Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 CrAdmitted-Finance HOUSE NO 152 NEAR D A V KAPILDEV PUBLIC SCHOOL DELATOLI KADRU DORANDA P O HARMU P S ARGORA KADRU RANCHI RANCHI JHARKHAND 834002 | RANCHI | JHARKHAND | 834002 | ₹6.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.2 Cr+₹73.8 L (11.4%)Admitted-Finance NULL | ₹7.2 Cr+₹73.8 L (11.4%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical DECISION |
| 4 | Rejected-Technical | - | - | Rejected-Technical DECISION |
| Sl No | Description | Qty | Unit | waystone engicon private limited L1 | IMAM HUSSAIN L2 |
|---|---|---|---|---|---|
| 1.00 | Supply and installation of Vibrating Wire type Uplift pressuremeterRange:-0-10kg/cm2,Accuracy:-0.1%FSD Enclosure: -Hermetically sealedAccessories:-Tee, Releasevalve, PlugandBourdonTube Pressure Gauge having range 0-10kg/cm2 | 25 | Nos | 22,500 ₹5,62,500 | 21,500 ₹5,37,500 Lowest |
| 2.00 | Supply & installation of joint meter accuracy +/- 0.1FSD res. +/-0.2% FSD | 8 | Nos | 38,000 ₹3,04,000 Lowest | 42,000 ₹3,36,000 |
| 3.00 | Supply & installation of Strong motion Accelerographfull scale range 24bit 500 sps | 3 | Nos | 32,80,000 ₹98,40,000 | 3,28,000 ₹9,84,000 Lowest |
| 4.00 | Supply & installation of Plumb linestain less steel wire, weight, oil tank, MS table plates, plumb bobs and travelling Vernier microscope for measurement of deflection in X and Y directions, weather proof cabinet with illumination. Range-100mm,Accuracy-0.01mm | 2 | Nos | 8,70,000 ₹17,40,000 Lowest | 8,95,000 ₹17,90,000 |
| 5.00 | Supply and installation of ElectronicBoreholeextensometerwithitsalliedaccessories 3.pointmodelhavinganchorsat3,5and10meterswithelectronicsensors.. | 2 | Nos | 2,56,000 ₹5,12,000 Lowest | 2,95,000 ₹5,90,000 |
| 6.00 | Supply & installation of Tilt meter | 7 | Nos | 98,000 ₹6,86,000 Lowest | 9,50,000 ₹66,50,000 |
| 7.00 | Supply and installation of AutomaticData Logger capable of takingobservations of all the Vibrating wireinstrumentsinstalledinthebodyofdam | 1 | Job | 24,06,600 ₹24,06,600 Lowest | 28,05,000 ₹28,05,000 |
| 8.00 | Supply and installation of JunctionBoxeachsuitable forInstrumentsEnclosure:-Heavydutysteel | 9 | Nos | 9,800 ₹88,200 Lowest | 1,05,000 ₹9,45,000 |
| 9.00 | Joining & laying of 52 Core jelly filled Copper Cable from the foundation gallery up to entry face of the gallery at EL 180 & Joining & fixing of 9 Nos Junction Boxes. | 1,200 | Meter | 780 ₹9,36,000 | 720 ₹8,64,000 Lowest |
| 10.00 | Supply and installation of Digital Indicator Power Supply:- 230 VAC+/- 10 % 50 HZ Input :- From Instruments | 9 | Nos | 1,56,000 ₹14,04,000 Lowest | 1,75,000 ₹15,75,000 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
24 Mar 2022, 5:00 pmClosed
Executive Engineer
Executive Engineer Subernarekha Dam Division No.2 ,Chandil
Installation of 02 Nos.of Plumb Line and Instrumentation Work inside Chandil dam gallery.
2022_WRD_56879_1
WRD/SMP/SDD-2CHANDIL/NIQ-10
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
EOI
910 days
CHANDIL
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1 L
Yes
2 Sept 2022
10 Mar 2022
28 Mar 2022
10 Mar 2022
24 Mar 2022
10 Mar 2022
Amount
Supply and installation of Vibrating Wire type Uplift pressuremeterRange:-0-10kg/cm2,Accuracy:-0.1%FSD Enclosure: -Hermetically sealedAccessories:-Tee, Releasevalve, PlugandBourdonTube Pressure Gauge having range 0-10kg/cm2
Supply & installation of joint meter accuracy +/- 0.1FSD res. +/-0.2% FSD
Supply & installation of Strong motion Accelerographfull scale range 24bit 500 sps
Supply & installation of Plumb linestain less steel wire, weight, oil tank, MS table plates, plumb bobs and travelling Vernier microscope for measurement of deflection in X and Y directions, weather proof cabinet with illumination. Range-100mm,Accuracy-0.01mm
Supply and installation of ElectronicBoreholeextensometerwithitsalliedaccessories 3.pointmodelhavinganchorsat3,5and10meterswithelectronicsensors..
Supply & installation of Tilt meter
Supply and installation of AutomaticData Logger capable of takingobservations of all the Vibrating wireinstrumentsinstalledinthebodyofdam
Supply and installation of JunctionBoxeachsuitable forInstrumentsEnclosure:-Heavydutysteel
Joining & laying of 52 Core jelly filled Copper Cable from the foundation gallery up to entry face of the gallery at EL 180 & Joining & fixing of 9 Nos Junction Boxes.
Supply and installation of Digital Indicator Power Supply:- 230 VAC+/- 10 % 50 HZ Input :- From Instruments
Supply and installation of Temperature Sensor and Transmitter with required Accessories
Axillary Supply Armoured cables for all Meters from UPS (3Cx2.5 Sqmm) including water proof JB BOX as per required.
Transducer control unit cables of OUTPUT 4 TO 20 Mile Ampere with existing RTU TB Box Laying Cable with all accessories items.
Armoured CAT-6 Lan Cable
OFC Fibre Cable (12 core) With optical joint Box with converter
HDPE 40 mm silicon duct with fixing clamp
Laying of DC cable for required accessories equipment’s in tunnel
Supply and installation of Automation SCADA Systems with Secure data protection technology (a) RTU (REMOTE TERMINAL UNIT, Along with all accessories like main and standby CPU CARD, DI CARD, DO-CARD, AI CARD,PSU CARD,MODEMS Etc.)
(b) supply, installation, testing and commissioning of Control Room equipment’s consisting of following items- i) SCADA server ii) 55" GDU Display screen iv) Printer vi) Furniture vii) SCADA LDMS software with required modus and IEC-104 Protocol as per meter configuration specification viii)GPS Real Time data clock ix)weather temperature sensor x)Electrode Earthing plate
© 2X5 KVA UPS with Battery output 48V DC Supply for RTU and 230V AC for LDMS systems and all Meters Auxiliary supply.
d) Erection, Testing, and Commissioning of SCADA Software configuration and all Equipment’s accessories mounting along with required cables
e) Collection & integration of data of functional Resistance type strain meter (25Nos) ,Resistance type no stress strain ( 05 nos) ,Resistance type stress meter (05) into SCADA System.
f) Integration of operation of functional 25 HP submersible(Two nos) and centrifugal(Two nos) dewatering pumps installed at dam gallery in SCADA system .
Extension ,Renovation of Control Room ( Including construction of first floor if required ) along with installation of proper Air conditioning and Fire fighting system
Installation and commissioning of whole system. The work includes required replacing of already installed cables with new cables, shifting of all Display units for above instruments from foundation gallery to new location at control room and making the whole system operative.
Monthly maintenance, observation and analysis of Instruments.
IMAM HUSSAIN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .