Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Less CDR |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Nit No and s No not mentioned on CDR & TR , Correction in affidavit |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Single |
Tender Value
₹6.0 L
EMD Value
₹11,954
Closing Date
10 Sept 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
FINDC2627101825-(DEVELOPMENT OF BHQ BUILDING BWO WALLING INSTALLATION OF GATE AND OTHER ALLIED ACTIVITIES BLOCK ARIPAL)
2026_RDPR_322800_17
e- NIT No. 110/2026-27 Dated 29-08-2026
Open Tender
Civil Works
Percentage
45 days
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer REW Pulwama
₹11,954
11 Sept 2026
31 Aug 2026
11 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | 4.71 | cum | - | - |
| 2 | Engagement of labors for dislodging of existing GI walling so as to provite concre plinth to it and riasie it above ground loevel raising including stacking of serviceable material for reuse and reerectin g the GI Shet waling of 956 feeet lenth complete job | 20 | No. | - | - |
| 3 | Supplying and laying of stone soling / Plum hand packed tightly including ramming, watering | 22.38 | cum | - | - |
| 4 | Providing and laying cement concrete in kerbs, steps and the like at or near ground level
including curing, excluding the cost of centring, shuttering, and finishing.
4.7.2 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size) | 0.54 | cum | - | - |
| 5 | Providing and laying in position specified Grade of Reinforced cement concrete excluding the cost of centring, shutering and finishing of all work.1:2:4(1 Cement : 2 Coarse sand : 4 Graded stone aggregates 20 mm nominal size) Raft | 1.09 | cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
4.4.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 21.71 | cum | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 109.35 | kg | 1 | ₹109.24 |
| 8 | Cost of Plum | 1.03 | cum | - | - |
| 9 | Centering and shuttering including strutting propping etc. and removal of form work; Foundations, footings, bases of columns, mass concreting. | 72.33 | sqm | - | - |
| 10 | Brick work with FPS bricks of class designation 75 in super structure in cement mortar 1:6 (1 Cement : 6 Coarse sand) including Extra Brick Work in superstructure above plinth level upto Floor Five Level | 5.14 | cum | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_1084208.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .