Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-Finance | L1 | Accepted-Finance Being L1 and vide Resolution No.11(17) dated 09.10.2026 | |
| 2 | L1₹6.4 LRejected-Finance C O SAKHARDANDE APARTMENT 1ST FLOOR ALTINHO PANAJI GOA | NORTH GOA | GOA | 403001 | L1 | Rejected-Finance vide Resolution No.11(17) dated 09.10.2026 | |
| 3 | L2₹8.9 L+₹2.4 L (37.6%)Rejected-Finance HOUSING BOARD COLONY BORDEM BICHOLIM GOA | NORTH GOA | GOA | 403001 | L2 | Rejected-Finance being L2 |
Tender Value
₹8.0 L
EMD Value
₹16,100
Closing Date
15 Jun 2026, 11:00 amClosed
V.P. Sarpanch
V.P. Curca-Bambolim-Talaulim, Tiswadi-Goa 403108.
Construction of Walking Track from Ramakant Adpaikar house to Crosscraft Decoration at Gawali Moula, W No. I, V.P. Curca-Bambolim-Talaulim, Tiswadi-Goa.
2026_VP_29504_1
VP/CBT/2026-27/653
Open Tender
Civil Works
Percentage
60 days
V.P. Curca-Bambolim-Talaulim
2 documents required · 2 mandatory
₹5,000
₹16,100
24 Oct 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator) manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. | |||||
| 1.01 | All kinds of soil | 45.5 | M3 | 291 | ₹13,240.5 |
| 1.02 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 40.5 | M3 | 2,211 | ₹89,545.5 |
| 2Providing and laying in position cement concrete 1:2:4 (1 cement :2 coarse sand: 4 graded granitic or basaltic stone aggregate 40m nominal size) excluding cost of centering shuttering and finishing: | |||||
| 2.01 | All works upto plinth level | 32.5 | M3 | 6,635 | ₹2,15,637.5 |
| 3Centering and shuttering including struttings, propping etc. and removal pf formwork for: | |||||
| 3.01 | Foundations, footings bases for columns and mass concrete. | 160 | M2 | 407 | ₹65,120 |
| 4Supplying and filing in plinth under floors, trenches including watering ramming consolidating dressing, complete. | |||||
| 4.01 | Morrum | 60 | M3 | 662 | ₹39,720 |
| 5providing & laying cement concrete 1:3:6 (1 cement :3 coarse sand : 6 graded granitic or basltic stone aggrt. 40 mm nominal size) excluding cost of centering, shuttering and finishing in: | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_29928.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .