Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.1 LAdmitted-Fee/PreQual/Technical/Finance ODISHA | -21.89% | ₹7.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.2 L+₹6,191.84 (0.87%)Admitted-Fee/PreQual/Technical/Finance | -21.21% | ₹7.2 L+₹6,191.84 (0.87%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.6 L+₹53,632.27 (7.54%)Admitted-Fee/PreQual/Technical/Finance | -16.00% | ₹7.6 L+₹53,632.27 (7.54%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.6 L+₹1.5 L (21.2%)Admitted-Fee/PreQual/Technical/Finance | -5.30% | ₹8.6 L+₹1.5 L (21.2%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.1 L
EMD Value
₹9,200
Closing Date
23 Jul 2026, 3:00 pmClosed
Executive Engineer,Central Tender Cell
Central Tender Cell, UG Floor, ICOMC Tower, Satya Nagar
Completion of Hall and Community Centre for Senior Citizens located at Sailashree Vihar HIG Colony Park in Ward No. 06
2026_ORULB_135288_2
BMC-EE-Tender Cell-38/2026-27 dt. 09.07.2026
Open Tender
Civil Works - Others
Percentage
60 days
BMC, AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹9,200
Yes
Office chamber of the EE,Central Tender Cell
23 Jul 2026
13 Jul 2026
23 Jul 2026
13 Jul 2026
23 Jul 2026
13 Jul 2026
13 Jul 2026 - 17 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fly Ash Brick masonry in C.M. (1:4) in founadtion & plinth and super structure having crushing strength not less than 75 Kg / cm2 with dimensional tolerance ± 2%. | - | Cum | 5,697.18 | - |
| 2 | Cement concrete work of M-20 grade with 20mm and down grade crusher broken hard granite chips including hoisting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc all complete as per OPWD specification required for the work to finished items of work. | - | Cum | 6,160.3 | - |
| 3 | Labour charges for cutting, bending, binding and tying the grill including the cost of M.S. rod. | - | Qtl | 9,389.58 | - |
| 4 | 40 mm thick grading concrete (1:2:4) on roof slab with 12 mm & down grade CBHGC chips for old work. 42 | 92.38 | Sqm | 839.82 | ₹77,582.57 |
| 5 | 12mm thick C:P (1:6) over brick work | - | Sqm | 186.87 | - |
| 6 | 16mm thick C:P (1:6) over brick & stone masonry | - | Sqm | 270.57 | - |
| 7 | 6mm thick C:P (1:4) finished smooth | - | Sqm | 177.53 | - |
| 8 | C:C: (1:2:4) using 12 mm to 20 mm size H.G. stone chips including the cost of all materials labour carriage, royalty etc complete. | 1 | Cum | 7,741.45 | ₹7,740.68 |
| 9 | Supplying, fifting and fixing vetrifed tile in floors of size 600mm x 600mm(plain) of approved make conforming to IS: 13755 with application of polymere modified quick set cement based water resistant adhesive conforming to IS:15477 OF 3MM thick bed and filling joints with white cement ofapproved quality including cost of all materials, takes labour T&P etc required for the work. | - | Sqm | 1,187.47 | - |
| 10 | Fixing Vitrified tiles in dados skirting and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete including cost of precast tiles. | 5.55 | Sqm | 1,774.97 | ₹9,851.08 |
stage.html
html • 0.02 MB
finance_600869.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_600869.xls
BOQ • 0.27 MB
DTCN.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .