Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr Quoted ₹1.3 Cr | L1 | Accepted-AOC AWARDED FOR BEING L1 BIDDER |
| 2 | L2₹1.3 Cr+₹199.07 (<0.01%)Rejected-Finance ANANTA OCP JAGANNATH AREA | ANUGUL | ODISHA | 759103 | ₹1.3 Cr+₹199.07 (<0.01%) | L2 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 3 | L3₹1.3 Cr+₹2.4 L (1.88%)Rejected-Finance TALCHER TENTULEI VIKRAMPUR BIDYUT COLONY FCI ANGUL ODISHA 759106 UDYAM OD 01 0014132 | ANUGUL | ODISHA | 759106 | ₹1.3 Cr+₹2.4 L (1.88%) | L3 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 4 | Rejected-Technical AT MALLIBANDHA PO KALAMACHHUNIN PS COLLIERY TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | - | - | Rejected-Technical REJECTED FOR NOT BEING COMPLIED OF ALL CONFIRMATORY DOCUMENTS |
| 5 | Rejected-Technical AT SUSUDA PO ANKULA DIST ANGUL ODISHA 759132 | ANUGUL | ODISHA | 759132 | - | - | Rejected-Technical REJECTED FOR NOT BEING COMPLIED OF ALL CONFIRMATORY DOCUMENTS |
Tender Value
₹1.4 Cr
EMD Value
₹1.7 L
Closing Date
8 Sept 2023, 5:00 pmClosed
STAFF OFFICER (CIVIL), HINGULA AREA
SO (CIVIL), OFFICE OF THE GM, HINGULA AREA, P.O._N.S.NAGAR, TALCHER, ANGUL_759148, ODISHA, INDIA
Spraying of water for dust suppression on coal corridor road from Mallibandha underpass to KCC Company at Hingula OCP of Hingula Area.(for a period of 365 days).
2023_MCL_286585_1
MCL/GM(HA)/CIVIL/e-Tender/ 23-24/38 Dt 21-08-2023
Open Tender
Civil Works - Others
Item Rate
365 days
HINGULA OCP
AS PER NIT
5 documents required · 5 mandatory
₹1.7 L
7 Nov 2023
23 Aug 2023
11 Sept 2023
23 Aug 2023
8 Sept 2023
23 Aug 2023
23 Aug 2023 - 1 Sept 2023
Amount
Item Description/ Heading
Spraying of water on Coal Transportation Road for suppression of dust by mobile tanker having spraying arrangement(Motor with coupling set up and suction pump),under pressure (The water spraying jets to be fitted at about 1.20 mtr above the road surface and spraying nozzles are directed in a horizontal manner). The water spraying arrangement should be pressurized through Hydraulic pressure of the tipper and loading of water into tankers by departmental arrangement with all lead and lift including the hire charges of water tanker, pump, cost of diesel, mobile, repair and maintenance and wages of driver and helper etc. all complete (The details/specification of the work enclosed).
Owning and operation cost for installation of vehicle tracking machine in Trucks/ Tanker/Tractor for route length tracking including rest hour for movement analysis and positioning with submission of report etc. complete as per instruction of EIC.
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Sanjay Kumar
ROUT CONSTRUCTION
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .