Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹4.8 L
EMD Value
₹9,500
Closing Date
6 Jun 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering Complex Budgam
Installation of dust bins at Tangnar near Sukhnag View Point Parishas, Sochalpathri, Dobiwan Hutment area 1st at Dodhpathri, Hutment area 2nd Dodhpathri and at Shaliganga.
2026_PWDJK_310322_3
NIT_No_17_DB_2026-27
Open Tender
Civil Works
Percentage
25 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Budgame
₹9,500
3 Jun 2026
19 May 2026
8 Jun 2026
19 May 2026
6 Jun 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 14.06 | cum | 592.9 | ₹8,336.17 |
| 2 | P/L of stone soling incl. ramming,hand packing and all carriages, complete job in geocell,trenches,foundation etc. | 4.07 | cum | 1,100 | ₹4,477 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Mud mat | 1.85 | cum | 5,202.9 | ₹9,625.37 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 6.66 | cum | 6,591.25 | ₹43,897.73 |
| 5 | FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 59.94 | sqm | 142.05 | ₹8,514.48 |
| 6 | Supplying and fixing Swing Type Pole Mounted Twin Dustbin made of SS 304 grade stainless steel, each bin of 60-liter capacity, mounted on powder-coated MS pole with base plate and anchor bolts, complete with swing lid mechanism, protective SS roof cover, and anti-rust finish. Including all necessary hardware, installation, and transportation. | 37 | cum | 10,803 | ₹3,99,711 |
stage.html
html • 0.02 MB
finance_1003999.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_1003999.xls
BOQ • 0.28 MB
Extension17last.pdf
PDF • 0.76 MB
Extn17.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .