Tender Value
₹2.9 L
EMD Value
₹5,760
Closing Date
16 Oct 2026, 6:00 pmClosed
Executive Engineer PWD RandB PD III JAMMU
Office of the PWD RandB PROJECT DIVISION III JAMMU
Facelifting of MB-4 at Wazarat Road, Jammu. CNo-407 NP
2026_PWDJK_327790_7
Short e-NIT No. 114 of 2026-2027 Dated 10-10-2026
Open Tender
Civil Works
Percentage
15 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PD III Jammu
₹5,760
Office of the PWD RandB PROJECT DIVISION III JAMMU
10 Oct 2026
10 Oct 2026
17 Oct 2026
10 Oct 2026
16 Oct 2026
10 Oct 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 0.71 | cum. | 2,516.85 | ₹1,786.96 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.6.1 All kinds of soil : | 20.39 | cum. | 592.9 | ₹12,089.23 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
4.4.7 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.84 | cum. | 5,202.9 | ₹4,370.44 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level
5.1.2 1:11⁄2:3 (1 cement : 11⁄2 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.4 | cum. | 7,788.4 | ₹10,903.76 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,
buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement.
5.2.2 1:11⁄2:3 (1 cement : 11⁄2 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.6 | cum. | 9,395.7 | ₹24,428.82 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:
5.9.2 Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | 26.67 | sqm. | 628.95 | ₹16,774.1 |
| 7 | 12mm Cement plaster finished with a floating coat of neat cement of mix: 13.7.2 1 : 4 ( 1 cement : 4 fine sand) | 26.67 | sqm. | 353.1 | ₹9,417.18 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 558 | kg | 123.2 | ₹68,745.6 |
| 9 | Providing and fixing G.I. pipes complete with G.I. fittings and clamps,
including cutting and making good the walls etc.:
19.4.1 Internal work-Exposed on wall
19.4.1.1 15 mm dia. nominal bore (Medium) | 6.4 | meter | 360.55 | ₹2,307.52 |
| 10 | Providing and fixing G.I. pipes complete with G.I. fittings and clamps,
including cutting and making good the walls etc.:
19.4.1 Internal work-Exposed on wall
19.4.1.2 20 mm dia. nominal bore (Light) | 6.4 | meter | 400.45 | ₹2,562.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_1109345.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .