stores)
Fixing up straight edge after finding the low point of axial seal plate, adjusting the axial seals to correct clearance, clamping the seals properly in both hot end and cold end of APH
Removal of worn-out axial seal in both cold end and hot end re fixing with new HT bolts and positioning. (including transporting of new materials from stores to site and scaps from site to stores).
Removal of worn-out/damaged bypass seals (complete assembly CE & HE) fixing and positioning properly with new seals, new HT bolts. (Including transporting of new materials from stores to site and scraps from site to stores).
Opening of all manhole doors & closing manhole doors after completion of work including changing of asbestos ropes and clamps in the doors.
Removal of Ash deposit inside the APH.
Overhaul of APH soot blower mechanism including inspection,changing the bearings if required and lubrication etc., (Bearing supplied by TANGEDCO)
Water washing of Air Pre Heater.
Removal of Cold end heating elements from its position, leading to the adjacent area of the Air Pre heater, dry cleaning, high jet pressure water cleaning and then air cleaning and putting back the same / New heating elements after renewal of Cold end support frame and diaphragm plate.
Removal of Hot end sacrificing heating elements from its position, leading to the adjacent area of the Air Pre heater, dry cleaning, high jet pressure water cleaning and then air cleaning and putting back the same / New heating elements after renewal of Hot end support frame and diaphragm plate.
Providing platform at cold end area for rectficaction work in soot blower
Renewal / Rectification of eroded soot blower nozzle (5 Nos)
Renewal / Rectification of eroded soot blower pipe assembly.
Overhauling of the Air Pre Heater eroded portion of the center section of the guide bearing.
Renewal of the APH (Gear box) motor shaft oil seal and air motor shaft oil seal.
Renewal of Air motor clutch assembly APH 'B'.
Overhauling of rotor shell, Diaphragm plate above 300 mm and intermediate heating elements support bars.
Patch up work on the eroded portion of the cold end Diaphragm plate
Transpoting the refractory from Mtps II central store to boiler "0" mtr and leading and lifting to Boiler required area required elevation by providing chain block, pulley and rope.
Removing of old refractory and bringing to ‘0’m, including cost of all consumables, tools and plants etc.,
Providing shuttering for refractory and Applying new refractory in the required area including consumables and hire charges for T&Ps.
Marking and gas cutting of Air Pre Heater Flue gas/PA/SA shell body mother plate with chain block support at insulation removed location for required size to facilitate to dismantling and removing of existing worn-out cold end sector plate and erection of a new cold end sector plate through this APH flue gas shell body mother plate and re-erection of the mother plate after renewal of new sector plate.
Dismantling of APH T-bars at cold end side located at out board of sector plate, by removing of fasteners using special tools and gas cutting of jammed fasteners and re-assembling of T-bars after the erection of a new cold end sector plate.
Dismantling of cold end rotor post seal by gas cutting from guide bearing spool piece at in board without damaging the guide bearing spool piece by providing proper supports at inside of the APH on flue gas side, primary air side and secondary air side and re-erection of cold end rotor post seal in position by welding with guide bearing spool piece at in board after the erection of a new cold end sector plate.
Dismantling of cold end static seals provide at a cold end secor plate by arresting the static seal plates using chain blocks, gas cutting and goughing of static seals without damaging the sector plate and center section plate at inside the APH and re-erection of a new cold end static seals of sector plate in position by welding with center section plate and a new sector plate erected with proper clearance between guiding surfaces.
Dismantling of a cold end sector plate guide pins located at in board and out board of APH by gas cutting and removing from the top of centre section plate at the top of Air Pre Heater and mechanical cleaning of pins and re-erection of dismantled sector plate guide pins in position by welding with center section plate after the erection of a new cold end sector plate.
Removing of inboard adjuster screw and out board adjust screw of a cold end sector plate one by one after arresting and supporting the sector plate. Mechanical claning of all adjuster screw and threaded holes in center section plate and re-assembling the adjuster screw with center section plate and sector plate after positioing of a new cold end setor plate in exact location.
Cutting and removing of bracing support pipes at APH flue gas cold end side to facilitate to mobile the lowered the sector plate by rotating the APH rotor and re-erection of removed bracing pipes by welding in position after the erection of new hot end sector plate.
Arresting of existing wornout sector plate by chain block and hydraulic jack after removing of adjuster screws and guide pins, lowering of sector plate gradually and placing it by providing proper packing and releasing of chain block supports, lifting of a sector plate at in-board mounted on self aligning roller by means of jack and keep it without touching the guide bearing spool and static part of APH, cutting of roller brackets, releasing of lowered sector plate by mobilizing on flue gas side, lifting and drawing outside of Air Pre Heater through the opening made in Air Pre Heater flue gas side shell body mother plate, leading and lowering of removed worn-out cold end sector plate from 8.5mtr Air Pre Heater floor level to '0' mtr boiler floor by means of motor operated winch, transporting and devoluting to store.
Erection of a new cold end sector plate, this work includes transporting of sector plate from store to site, leading and lifting of a new cold end sector plate from '0'mtr boiler floor to 8.5mtr Air Pre Heater floor level by means of motor operated winch and inserting the new sector plate through the flue gas shell body mother plate opening by means of chain blocks support, placing the sector plate on rotor out board by packing with hydraulic jacks in proper orientation on the APH rotor, lifting of a sector plate at in-board by means of jack without touching the static part of APH and sector plate in board mounting roller, releasing of chain block supports from static body of APH, mobilizing the new sector plate to the existing wornout sector plate removed location by means of rotating the APH rotor and re-assembling the new cold end sector plate in position asper standard procedure and aligning of setor plate as per the standard alignment protocol.
Checking of Guide bearing/ Support bearing, the work includes draining of lub oil from bearing, removal of lub oil inlet and outlet pipe lines from guide bearing housing, removal of guide bearing housing cover, checking and correcting the guide bearing level, providing necessary lock cleaning and flushing of guide bearing, inspection of guide bearing, checking and correcting the level og guide bearing and renewal of new oil and assembly the same including cost of consumables and T & P's etc.,
THIAGARAJAN ENGINEERING CONTRACTOR (BID ID -1072285)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .