| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC 4 14 A LEMBALAKUDDI PUDUKKOTTAI DISTRICT | PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | ₹16.0 L | L1 | Accepted-AOC Accept |
| 2 | L2₹16.0 LRejected-Finance | ₹16.0 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | SRINIVASAN P L2 | R.GANESAN L1 |
|---|---|---|---|---|---|
| 1.00Name of Work:Construction of Drainage From Varuthaiyangarpalayam Mariyapan House to Children park at Senthur Garden Phase - I H/O Kondaiyampalayam Panchayat. SS Kulam union in Coimbatore District under CDF & Mines and Minerals (2024-2025) and Village Panchayat General Fund 2025-2026 Package No.TN 01-SSKM-01 | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification . | 319.8 | Cum | 132 ₹42,213.60 | 131.85 ₹42,165.63 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 24.6 | Cum | 5,475 ₹1.3 L | 5,473.25 ₹1.3 L |
| 4.00 | Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or susitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete. | 576 | Sqm | 550 ₹3.2 L | 547.5 ₹3.2 L |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying & curing etc complete for 10 cum. | 129.6 | Cum | 6,228 ₹8.1 L | 6,226.25 ₹8.1 L |
| 6.00 | Plastering with C.M 1:5 mix,to 20mm thick including cost and conveyence of all materials to site and all other labour charges etc., complete | 120 | Sqm | 575 ₹69,000 | 571.91 ₹68,629.20 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,34,153 ₹2.3 L | 2,33,836 ₹2.3 L |
Tender Value
₹16.3 L
EMD Value
₹16,500
Closing Date
29 Jan 2026, 3:00 pmClosed
Block Development Officer BP
BDO Office S.S kulam
Construction of Drainage From Varuthaiyangarpalayam Mariyapan House to Children park at Senthur Garden Phase I H/O Kondaiyampalayam Panchayat
2026_RDTN_645713_1
994/2021/A2
Open Tender
Civil Works
180 days
Kondayampalayam
Construction of Drainage From Varuthaiyangarpalayam Mariyapan House to Children park at Senthur Garden Phase I H/O Kondaiyampalayam Panchayat
4 documents required · 4 mandatory
₹0
₹16,500
Yes
6 Feb 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification .
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or susitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying & curing etc complete for 10 cum.
Plastering with C.M 1:5 mix,to 20mm thick including cost and conveyence of all materials to site and all other labour charges etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_773964.xls
BOQ • 0.31 MB
tech.pdf
Tender Documents • 0.84 MB
pricebid.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid