| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹50.0 L+₹4.9 L (10.8%)Accepted-AOC | ₹50.0 L+₹4.9 L (10.8%) | L3 | Accepted-AOC accepted |
| 2 | L1₹45.1 LRejected-Finance KOLLIDAM | ₹45.1 L | L1 | Rejected-Finance rejected |
| 3 | L2₹46.7 L+₹1.6 L (3.47%)Rejected-Finance | ₹46.7 L+₹1.6 L (3.47%) | L2 | Rejected-Finance rejected |
| 4 | L4₹50.9 L+₹5.8 L (13.0%)Rejected-Finance | ₹50.9 L+₹5.8 L (13.0%) | L4 | Rejected-Finance rejected |
| 5 | L5₹51.5 L+₹6.4 L (14.3%)Rejected-Finance | ₹51.5 L+₹6.4 L (14.3%) | L5 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | janki rajadurai L2 | C. VALARMATHI L8 | Jeeva Constructions L9 | RAJADURAI L3 | R PATHMAVATHI CIVIL CONTRACTOR L4 | R.Gayathri L7 | sivagamasundari R L6 | Vijaya Builders L5 | jj engineering construction L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Strengthening of Kadavasal Gandi Nagar Road R 35 Km 0/0-3/09 in Kadavasal Panchayat | ||||||||||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete. | 3,708 | sqm | 20 ₹74,160 | 23.36 ₹86,618.88 | 25 ₹92,700 | 20 ₹74,160 | 20 ₹74,160 | 22.89 ₹84,876.12 | 22 ₹81,576 | 22.66 ₹84,023.28 | 19.83 ₹73,529.64 Lowest |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 216.3 | cum | 140 ₹30,282 | 140.45 ₹30,379.34 | 145 ₹31,363.5 | 139 ₹30,065.7 | 110 ₹23,793 Lowest | 137.64 ₹29,771.53 | 140 ₹30,282 | 136.24 ₹29,468.71 | 119.24 ₹25,791.61 |
| 4.00Collection and supply of US Gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete, | ||||||||||||
| 5.00 | 0.00 km to 1.00 km | 60 | cum | 1,000 ₹60,000 | 1,036.78 ₹62,206.8 | 1,040 ₹62,400 | 1,020 ₹61,200 | 1,020 ₹61,200 | 1,016.04 ₹60,962.4 | 1,030 ₹61,800 | 1,005.68 ₹60,340.8 | 880.23 ₹52,813.8 Lowest |
| 6.00 | 1.00 km to 2.00 km | 60 | cum | 1,010 ₹60,600 | 1,046.21 ₹62,772.6 | 1,050 ₹63,000 | 1,020 ₹61,200 | 1,020 ₹61,200 | 1,025.29 ₹61,517.4 | 1,030 ₹61,800 | 1,014.82 ₹60,889.2 | 888.23 ₹53,293.8 Lowest |
| 7.00 | 2.00 km to 3.00 km | 60 | cum | 1,050 ₹63,000 | 1,055.64 ₹63,338.4 | 1,062 ₹63,720 | 1,030 ₹61,800 | 1,025 ₹61,500 | 1,034.53 ₹62,071.8 | 1,040 ₹62,400 | 1,023.97 ₹61,438.2 | 896.24 ₹53,774.4 Lowest |
| 8.00 | 3.00 km to 3.09 km | 5.4 | cum | 1,050 ₹5,670 | 1,055.64 ₹5,700.46 | 1,062 ₹5,734.8 | 1,030 ₹5,562 | 1,020 ₹5,508 | 1,034.53 ₹5,586.46 | 1,040 ₹5,616 | 1,023.97 ₹5,529.44 | 896.24 ₹4,839.7 Lowest |
| 9.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | ||||||||||||
| 10.00 | 0.00 km to 1.00 km | 8.01 | cum | 5,600 ₹44,856 | 5,621.06 ₹45,024.69 | 5,635 ₹45,136.35 | 5,610 ₹44,936.1 | 5,650 ₹45,256.5 | 5,508.64 ₹44,124.21 | 5,650 ₹45,256.5 | 5,452.43 ₹43,673.96 | 4,772.28 ₹38,225.96 Lowest |
Tender Value
₹53.6 L
EMD Value
₹53,600
Closing Date
3 Mar 2026, 3:00 pmClosed
Block Development officer (B.P),Kollidam Block
Block Development officer (B.P),Kollidam Block
Strengthening of Kadavasal Gandi Nagar Road R 35 Km 0/0-3/09 in Kadavasal Panchayat Kollidam Block Mayiladuthurai District Under RURAL ROAD MAINTENANCE SCHEME 2025-2026
2026_RDTN_664924_1
4150/2025/A2 03.03.2026
Open Tender
Civil Works - Roads
Item Rate
120 days
Block Development officer (B.P), Kollidam Block
refer tender notice
7 documents required · 7 mandatory
₹0
₹53,600
Yes
Block Development officer (B.P),Kollidam Block
13 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
23 Feb 2026 - 24 Feb 2026
23 Feb 2026
Strengthening of Kadavasal Gandi Nagar Road R 35 Km 0/0-3/09 in Kadavasal Panchayat
Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of US Gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete,
0.00 km to 1.00 km
1.00 km to 2.00 km
2.00 km to 3.00 km
3.00 km to 3.09 km
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
0.00 km to 1.00 km
1.00 km to 2.00 km
2.00 km to 3.00 km
Providing and laying TACK COAT over the BT surface using 3.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 13.20-11.20mm. 0.17cum of 6.7-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing HM stones
Providing KM stones
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
PriceBid.pdf
Tender Documents • 0.40 MB
TechnicalBid.pdf
Tender Documents • 1.07 MB
BOQ_798532.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .