| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.4 LRejected-AOC | ₹1.4 L | L2 | Rejected-AOC Rejected |
| 3 | L3₹1.4 LRejected-AOC 11 | VIRUDHUNAGAR | TAMIL NADU | 626202 | ₹1.4 L | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Madasamy L3 | NARPAVI TRADERS L2 | Linga Kumar L L1 |
|---|---|---|---|---|---|---|
| 1.00Name of Work: Providing Paver Block Arrangement South streert first cross at kandhankudierupu in Moolakarai Village Panchayat. | ||||||
| 2.00 | Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete. | 3.42 | Cum | 118.04 ₹403.70 | 116.06 ₹396.93 | 116 ₹396.72 |
| 3.00 | Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete. | 1.71 | Cum | 5,001.71 ₹8,552.92 | 4,917.88 ₹8,409.57 | 4,904 ₹8,385.84 |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing | 10.83 | Sqm | 326.68 ₹3,537.89 | 321.2 ₹3,478.60 | 321 ₹3,476.43 |
| 5.00 | Plain Cement concrete 1:3:6 using 20mm HBG jelly including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 4.33 | Sqm | 5,678.06 ₹24,586 | 5,582.9 ₹24,173.96 | 5,568 ₹24,109.44 |
| 6.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. | 8.55 | Cum | 2,411.31 ₹20,616.69 | 2,370.92 ₹20,271.37 | 2,365 ₹20,220.75 |
| 7.00 | Collection and supply of 6mm metal from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 4.28 | Cum | 1,082.4 ₹4,632.69 | 1,064.19 ₹4,554.73 | 1,062 ₹4,545.36 |
| 8.00 | Providing and Laying of Interlocking Rubber moulded Hydraulic pressed Paver block Pavements specification clause 1504, M30 grade 63 mm thickness paver block | 85.5 | Sqm | 644.92 ₹55,140.58 | 634.11 ₹54,216.41 | 633 ₹54,121.50 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 21,145 ₹21,145 | 20,790 ₹20,790 | 20,746 ₹20,746 |
Tender Value
₹1.6 L
EMD Value
₹1,610
Closing Date
18 Feb 2026, 3:00 pmClosed
Block Developmenet officer (VP)
Block Developmenet officer (VP)
Providing Paver Block Arrangement South streert first cross at kandhankudierupu in Moolakarai Village Panchayat Triuchenudr Union
2026_RDTN_654451_1
T2/0361/2026
Open Tender
Civil Works - Buildings
60 days
Tiruchendur Union
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹1,610
Panchayat Union office, Tiruchendur
13 Apr 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
17 Feb 2026
Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.
Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Plain Cement concrete 1:3:6 using 20mm HBG jelly including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.
Collection and supply of 6mm metal from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Providing and Laying of Interlocking Rubber moulded Hydraulic pressed Paver block Pavements specification clause 1504, M30 grade 63 mm thickness paver block
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_784733.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_784733.xls
BOQ • 0.28 MB
TechnicalBidsinglecoverPBArrangementSouthstreertfirstcrossatkandhankudierupuinMoolakaraiPanchayat.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid