Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.4 LAdmitted-Finance | ₹5.4 L | L2 | Admitted-Finance |
| 3 | L3₹6.1 LAdmitted-Finance | ₹6.1 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Technocrat Electrical L2 | Gupta Elect and Engg Works L3 | Meena Elect & Engg. Works L1 |
|---|---|---|---|---|---|---|
| 1.00 | PART - A WORK Drain out of transformer oil in empty oil drums from Exiting 20 MVA transformer to get required level up to 03 KL at 132 kV Sub-Station Shikarpur | 1 | JOB | 8,000 ₹8,000 | 5,000 ₹5,000 | 2,500 ₹2,500 |
| 2.00 | Complete dismantling of the accessories of Exiting 20 MVA, 132/33 KV Transformer at 132 KV Sub-Station Shikarpur after opening of jumpers, removal of earthing and opening of cables & connection, removal of all radiators, conservator tank, oil pipe lines, bushings, etc. to complete the jobs satisfactorily including Blanking, nuts and bolts all other T&P shall be arranged by the contractor at him own cost. | 1 | JOB | 30,000 ₹30,000 | 26,000 ₹26,000 | 35,000 ₹35,000 |
| 3.00 | Shifting/Dragging of oil filled Exiting 20 MVA Transformer from Existing place to near safe place at 132/33 KV Sub-Station Shikarpur distance upto 20 Mtr. | 1 | JOB | 10,000 ₹10,000 | 22,000 ₹22,000 | 25,000 ₹25,000 |
| 4.00 | Additional Shifting 100 Mtr. every 5 Mtr. per job. | 20 | JOB | 50 ₹1,000 | 2,000 ₹40,000 | 1,200 ₹24,000 |
| 5.00 | Shifting of Transformer accessories at safe place as per directions of supervising engineer | 120 | MTR | 50 ₹6,000 | 50 ₹6,000 | 25 ₹3,000 |
| 6.00 | Shifting of main tank of New 40 MVA Transformer from unloading point to the plinth up to 20 Mtr distance including turning of tank if required including all T&P and labour required to complete the job satisfactorily | 1 | JOB | 25,000 ₹25,000 | 25,000 ₹25,000 | 30,000 ₹30,000 |
| 7.00 | Additional Shifting 100 Mtr. every 5 Mtr. per job. | 20 | JOB | 50 ₹1,000 | 2,500 ₹50,000 | 1,200 ₹24,000 |
| 8.00 | Complete erection of New 40 MVA 132/33 KV Transformer by erection of radiator, conservator tank, bushing with its turrets (if available) connecting of all oil pipe line, erection of cooling fans, making control cables connection, Buchholz relay etc. for completing the work, topping of T/F oil and final oil filling in tank, radiator, conservator tank and all other associates work for completion of work | 1 | JOB | 50,000 ₹50,000 | 27,000 ₹27,000 | 40,000 ₹40,000 |
| 9.00 | Dismantling of 120 kV L.A., by connecting of earthing strip joining of jumpers and erection of structures (ALP, BCT) etc. along with associated substation structure required after shifting of newly replaced 40 MVA, 132/33 KV Transformer. | 1 | JOB | 3,000 ₹3,000 | 3,000 ₹3,000 | 3,000 ₹3,000 |
| 10.00 | Re-erection of 120 kV L.A., by connecting of earthing strip joining of jumpers and erection of structures (ALP, BCT) etc. along with associated substation structure required after shifting of newly replaced 40 MVA, 132/33 KV Transformer. | 1 | JOB | 3,000 ₹3,000 | 3,000 ₹3,000 | 3,000 ₹3,000 |
Tender Value
₹6.5 L
EMD Value
₹7,000
Closing Date
23 Apr 2026, 12:00 pmClosed
SE ETC UPPTCL GREATER NOIDA
400 KV SUB STATION PALI GAUTAM BUDH NAGAR GREATER NOIDA
FOR ERECTION WORK OF NEW 40 MVA TRANSFORMER MAKE TECHNICAL ASSOCIATES LTD ATV 132 KV SUB STATION SHIKARPUR UNDER ETD KHURJA UNDER ETC GREATER NOIDA
2026_UPTCL_1134616_1
T-02/2026-27ETC/GN
Open Tender
Electrical Works
20 days
KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ELECTRICITY 400 KV SUB STATION GREATER NOIDA
₹7,000
GREATER NOIDA
3 Jul 2026
8 Apr 2026
23 Apr 2026
8 Apr 2026
23 Apr 2026
8 Apr 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART - A WORK Drain out of transformer oil in empty oil drums from Exiting 20 MVA transformer to get required level up to 03 KL at 132 kV Sub-Station Shikarpur | - | JOB | - | - |
| 2 | Complete dismantling of the accessories of Exiting 20 MVA, 132/33 KV Transformer at 132 KV Sub-Station Shikarpur after opening of jumpers, removal of earthing and opening of cables & connection, removal of all radiators, conservator tank, oil pipe lines, bushings, etc. to complete the jobs satisfactorily including Blanking, nuts and bolts all other T&P shall be arranged by the contractor at him own cost. | - | JOB | - | - |
| 3 | Shifting/Dragging of oil filled Exiting 20 MVA Transformer from Existing place to near safe place at 132/33 KV Sub-Station Shikarpur distance upto 20 Mtr. | - | JOB | - | - |
| 4 | Additional Shifting 100 Mtr. every 5 Mtr. per job. | - | JOB | - | - |
| 5 | Shifting of Transformer accessories at safe place as per directions of supervising engineer | - | MTR | - | - |
| 6 | Shifting of main tank of New 40 MVA Transformer from unloading point to the plinth up to 20 Mtr distance including turning of tank if required including all T&P and labour required to complete the job satisfactorily | - | JOB | - | - |
| 7 | Additional Shifting 100 Mtr. every 5 Mtr. per job. | - | JOB | - | - |
| 8 | Complete erection of New 40 MVA 132/33 KV Transformer by erection of radiator, conservator tank, bushing with its turrets (if available) connecting of all oil pipe line, erection of cooling fans, making control cables connection, Buchholz relay etc. for completing the work, topping of T/F oil and final oil filling in tank, radiator, conservator tank and all other associates work for completion of work | - | JOB | - | - |
| 9 | Dismantling of 120 kV L.A., by connecting of earthing strip joining of jumpers and erection of structures (ALP, BCT) etc. along with associated substation structure required after shifting of newly replaced 40 MVA, 132/33 KV Transformer. | - | JOB | - | - |
| 10 | Re-erection of 120 kV L.A., by connecting of earthing strip joining of jumpers and erection of structures (ALP, BCT) etc. along with associated substation structure required after shifting of newly replaced 40 MVA, 132/33 KV Transformer. | - | JOB | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2.pdf
Tender Documents • 19.89 MB
BOQ_2118196.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid